{"schema_version":1,"build":{"version":"2026.1-3893f58866","generated_at":"2026-11-12T11:26:04Z"},"scope_note":"Two short, hand-read lists. Projects: mines, plants and recycling sites that are planned or under construction and have a publicly announced capital cost, public financial backing, or both. Finance events: stockpiles, price floors, offtake and purchasing programmes and public funds. Every amount, status and date is one statement on one page by the named publisher, quoted on the record; nothing is summed, converted or estimated. An announced amount is not spending, and a letter of interest or a conditional commitment is not a loan. The lists are not complete: a project or instrument that is missing is missing from the list, not from the world.","sources":[{"id":"public-announcements","name":"Public announcements of project financing and public support instruments (agency and company press releases, programme pages, official journals)","publisher":"The government body, public bank or company named on each record","url":"https://github.com/Lowrexius/openore/blob/main/data/investment_pipeline.yaml","licence":"No single licence. A fact with a quotation of at most 30 words, the publisher and a link; each record shows its publisher's own reuse statement where one was read","licence_url":"https://github.com/Lowrexius/openore/blob/main/data/announcement_publishers.yaml","redistribution":"allowed","cadence":"hand-read; re-read before each data release","terms_checked_at":"2026-11-13","last_success_at":"2026-11-16T10:51:38Z"}],"projects":[{"id":"allied-material-toyama-tungsten","name":"Allied Material new tungsten powder plant, Toyama","company":"株式会社アライドマテリアル (A.L.M.T. Corp.)","country_iso3":"JPN","materials":["tungsten"],"kind":"processing","kind_as_printed":"タングステン粉末および炭化タングステン粉末の新工場 (還元および炭化工程)","status":"planned","status_as_printed":"新工場を建設します; 2028 年度上期の稼働開始を目指し","status_statement":{"publisher":"株式会社アライドマテリアル","quote":"総額約 159 億円を投資、2028 年度上期稼働へ","provenance":{"source_id":"株式会社アライドマテリアル","source_url":"https://www.allied-material.co.jp/dcms_media/other/NewsRelease_20260409.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Ministry of Economy, Trade and Industry (経済産業省)","instrument":"grant","stage_as_printed":"助成金支援の対象となる「重要鉱物に係る供給確保計画」に認定されました","statement":{"publisher":"株式会社アライドマテリアル","quote":"より助成金支援の対象となる「重要鉱物に係る供給確保計画」に認定されました。","provenance":{"source_id":"株式会社アライドマテリアル","source_url":"https://www.allied-material.co.jp/dcms_media/other/NewsRelease_20260409.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"near the Toyama works, Toyama Prefecture","capex":{"amount":15900000000,"currency":"JPY","covers":"construction of the new plant and expansion of related equipment for tungsten powder and tungsten carbide powder","statement":{"publisher":"株式会社アライドマテリアル","quote":"に約 159 億円を投資します。","provenance":{"source_id":"株式会社アライドマテリアル","source_url":"https://www.allied-material.co.jp/dcms_media/other/NewsRelease_20260409.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"alpha-hpa-first-project","name":"HPA First Project (Stage Two)","company":"Alpha HPA Limited","country_iso3":"AUS","materials":["aluminium"],"kind":"processing","kind_as_printed":"full-scale commercial plant producing high purity alumina (HPA) and related high purity aluminium products","status":"construction","status_as_printed":"construction achievement on the Stage Two development of the HPA First Facility","status_statement":{"publisher":"Alpha HPA Limited","quote":"McCosker Contracting and Alpha HPA have celebrated a significant safety and construction achievement on the Stage Two development of Alpha HPA's HPA First Facility in Gladstone.","provenance":{"source_id":"Alpha HPA Limited","source_url":"https://alphahpa.com.au/mccosker-and-alpha-hpa-celebrate-150000-safe-hours/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"National Reconstruction Fund Corporation (NRFC)","instrument":"equity","stage_as_printed":"has approved a $75 million investment in the Company","statement":{"publisher":"Alpha HPA Limited","quote":"the National Reconstruction Fund Corporation (NRFC) has approved a $75 million investment in the Company, supporting delivery of the HPA First Facility in Gladstone, Queensland.","provenance":{"source_id":"Alpha HPA Limited","source_url":"https://alphahpa.com.au/alpha-hpa-secures-75m-investment-to-strengthen-australias-sovereign-advanced-materials-supply-chain/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the release calls it a cornerstone commitment in a $225 million funding round"}},"amount":75000000,"currency":"AUD"},{"body":"Northern Australia Infrastructure Facility (NAIF)","instrument":"loan","stage_as_printed":"Contractual Close","statement":{"publisher":"Northern Australia Infrastructure Facility","quote":"NAIF Loan Amount up to $200m","provenance":{"source_id":"Northern Australia Infrastructure Facility","source_url":"https://www.naif.gov.au/our-projects/alpha-hpa-first-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-01","licence":"Commonwealth copyright; reproduction in unaltered form for personal or non-commercial use, otherwise only uses permitted under the Copyright Act 1968 (NAIF legal notices). A fact and a quotation of at most 30 words, attributed and linked","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"project page is undated; it prints 'Investment Decision January 2024' and 'Project Status Contractual Close'"}},"amount":200000000,"currency":"AUD"}],"place":"Gladstone, Queensland"},{"id":"arctic-upper-kobuk","name":"Arctic Project","company":"Ambler Metals LLC","country_iso3":"USA","materials":["copper"],"kind":"mine","kind_as_printed":"open-pit","status":"planned","status_as_printed":"targeting a Record of Decision in September 2028","status_statement":{"publisher":"Trilogy Metals Inc.","quote":"The schedule sets an estimated 29-month integrated review timetable targeting a Record of Decision in September 2028","provenance":{"source_id":"Trilogy Metals Inc.","source_url":"https://trilogymetals.com/news-and-media/news/trilogy-metals-reports-third-quarter-fiscal-2026-financial-results/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of War","instrument":"equity","stage_as_printed":"Closing","statement":{"publisher":"Trilogy Metals Inc.","quote":"Closing of the DOW $35.6 million strategic equity investment subsequent to quarter end on September 11, 2026.","provenance":{"source_id":"Trilogy Metals Inc.","source_url":"https://trilogymetals.com/news-and-media/news/trilogy-metals-reports-third-quarter-fiscal-2026-financial-results/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the event itself to 2026-09-11"}},"amount":35600000,"currency":"USD"}],"place":"northwestern Alaska","capex":{"amount":1176800000,"currency":"USD","covers":"Initial capital expenditure (2023 Arctic feasibility study); sustaining capital and closure are separate figures","statement":{"publisher":"Trilogy Metals Inc.","quote":"Initial capital expenditure is $1,176.8 million and sustaining capital is $114.4 million","provenance":{"source_id":"Trilogy Metals Inc.","source_url":"https://trilogymetals.com/news-and-media/news/trilogy-metals-announces-updated-feasibility-study-results-for-the-arctic-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-02-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"barroso-lithium","name":"Barroso Lithium Project","company":"Savannah Lithium, Unipessoal, Lda.","country_iso3":"PRT","materials":["lithium"],"kind":"mine","kind_as_printed":"extraction project","status":"planned","status_as_printed":"Production targeted for end 2028","status_statement":{"publisher":"Savannah Resources Plc","quote":"Production targeted for end 2028.","provenance":{"source_id":"Savannah Resources Plc","source_url":"https://savannahresources.com/wp-content/uploads/2026/10/Savannah_IMCPresentation_Oct2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-01","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation prints only 'OCTOBER 2026'"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 5)","statement":{"publisher":"European Commission","quote":"Barroso Lithium Project is an ongoing extraction project in Portugal. The project promoted by Savannah Lithium, Unipessoal, Lda.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"Portuguese State","instrument":"grant","stage_as_printed":"Awarded a non-reimbursable grant of up to","statement":{"publisher":"Savannah Resources Plc","quote":"Awarded a non-reimbursable grant of up to EUR110m by the Portuguese State","provenance":{"source_id":"Savannah Resources Plc","source_url":"https://savannahresources.com/wp-content/uploads/2026/04/Financial-Results-for-the-Year-Ended-31-Dec-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":110000000,"currency":"EUR"},{"body":"German Government","instrument":"loan_guarantee","stage_as_printed":"eligible for a loan guarantee","statement":{"publisher":"Savannah Resources Plc","quote":"eligible for a loan guarantee from the German Government for up to USD270m","provenance":{"source_id":"Savannah Resources Plc","source_url":"https://savannahresources.com/wp-content/uploads/2026/04/Financial-Results-for-the-Year-Ended-31-Dec-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":270000000,"currency":"USD"}],"capex":{"amount":418000000,"currency":"USD","covers":"Capex total including pre-strip & contingency (Phase 1 DFS, July 2026); US$323m net of the State Grant","statement":{"publisher":"Savannah Resources Plc","quote":"Capex: Total of US$418m including pre-strip & contingency US$323m required net of US$95m contribution from State Grant","provenance":{"source_id":"Savannah Resources Plc","source_url":"https://savannahresources.com/wp-content/uploads/2026/10/Savannah_IMCPresentation_Oct2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-01","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation prints only 'OCTOBER 2026'"}}}},{"id":"caremag-lacq","name":"CAREMAG","company":"Caremag SAS","country_iso3":"FRA","materials":["rare-earths"],"kind":"processing","kind_as_printed":"processing project (Commission annex); rare earth recycling and refining industrial facility (company)","status":"construction","status_as_printed":"ont posé la première pierre de l’usine Caremag","status_statement":{"publisher":"Direction générale du Trésor","quote":"les ministres Laurent Saint-Martin et Agnès Pannier-Runacher ont posé la première pierre de l’usine Caremag","provenance":{"source_id":"Direction générale du Trésor","source_url":"https://www.tresor.economie.gouv.fr/Articles/2025/03/31/breves-economiques-japon-coree-du-sud-periode-du-1er-au-31-mars-2025","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"quote_en":"the ministers Laurent Saint-Martin and Agnès Pannier-Runacher laid the foundation stone of the Caremag plant"},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 7)","statement":{"publisher":"European Commission","quote":"CAREMAG is an ongoing processing project in France. The project promoted by Caremag SAS","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"French government","instrument":"other","stage_as_printed":"subsidies and repayable advances granted under the France Relance and France 2030 project calls, as well as a Green Industry tax credit","statement":{"publisher":"Carester","quote":"this project is backed by €110 million from Japanese investors and €106 million from the French government","provenance":{"source_id":"Carester","source_url":"https://www.carester.fr/wp-content/uploads/2025/03/press-release-ENG-without-embargo.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-17","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":106000000,"currency":"EUR"}],"place":"Lacq, in the south of France","capex":{"amount":216000000,"currency":"EUR","covers":"financing secured to build the rare earth recycling and refining industrial facility in Lacq (printed as financing, not as a cost estimate)","statement":{"publisher":"Carester","quote":"has secured €216 million to build its cutting-edge rare earth recycling and refining industrial facility in Lacq","provenance":{"source_id":"Carester","source_url":"https://www.carester.fr/wp-content/uploads/2025/03/press-release-ENG-without-embargo.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-17","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"cauchari-olaroz-ampliacion","name":"Ampliación Cauchari Olaroz","company":"Minera Exar Sucursal Dedicada","country_iso3":"ARG","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Ampliación Cauchari Olaroz (additional production line of 45.000 t per year of lithium carbonate equivalent)","status":"planned","status_as_printed":"inversiones … en noventa (90) meses contados desde el mes de julio de 2026; inicio de operación para diciembre del año 2028","status_statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"noventa (90) meses contados desde el mes de julio de 2026, y estimó el inicio de operación para diciembre del año 2028","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342818/20260605","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-05","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)","instrument":"other","stage_as_printed":"Apruébase la solicitud de adhesión; adhesion date 9 May 2026","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342818/20260605","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-05","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Resolución 825/2026 of 4 June 2026; adhesion to a regime of tax, customs and foreign-exchange incentives, not a payment of public money"}}}],"place":"Salares de Cauchari y Olaroz, Susques department, Jujuy province","capex":{"amount":1166677726,"currency":"USD","covers":"total investment in computable assets declared by the applicant in its RIGI investment plan for the expansion","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"inversión total en activos computables de mil ciento sesenta y seis millones seiscientos setenta y siete mil setecientos veintiséis dólares estadounidenses (USD 1.166.677.726)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342818/20260605","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-05","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"centinela-second-concentrator","name":"Centinela Second Concentrator Project","company":"Antofagasta plc","country_iso3":"CHL","materials":["copper"],"kind":"processing","kind_as_printed":"Centinela Second Concentrator Project (brownfield development)","status":"construction","status_as_printed":"pre-commissioning activities continued during H1 2026 alongside key construction milestones; table: Underway, 2027: Complete construction and commissioning","status_statement":{"publisher":"Antofagasta plc","quote":"At the Centinela Second Concentrator Project, pre-commissioning activities continued during H1 2026 alongside key construction milestones","provenance":{"source_id":"Antofagasta plc","source_url":"https://www.antofagasta.co.uk/investors/news/2026/2026-half-year-results/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the web page is undated; the date is that of the half year results news release (13 August 2026)"}},"backing":[],"place":"Centinela District, Chile","capex":{"amount":4400000000,"currency":"USD","covers":"capital cost estimate as announced in December 2023; the source says it was subsequently reduced by $380 million after the outsourcing of Centinela's water infrastructure, and prints $3.3bn of capex to date at 30 June 2026","statement":{"publisher":"Antofagasta plc","quote":"Figure quoted here ($4.4 billion) is the figure provided on announcement in December 2023, which was subsequently reduced by $380 million","provenance":{"source_id":"Antofagasta plc","source_url":"https://www.antofagasta.co.uk/media/4972/20260813_antofagasta-hy26-aug26-vf.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the same report lists capital expenditure overruns at this project among its risks; no updated total is printed"}}}},{"id":"cinovec-lithium","name":"Cínovec lithium project","company":"Geomet s.r.o.","country_iso3":"CZE","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"integrated extraction and processing project","status":"planned","status_as_printed":"definitive feasibility study complete; shareholders will decide on the implementation and financing of the next stage","status_statement":{"publisher":"ČEZ","quote":"Geomet will now present the completed study to its shareholders, who will decide on the implementation and financing of the project’s next stage.","provenance":{"source_id":"ČEZ","source_url":"https://www.cez.cz/en/media/press-releases/finalni-studie-proveditelnosti-je-hotova.-potvrdila-ze-projekt-tezby-a-zpracovani-lithia-je-realizovatelny.-do-konce-roku-bude-podana-eia-230527","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 9)","statement":{"publisher":"European Commission","quote":"Cínovec lithium project is an ongoing integrated extraction and processing project in Czechia. The project promoted by Geomet s.r.o.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"Fair Transition Fund","instrument":"grant","stage_as_printed":"subsidy received this April","statement":{"publisher":"ČEZ","quote":"the CZK 800 million subsidy from the Fair Transition Fund that Geomet received this April","provenance":{"source_id":"ČEZ","source_url":"https://www.cez.cz/en/media/press-releases/finalni-studie-proveditelnosti-je-hotova.-potvrdila-ze-projekt-tezby-a-zpracovani-lithia-je-realizovatelny.-do-konce-roku-bude-podana-eia-230527","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":800000000,"currency":"CZK"},{"body":"Czech government (Strategic Investments for a Climate Neutral Economy programme)","instrument":"grant","stage_as_printed":"approved a subsidy of up to; to be drawn between 2029 and 2031","statement":{"publisher":"ČEZ","quote":"Czech government also approved a subsidy of up to 350 million euros (CZK 8.8 billion) from the Strategic Investments for a Climate Neutral Economy programme","provenance":{"source_id":"ČEZ","source_url":"https://www.cez.cz/en/media/press-releases/finalni-studie-proveditelnosti-je-hotova.-potvrdila-ze-projekt-tezby-a-zpracovani-lithia-je-realizovatelny.-do-konce-roku-bude-podana-eia-230527","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":350000000,"currency":"EUR"}],"place":"Cínovec and Prunéřov, Ústí nad Labem Region","capex":{"amount":42000000000,"currency":"CZK","covers":"total investment of the lithium park (printed as 'more than 42 billion CZK')","statement":{"publisher":"ČEZ","quote":"The total investment of the lithium park is estimated at more than 42 billion CZK.","provenance":{"source_id":"ČEZ","source_url":"https://www.cez.cz/en/media/press-releases/finalni-studie-proveditelnosti-je-hotova.-potvrdila-ze-projekt-tezby-a-zpracovani-lithia-je-realizovatelny.-do-konce-roku-bude-podana-eia-230527","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"donald-rare-earth-mineral-sands","name":"Donald Mineral Sands Project","company":"Astron Corporation","country_iso3":"AUS","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"Donald Mineral Sands Project (a major new Australian source of light and heavy rare earths)","status":"planned","status_as_printed":"financing conditionally approved; will create 200 construction jobs","status_statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"The Donald Mineral Sands Project will create 200 construction jobs and 100 ongoing operational jobs, unlocking a major new Australian source of light and heavy rare earths.","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/more-investment-more-jobs-for-australia-s-critical-minerals-future/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the company's own project page (undated) prints 'Final Investment Decision targeted 2026'; no dated company statement of the standing could be read"}},"backing":[{"body":"Export Finance Australia","instrument":"other","stage_as_printed":"conditionally approved up to A$70 million in financing","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"Export Finance Australia (EFA) has conditionally approved up to A$70 million in financing for Astron Corporation’s Donald Mineral Sands Project in regional Victoria","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/more-investment-more-jobs-for-australia-s-critical-minerals-future/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":70000000,"currency":"AUD"},{"body":"National Reconstruction Fund (NRF)","instrument":"other","stage_as_printed":"conditional approval of A$110 million investment","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"alongside conditional approval of A$110 million investment from the National Reconstruction Fund (NRF)","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/more-investment-more-jobs-for-australia-s-critical-minerals-future/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":110000000,"currency":"AUD"}],"place":"regional Victoria"},{"id":"el-abra-continuidad","name":"Continuidad Operacional Minera El Abra","company":"SCM El Abra (Freeport)","country_iso3":"CHL","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"Continuidad Operacional Minera El Abra","status":"planned","status_as_printed":"ingresó su EIA en marzo de 2026 (environmental impact study filed, under assessment)","status_statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"El Abra: ingresó su EIA en marzo de 2026 por US$7.500 MM declarados; estaba catastrado como potencial y sin tramitación iniciada","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation dated 'Agosto de 2026'; its 2026 section is marked as work in progress, not the official 2026-2035 portfolio figure"}},"backing":[],"place":"Chile (the source does not print the region)","capex":{"amount":7500000000,"currency":"USD","covers":"investment declared by the holder on filing the environmental impact study (EIA) with Chile's environmental assessment system","statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"El Abra: ingresó su EIA en marzo de 2026 por US$7.500 MM declarados","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"electra-cobalt-refinery","name":"cobalt sulfate refinery","company":"Electra Battery Materials Corporation","country_iso3":"CAN","materials":["cobalt"],"kind":"processing","kind_as_printed":"cobalt sulfate refinery","status":"planned","status_as_printed":"early works program ... to prepare for the restart of full-scale construction","status_statement":{"publisher":"Electra Battery Materials Corporation","quote":"The early works program encompasses targeted site-level activities designed to prepare for the restart of full-scale construction.","provenance":{"source_id":"Electra Battery Materials Corporation","source_url":"https://electrabmc.com/news-releases/news/electra-commences-early-works-to-support-restart-of-north-americas-only-cobalt-refinery","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of Defense (Defense Production Act Title III)","instrument":"grant","stage_as_printed":"awarded","statement":{"publisher":"Electra Battery Materials Corporation","quote":"it has been awarded $20 million by the U.S. Department of Defense","provenance":{"source_id":"Electra Battery Materials Corporation","source_url":"https://www.electrabmc.com/news-releases/news/electra-awarded-20-million-from-us-department-of-defense-under-the-defense-production-act","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":20000000,"currency":"USD"}],"place":"Temiskaming Shores","capex":{"amount":250000000,"currency":"USD","covers":"refinery project (release states all amounts in US dollars unless otherwise stated)","statement":{"publisher":"Electra Battery Materials Corporation","quote":"The $250 million refinery project is located north of Toronto, in Temiskaming Shores","provenance":{"source_id":"Electra Battery Materials Corporation","source_url":"https://www.electrabmc.com/news-releases/news/electra-awarded-20-million-from-us-department-of-defense-under-the-defense-production-act","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"elk-creek","name":"Elk Creek Project","company":"NioCorp Developments Ltd.","country_iso3":"USA","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"Processing Plant and Mining Operation Producing Eight Critical Minerals","status":"planned","status_as_printed":"subject to satisfactory completion of EXIM’s current due diligence review of NioCorp’s application for debt financing","status_statement":{"publisher":"NioCorp Developments Ltd.","quote":"subject to satisfactory completion of EXIM’s current due diligence review of NioCorp’s application for debt financing","provenance":{"source_id":"NioCorp Developments Ltd.","source_url":"https://www.niocorp.com/exim-reiterates-target-to-finance-approximately-65-of-elk-creek-project-upfront-capex/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Export-Import Bank of the United States","instrument":"other","stage_as_printed":"letter of support","statement":{"publisher":"Export-Import Bank of the United States","quote":"The Export-Import Bank of the United States’ letter of support marks an important step towards making the Elk Creek Critical Minerals Project a reality","provenance":{"source_id":"Export-Import Bank of the United States","source_url":"https://www.exim.gov/news/chairman-jovanovic-signs-letter-support-for-niocorps-elk-creek-mine-tours-innovative-project","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"Export-Import Bank of the United States","instrument":"other","stage_as_printed":"target ... of providing debt financing equivalent to approximately 65% of the Project’s upfront CAPEX requirements","statement":{"publisher":"NioCorp Developments Ltd.","quote":"EXIM retains our target outlined in the Preliminary Project Letter of providing debt financing equivalent to approximately 65% of the Project’s upfront CAPEX requirements","provenance":{"source_id":"NioCorp Developments Ltd.","source_url":"https://www.niocorp.com/exim-reiterates-target-to-finance-approximately-65-of-elk-creek-project-upfront-capex/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"southeast Nebraska","capex":{"amount":1850000000,"currency":"USD","covers":"Upfront Capital Estimate (2026 Feasibility Study); table row: Total Upfront CAPEX ($M) $1,849","statement":{"publisher":"NioCorp Developments Ltd.","quote":"Upfront Capital Estimate of $1.85 Billion Reflects a Substantially Redesigned Processing Plant and Mining Operation","provenance":{"source_id":"NioCorp Developments Ltd.","source_url":"https://www.niocorp.com/niocorp-project-to-expand-production-to-8-made-in-usa-critical-minerals-over-a-40-year-mine-life-with-an-estimated-4-1-billion-pre-tax-npv8%C2%B9/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-10","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"emili-beauvoir","name":"EMILI","company":"IMERYS Ceramics France and IMERYS Lithium France","country_iso3":"FRA","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"integrated extraction and processing project","status":"planned","status_as_printed":"finalisation de l'étude de faisabilité définitive, jalon majeur prévu début 2027","status_statement":{"publisher":"Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique","quote":"vise à accompagner le projet EMILI dans la finalisation de l'étude de faisabilité définitive, jalon majeur prévu début 2027","provenance":{"source_id":"Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique","source_url":"https://presse.economie.gouv.fr/?p=170651","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"quote_en":"aims to support the EMILI project in completing the definitive feasibility study, a major milestone planned for early 2027"},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 12)","statement":{"publisher":"European Commission","quote":"EMILI is an ongoing integrated extraction and processing project in France. The project promoted by IMERYS Ceramics France and IMERYS Lithium France","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"État français (via Banque des Territoires, France 2030)","instrument":"equity","stage_as_printed":"prise de participation de l'État au capital du projet (annoncée)","statement":{"publisher":"Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique","quote":"L'investissement de l'État d'un montant de 50 millions d'euros","provenance":{"source_id":"Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique","source_url":"https://presse.economie.gouv.fr/?p=170651","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"quote_en":"The State's investment of 50 million euros"},"amount":50000000,"currency":"EUR"},{"body":"EU Innovation Fund","instrument":"grant","stage_as_printed":"table column 'Innovation Fund grant (EUR million)'; project start 01/09/2026; covers the lithium hydroxide refinery plant","statement":{"publisher":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","quote":"01/09/2026 Imerys Holding | Imerys 2,332,289 116.0","provenance":{"source_id":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","source_url":"https://ec.europa.eu/assets/cinea/country_factsheets/innovation_fund/INNOVFUND_France.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-01","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"factsheet prints 'State of play: November 2026' (no day)"}},"amount":116000000,"currency":"EUR"}],"place":"Allier"},{"id":"eneabba-rare-earths-refinery","name":"Eneabba Rare Earths Refinery","company":"Iluka Resources Limited","country_iso3":"AUS","materials":["rare-earths"],"kind":"processing","kind_as_printed":"fully integrated refinery for the production of separated rare earth oxides","status":"construction","status_as_printed":"Construction is 65% complete","status_statement":{"publisher":"Iluka Resources Limited","quote":"Iluka is building Australia’s first fully integrated refinery for the production of separated rare earth","provenance":{"source_id":"Iluka Resources Limited","source_url":"https://www.iluka.com/media/uhakaf1b/28oct26-quarterly-review-to-30-september-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Australian Government, Critical Minerals Facility administered by Export Finance Australia","instrument":"loan","stage_as_printed":"The Australian Government’s contribution was a $1.25 billion non-recourse loan","statement":{"publisher":"Iluka Resources Limited","quote":"The Australian Government’s contribution was a $1.25 billion non -recourse loan via the Critical Minerals Facility administered by Export Finance Australia (EFA).","provenance":{"source_id":"Iluka Resources Limited","source_url":"https://www.iluka.com/documents/2024/asx-releases/eneabba-rare-earths-refinery-funding-update/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the address answers with the PDF https://www.iluka.com/media/14mesbwj/6dec24-eneabba-rare-earths-positive-outcome-of-funding-discussions.pdf; the odd spacing in 'non -recourse' is how the PDF text reads; the statement describes the original 2022 loan"}},"amount":1250000000,"currency":"AUD"},{"body":"Australian Government, Critical Minerals Facility administered by Export Finance Australia","instrument":"loan","stage_as_printed":"agreement has been reached on key indicative terms; will contribute an additional $400 million","statement":{"publisher":"Iluka Resources Limited","quote":"The Australian Government will contribute an additional $400 million, on terms consistent with the original $1.25 billion non -recourse loan.","provenance":{"source_id":"Iluka Resources Limited","source_url":"https://www.iluka.com/documents/2024/asx-releases/eneabba-rare-earths-refinery-funding-update/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":400000000,"currency":"AUD"},{"body":"Australian Government, Critical Minerals Facility (Export Finance Australia)","instrument":"loan","stage_as_printed":"providing up to $475 million in additional finance","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"providing up to $475 million in additional finance to develop the Eneabba Rare Earths Refinery project in Western Australia","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/additional-support-for-rare-earths-refining-for-a-future-made-in-australia/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the same additional support as the entry above, as the Government prints it (Iluka prints $400 million plus a cost overrun facility); the two are not added up"}},"amount":475000000,"currency":"AUD"}],"place":"Eneabba, Western Australia","capex":{"amount":1700000000,"currency":"AUD","covers":"capital estimate for the Eneabba rare earths refinery, printed as a range of $1.7-1.8 billion; the lower end is recorded. The same page says $1,237 million had been spent to 30 September 2026","statement":{"publisher":"Iluka Resources Limited","quote":"Total capex expenditure to 30 September 2026 is $1,237 million. The capital estimate for the project remains $1.7-1.8 billion.","provenance":{"source_id":"Iluka Resources Limited","source_url":"https://www.iluka.com/media/uhakaf1b/28oct26-quarterly-review-to-30-september-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"epanko","name":"Epanko Graphite Project","company":"EcoGraf Limited","country_iso3":"TZA","materials":["graphite"],"kind":"mine","kind_as_printed":"Epanko Graphite Mine (Stage 1, 73,000 tonnes a year)","status":"planned","status_as_printed":"Debt financing advanced (led by KfW IPEX-Bank); strategic equity process commenced","status_statement":{"publisher":"EcoGraf Limited","quote":"Debt financing advanced (led by KfW IPEX-Bank) with rigorous and extensive independent due diligence complete","provenance":{"source_id":"EcoGraf Limited","source_url":"https://www.ecograf.com.au/wp-content/uploads/2026/10/20261027_EGR_Corporate-Presentation-IMARC.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Federal Republic of Germany, Untied Loan Guarantee (UFK) scheme","instrument":"loan_guarantee","stage_as_printed":"non-binding indication that the Epanko Project is, in principle, eligible for import credit cover","statement":{"publisher":"EcoGraf Limited","quote":"non-binding indication that the Epanko Project is, in principle, eligible for import credit cover under the UFK program","provenance":{"source_id":"EcoGraf Limited","source_url":"https://www.ecograf.com.au/wp-content/uploads/2026/07/04_EGR_ASX_Quarterly-Activities-Report_June-2026_Lodgement.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"no binding offer of cover; an expert opinion is required before Preliminary Approval"}}},{"body":"KfW IPEX-Bank (arranger), under the German Government UFK program","instrument":"loan","stage_as_printed":"mandated; leading US$105M senior debt","statement":{"publisher":"EcoGraf Limited","quote":"KfW IPEX-Bank leading US$105M senior debt under German Government UFK program for Stage 1 (73,000 tpa)","provenance":{"source_id":"EcoGraf Limited","source_url":"https://www.ecograf.com.au/wp-content/uploads/2026/10/20261027_EGR_Corporate-Presentation-IMARC.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"a mandate to arrange the loan, not a signed facility"}},"amount":105000000,"currency":"USD"}],"place":"Tanzania","capex":{"amount":181200000,"currency":"USD","covers":"pre-production capital cost of Stage 1 in real 2025 terms (updated bankable feasibility study); the resettlement action plan of US$18.1M is printed separately","statement":{"publisher":"EcoGraf Limited","quote":"Pre-production Capex: US$181.2M & RAP: US$18.1M (incl. contingencies)","provenance":{"source_id":"EcoGraf Limited","source_url":"https://www.ecograf.com.au/wp-content/uploads/2026/03/3035613.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"slides print March 2026"}}}},{"id":"escondida-nueva-concentradora","name":"Nueva Planta Concentradora (Escondida)","company":"Minera Escondida (BHP)","country_iso3":"CHL","materials":["copper"],"kind":"processing","kind_as_printed":"nueva concentradora y obras eléctricas","status":"planned","status_as_printed":"BHP proyecta su decisión de inversión hacia 2027-2028","status_statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"BHP proyecta su decisión de inversión hacia 2027-2028","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation dated 'Agosto de 2026'; its 2026 section is marked as work in progress, not the official 2026-2035 portfolio figure"}},"backing":[],"place":"Chile (the source does not print the region)","capex":{"amount":5150000000,"currency":"USD","covers":"investment declared on filing the environmental declaration (DIA) for the new concentrator and electrical works","statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"Escondida: ingresó a evaluación la DIA de su nueva concentradora y obras eléctricas por US$5.150 MM","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"etango","name":"Etango Uranium Project","company":"Bannerman Energy Ltd","country_iso3":"NAM","materials":["uranium"],"kind":"mine_and_processing","kind_as_printed":"Etango Project (Etango-8 Definitive Feasibility Study)","status":"planned","status_as_printed":"Etango Final Investment Decision (FID) in H2 2026; full-scale construction start during H2 2026","status_statement":{"publisher":"Bannerman Energy Ltd","quote":"Etango Final Investment Decision (FID) in H2 2026 Full-scale Etango construction start during H2 2026 First Etango uranium production targeted in 2028","provenance":{"source_id":"Bannerman Energy Ltd","source_url":"https://bannermanenergy.com/wp-content/uploads/2026/04/260410_Investor-Presentation_April-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation prints April 2026; early works were under way; whether the decision was taken afterwards was not read"}},"backing":[],"place":"Namibia","capex":{"amount":353000000,"currency":"USD","covers":"pre-production capital cost of the Etango-8 study, with costs updated in the release of 11 June 2024 (front-end engineering complete)","statement":{"publisher":"Bannerman Energy Ltd","quote":"US$353M Pre-production capex1","provenance":{"source_id":"Bannerman Energy Ltd","source_url":"https://bannermanenergy.com/wp-content/uploads/2026/04/260410_Investor-Presentation_April-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the \"1\" after capex is a footnote mark; the estimate dates from June 2024. The presentation also describes a planned 45% investment by CNOL, a subsidiary of China National Nuclear Corporation, which is an investor's stake and is not listed as public backing"}}}},{"id":"fen-rare-earths","name":"Fen Complex rare earths project (pilot plant)","company":"Rare Earths Norway","country_iso3":"NOR","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"pilot plant to demonstrate an integrated processing route from Fen Complex ore to rare earth element oxides","status":"planned","status_as_printed":"final investment decision to build a dedicated pilot plant; scheduled to commence operations in the third quarter of 2027","status_statement":{"publisher":"Rare Earths Norway","quote":"has made the final investment decision to build a dedicated pilot plant to demonstrate an integrated processing route from Fen Complex ore to rare earth element (REE) oxides","provenance":{"source_id":"Rare Earths Norway","source_url":"https://www.rareearthsnorway.com/news/rare-earths-norway-invests-in-pilot-plant/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Innovation Norway","instrument":"grant","stage_as_printed":"funding from Innovation Norway (included in the pilot plant's budget)","statement":{"publisher":"Rare Earths Norway","quote":"including EUR 5.4 million in funding from Innovation Norway and EUR 1.9 million from the Telemark Development Fund (TUF)","provenance":{"source_id":"Rare Earths Norway","source_url":"https://www.rareearthsnorway.com/news/rare-earths-norway-invests-in-pilot-plant/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page says 'funding', not which kind; 'grant' is our reading"}},"amount":5400000,"currency":"EUR"},{"body":"Telemark Development Fund (TUF)","instrument":"grant","stage_as_printed":"grant","statement":{"publisher":"Rare Earths Norway","quote":"is pleased that the EUR 1.9 million grant has helped make this possible","provenance":{"source_id":"Rare Earths Norway","source_url":"https://www.rareearthsnorway.com/news/rare-earths-norway-invests-in-pilot-plant/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":1900000,"currency":"EUR"}],"place":"Fen Complex, Telemark","capex":{"amount":24000000,"currency":"EUR","covers":"total budget of the pilot plant only; no cost of the mine itself is printed","statement":{"publisher":"Rare Earths Norway","quote":"The project has a total budget of EUR 24 million, including EUR 5.4 million in funding from Innovation Norway","provenance":{"source_id":"Rare Earths Norway","source_url":"https://www.rareearthsnorway.com/news/rare-earths-norway-invests-in-pilot-plant/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"graphite-creek","name":"Graphite Creek Project","company":"Graphite One Inc.","country_iso3":"USA","materials":["graphite"],"kind":"mine","kind_as_printed":"Graphite Creek mine development","status":"planned","status_as_printed":"Management’s current plan is for graphite to be mined","status_statement":{"publisher":"Graphite One Inc.","quote":"Management’s current plan is for graphite to be mined from the Company’s Graphite Creek Property","provenance":{"source_id":"Graphite One Inc.","source_url":"https://www.graphiteoneinc.com/wp-content/uploads/2026/01/Q3-2025-MDA-Final-1.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Export-Import Bank of the United States","instrument":"letter_of_interest","stage_as_printed":"Letter of Interest","statement":{"publisher":"Export-Import Bank of the United States","quote":"approving a $670 million Letter of Interest for Graphite One Inc. (G1) to support financing of the Company's Graphite Creek Project","provenance":{"source_id":"Export-Import Bank of the United States","source_url":"https://www.exim.gov/news/exim-delivers-for-america-2025","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-05","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the event itself to 2025-12-18"}},"amount":670000000,"currency":"USD"},{"body":"Export-Import Bank of the United States","instrument":"letter_of_interest","stage_as_printed":"non-binding and conditional and does not represent a financing commitment","statement":{"publisher":"Graphite One Inc.","quote":"Investors should be aware that the LoI is non-binding and conditional and does not represent a financing commitment.","provenance":{"source_id":"Graphite One Inc.","source_url":"https://www.graphiteoneinc.com/exim-bank-increases-letters-of-interest-for-the-graphite-one-supply-chain-to-2-07-billion/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"U.S. Department of Defense (Defense Production Act)","instrument":"grant","stage_as_printed":"drew down the remaining","statement":{"publisher":"Graphite One Inc.","quote":"the U.S. Department of Defense’s $37.5 million Technology Investment Agreement grant under the Defense Production Act","provenance":{"source_id":"Graphite One Inc.","source_url":"https://www.graphiteoneinc.com/wp-content/uploads/2026/01/Q3-2025-MDA-Final-1.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":37500000,"currency":"USD"}],"place":"north of Nome, Alaska"},{"id":"guben-lithium-converter","name":"Lithium Hydroxide Converter Guben","company":"Rock Tech Guben GmbH","country_iso3":"DEU","materials":["lithium"],"kind":"processing","kind_as_printed":"processing project","status":"planned","status_as_printed":"fully permitted; CapEx estimate updated","status_statement":{"publisher":"Rock Tech Lithium Inc.","quote":"another significant milestone in the development of the fully permitted Guben Lithium Converter on the German-Polish border","provenance":{"source_id":"Rock Tech Lithium Inc.","source_url":"https://rocktechlithium.com/wp-content/uploads/2025/10/Rock-Tech-News-Release-re-CapEx-Update-MoU-SCT-Arcore-Oct-22-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 24)","statement":{"publisher":"European Commission","quote":"Lithium Hydroxide Converter Guben is an ongoing processing project in Germany. The project promoted by Rock Tech Guben GmbH","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"Brandenburg’s Ministry for Economic Affairs, Labour and Energy","instrument":"grant","stage_as_printed":"has issued an LOI committing up to","statement":{"publisher":"Rock Tech Lithium Inc.","quote":"Brandenburg’s Ministry for Economic Affairs, Labour and Energy has issued an LOI committing up to 90 million EUR in grants","provenance":{"source_id":"Rock Tech Lithium Inc.","source_url":"https://rocktechlithium.com/en/rock-tech-to-receive-up-to-100-million-eur-in-direct-grants-for-its-german-lithium-refinery-funding-to-be-provided-by-the-state-of-brandenburg-and-the-german-railway-authority-further-applications-f/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-06-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":90000000,"currency":"EUR"},{"body":"German Railway Authority","instrument":"grant","stage_as_printed":"application for federal funding has been confirmed","statement":{"publisher":"Rock Tech Lithium Inc.","quote":"application for federal funding from the German Railway Authority has been confirmed and will provide a contribution of another 10 million Euros in grants","provenance":{"source_id":"Rock Tech Lithium Inc.","source_url":"https://rocktechlithium.com/wp-content/uploads/2025/05/20241231_Rock-Tech-MDA-Q4-2024-FINAL-for-SEDAR.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"period end of the 2024 MD&A that prints this"}},"amount":10000000,"currency":"EUR"}],"place":"Guben, Brandenburg","capex":{"amount":680000000,"currency":"EUR","covers":"CapEx for commissioning the facility (management estimate)","statement":{"publisher":"Rock Tech Lithium Inc.","quote":"management now estimates the CapEx for commissioning the facility at approximately €680 million, compared to the prior estimate of €730 million","provenance":{"source_id":"Rock Tech Lithium Inc.","source_url":"https://rocktechlithium.com/wp-content/uploads/2025/10/Rock-Tech-News-Release-re-CapEx-Update-MoU-SCT-Arcore-Oct-22-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},"later":[{"what":"Brandenburg’s Ministry for Economic Affairs, Labour and Energy: The LOI expired on December 31, 2024.","statement":{"publisher":"Rock Tech Lithium Inc.","quote":"The LOI expired on December 31, 2024.","provenance":{"source_id":"Rock Tech Lithium Inc.","source_url":"https://rocktechlithium.com/wp-content/uploads/2025/05/20241231_Rock-Tech-MDA-Q4-2024-FINAL-for-SEDAR.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"period end of the 2024 MD&A that prints this"}}}]},{"id":"hermosa-taylor","name":"Hermosa project (Taylor zinc-lead-silver development, Clark manganese deposit)","company":"South32","country_iso3":"USA","materials":["zinc","manganese"],"kind":"mine_and_processing","kind_as_printed":"Taylor zinc-lead-silver project at Hermosa","status":"construction","status_as_printed":"advancing construction of the Taylor zinc-lead-silver project at Hermosa","status_statement":{"publisher":"South32","quote":"We are advancing construction of the Taylor zinc-lead-silver project at Hermosa","provenance":{"source_id":"South32","source_url":"https://www.south32.net/docs/default-source/all-financial-results/financial-results-and-outlook-year-ended-30-june-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of War (Department of Defense)","instrument":"grant","stage_as_printed":"grant used to part fund construction of the exploration decline (Clark manganese deposit)","statement":{"publisher":"South32","quote":"with a US$20M grant from the US Department of War used to part fund construction of the exploration decline","provenance":{"source_id":"South32","source_url":"https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-0x428e857ed5e3eb3f.pdf?sfvrsn=441372c7_0","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the grant is for the Clark manganese deposit, not for Taylor; the statement does not date the award"}},"amount":20000000,"currency":"USD"},{"body":"U.S. Department of Energy","instrument":"grant","stage_as_printed":"grant to support the potential development of a future commercial-scale manganese production facility","statement":{"publisher":"South32","quote":"a US$166M grant from the US Department of Energy to support the potential development of a future commercial-scale manganese production facility","provenance":{"source_id":"South32","source_url":"https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-0x428e857ed5e3eb3f.pdf?sfvrsn=441372c7_0","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the company calls it a grant; whether an award agreement is signed was not read"}},"amount":166000000,"currency":"USD"},{"body":"U.S. Federal Permitting Improvement Steering Council (FAST-41)","instrument":"strategic_project_status","stage_as_printed":"the first mining project added to the US Government’s FAST-41 process","statement":{"publisher":"South32","quote":"Hermosa was the first mining project added to the US Government’s FAST-41 process","provenance":{"source_id":"South32","source_url":"https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-0x428e857ed5e3eb3f.pdf?sfvrsn=441372c7_0","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Arizona (the source prints \"Santa Cruz, Arizona\")","capex":{"amount":3300000000,"currency":"USD","covers":"growth capital expenditure for the Taylor deposit from 1 January 2024 to first production (real as at 1 July 2026), as revised on 30 April 2026; the Clark manganese deposit is not in this figure","statement":{"publisher":"South32","quote":"Growth capital expenditure revised to ~US$3,300M, with ~US$2,100M to be spent over Q4 FY26 to H2 FY28.","provenance":{"source_id":"South32","source_url":"https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-0x428e857ed5e3eb3f.pdf?sfvrsn=441372c7_0","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"hilarion","name":"Hilarión","company":"Nexa Resources Perú S.A.A.","country_iso3":"PER","materials":["zinc"],"kind":"mine","kind_as_printed":"Hilarión (zinc)","status":"planned","status_as_printed":"PRE-FACTIBILIDAD; start of execution P.D. (por definir)","status_statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"P.D. Hilarión Nexa Resources Perú. S.A.A. Áncash Zinc PRE-FACTIBILIDAD 585","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the book prints 'Primera edición - Lima - mayo de 2026'; the ministry's page lists it under 17 June 2026"}},"backing":[],"place":"Áncash","capex":{"amount":585000000,"currency":"USD","covers":"Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate)","statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"con Hilarión (US$ 585 millones) y Ayawilca (US$ 382 millones)","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"hvc-mine-life-extension","name":"Highland Valley Copper Mine Life Extension","company":"Teck Resources Limited","country_iso3":"CAN","materials":["copper"],"kind":"mine","kind_as_printed":"Highland Valley Copper Mine Life Extension Project (HVC MLE)","status":"construction","status_as_printed":"board approval for construction; construction is set to commence in full in August 2025","status_statement":{"publisher":"Teck Resources Limited","quote":"today announced board approval for construction of the Highland Valley Copper Mine Life Extension Project (HVC MLE)","provenance":{"source_id":"Teck Resources Limited","source_url":"https://www.teck.com/news/news-releases/2025/teck-announces-construction-of-highland-valley-copper-mine-life-extension-to-proceed","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"an extension of a mine that is in operation. On the date of this page construction was approved and about to start in full; no 2026 statement on its progress was found in text the helper could read"}},"backing":[],"place":"British Columbia","capex":{"amount":2400000000,"currency":"CAD","covers":"project capital estimate at sanction, printed as a range of $2.1 to $2.4 billion (the amount here is the upper end), to be invested from H2 2025 through 2028","statement":{"publisher":"Teck Resources Limited","quote":"the project capital estimate has been refined and is now expected to be between $2.1 to $2.4 billion","provenance":{"source_id":"Teck Resources Limited","source_url":"https://www.teck.com/news/news-releases/2025/teck-announces-construction-of-highland-valley-copper-mine-life-extension-to-proceed","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page prints '$' without a currency code; CAD is inferred from the publisher, which reports in Canadian dollars"}}}},{"id":"inola-aluminium-smelter","name":"Inola primary aluminium smelter","company":"Century Aluminum (to be developed jointly with Emirates Global Aluminium)","country_iso3":"USA","materials":["aluminium"],"kind":"processing","kind_as_printed":"primary aluminum smelter","status":"planned","status_as_printed":"progress toward constructing a primary aluminum smelter in Inola, Oklahoma","status_statement":{"publisher":"U.S. Department of Energy","quote":"to celebrate progress toward constructing a primary aluminum smelter in Inola, Oklahoma","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-awardee-build-first-american-aluminum-smelter-1980","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-10","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of Energy, Office of Clean Energy Demonstrations","instrument":"grant","stage_as_printed":"awarded","statement":{"publisher":"U.S. Department of Energy","quote":"In 2025, DOE’s Office of Clean Energy Demonstrations (OCED) awarded $500 million to advance construction of the first new primary aluminum smelter in the United States since 1980.","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-awardee-build-first-american-aluminum-smelter-1980","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-10","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the award itself to 2025; no capital cost is printed (the page says only 'multi-billion-dollar')"}},"amount":500000000,"currency":"USD"}],"place":"Inola, Oklahoma"},{"id":"integracion-coroccohuayco","name":"Integración Coroccohuayco","company":"Compañía Minera Antapaccay S.A.","country_iso3":"PER","materials":["copper"],"kind":"mine","kind_as_printed":"Integración Coroccohuayco","status":"planned","status_as_printed":"FACTIBILIDAD; execution listed for 2027 / 2028","status_statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"2027 / 2028 2029 Integración Coroccohuayco Compañía Minera Antapaccay S.A. Cusco Cobre FACTIBILIDAD 1,800","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the book prints 'Primera edición - Lima - mayo de 2026'; the ministry's page lists it under 17 June 2026"}},"backing":[],"place":"Cusco","capex":{"amount":1800000000,"currency":"USD","covers":"Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate)","statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"destacan Integración Coroccohuayco (US$ 1,800 millones), en Cusco","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"japan-new-metals-akita-tungsten","name":"Japan New Metals Akita plant, tungsten recycling expansion","company":"日本新金属株式会社 (Mitsubishi Materials group)","country_iso3":"JPN","materials":["tungsten"],"kind":"recycling","kind_as_printed":"タングステンリサイクル能力増強投資 (秋田工場の湿式精錬設備をはじめとする各種設備を増強)","status":"planned","status_as_printed":"増強することを決定しました; 設備導入は2026年度から順次開始し、2029年4月の操業開始を予定","status_statement":{"publisher":"三菱マテリアル株式会社","quote":"設備導入は2026年度から順次開始し、2029年4月の操業開始を予定しています。","provenance":{"source_id":"三菱マテリアル株式会社","source_url":"https://news.mmc.co.jp/corporate/ja/newsroom/press/news20260909.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Ministry of Economy, Trade and Industry (経済産業省)","instrument":"grant","stage_as_printed":"供給確保計画として、経済産業省より認定を受けた取り組み","statement":{"publisher":"三菱マテリアル株式会社","quote":"本投資は、経済安全保障推進法に基づき、重要鉱物の安定供給確保に資する供給確保計画として、経済産業省より認定を受けた取り組みです。","provenance":{"source_id":"三菱マテリアル株式会社","source_url":"https://news.mmc.co.jp/corporate/ja/newsroom/press/news20260909.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Akita, Akita Prefecture","capex":{"amount":8000000000,"currency":"JPY","covers":"expansion of the hydrometallurgical refining equipment and other equipment at the Akita plant, raising APT capacity to 2,400 tonnes a year (WO3 basis)","statement":{"publisher":"三菱マテリアル株式会社","quote":"投資額は約80億円を見込んでいます。","provenance":{"source_id":"三菱マテリアル株式会社","source_url":"https://news.mmc.co.jp/corporate/ja/newsroom/press/news20260909.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"k-hill","name":"K.Hill Battery Manganese Project","company":"Giyani Metals Corp.","country_iso3":"BWA","materials":["manganese"],"kind":"mine_and_processing","kind_as_printed":"K.Hill Project (battery-grade high-purity manganese sulphate monohydrate from its own deposits)","status":"planned","status_as_printed":"advance pre-Final Investment Decision (\"FID\") workstreams","status_statement":{"publisher":"Giyani Metals Corp.","quote":"to secure the capital required to sustain operations and advance pre - Final Investment Decision (\" FID\") workstreams","provenance":{"source_id":"Giyani Metals Corp.","source_url":"https://giyanimetals.com/wp-content/uploads/2026/09/Giyani-MDA-Q2-2026-Final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the spacing in the quote is that of the saved PDF text"}},"backing":[{"body":"Industrial Development Corporation of South Africa Limited (IDC)","instrument":"loan","stage_as_printed":"convertible loan; has been fully drawn","statement":{"publisher":"Giyani Metals Corp.","quote":"additional facility amount of ZAR29.9 million, increasing the maximum combined IDC facilities to ZAR329.9 million","provenance":{"source_id":"Giyani Metals Corp.","source_url":"https://giyanimetals.com/wp-content/uploads/2026/09/Giyani-MDA-Q2-2026-Final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the source says the proceeds paid for the demonstration plant in Johannesburg and for study work, not for building the mine"}},"amount":329900000,"currency":"ZAR"}],"place":"Kanye Basin, south-eastern Botswana","capex":{"amount":535000000,"currency":"USD","covers":"total initial capital expenditure including contingency (definitive feasibility study, 2026); initial capital excluding contingency is printed as USD M 480","statement":{"publisher":"Giyani Metals Corp.","quote":"Total initial capital expenditure USD M 535","provenance":{"source_id":"Giyani Metals Corp.","source_url":"https://giyanimetals.com/wp-content/uploads/2026/09/Giyani-MDA-Q2-2026-Final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"kabanga-nickel","name":"Kabanga Nickel Project","company":"Lifezone Metals Limited","country_iso3":"TZA","materials":["nickel","copper","cobalt"],"kind":"mine","kind_as_printed":"mechanized underground mine, mill, concentrator","status":"planned","status_as_printed":"on track for a Final Investment Decision (FID) in 2026","status_statement":{"publisher":"Lifezone Metals Limited","quote":"which remains on track for a Final Investment Decision (FID) in 2026","provenance":{"source_id":"Lifezone Metals Limited","source_url":"https://ir.lifezonemetals.com/news/press-releases/news-details/2025/Lifezone-Metals-Advances-Kabanga-Nickel-Project-Toward-2026-Final-Investment-Decision/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. International Development Finance Corporation (DFC)","instrument":"letter_of_interest","stage_as_printed":"Letter of Interest","statement":{"publisher":"Lifezone Metals Limited","quote":"has received a Letter of Interest from the U.S. International Development Finance Corporation (DFC) that expressed DFC’s interest in considering the Project for loans","provenance":{"source_id":"Lifezone Metals Limited","source_url":"https://ir.lifezonemetals.com/news/press-releases/news-details/2024/Lifezone-Metals-Announces-Initiation-of-Project-Financing-Process-for-the-Kabanga-Nickel-Project-in-Tanzania/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-09-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"northwestern Tanzania","capex":{"amount":942000000,"currency":"USD","covers":"Pre-production capital costs, including 9.7% contingency (Feasibility Study, initial development phase)","statement":{"publisher":"Lifezone Metals Limited","quote":"Pre-production capital costs of $942 million, including 9.7% contingency.","provenance":{"source_id":"Lifezone Metals Limited","source_url":"https://ir.lifezonemetals.com/news/press-releases/news-details/2025/Lifezone-Metals-Files-the-Feasibility-Study-Technical-Report-Summary-for-the-Kabanga-Nickel-Project-in-Tanzania/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"kathleen-valley-expansion","name":"Kathleen Valley Expansion","company":"Liontown Limited","country_iso3":"AUS","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"expansion of the Kathleen Valley lithium operation (ore processing capacity from approximately 2.8 Mtpa to 4.2 Mtpa)","status":"construction","status_as_printed":"FID approved; construction work on site has commenced as part of the early works","status_statement":{"publisher":"Liontown Limited","quote":"Construction work on site has commenced as part of the early works, with completion of the Expansion expected by mid-FY29.","provenance":{"source_id":"Liontown Limited","source_url":"https://www.liontown.com/wp-content/uploads/2026/09/61346497.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the existing Kathleen Valley operation is already producing; this entry is only the expansion approved on 30 September 2026"}},"backing":[],"place":"Kathleen Valley, Western Australia","capex":{"amount":389000000,"currency":"AUD","covers":"total approved capital for the Expansion, inclusive of $60-70 million of previously announced pre-FID expenditure in FY27 and contingency; stated in real terms (A$, as at 30 September 2026)","statement":{"publisher":"Liontown Limited","quote":"Total approved capital related to the Expansion is $389 million","provenance":{"source_id":"Liontown Limited","source_url":"https://www.liontown.com/wp-content/uploads/2026/09/61346497.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"kghm-retkow-grodziszcze","name":"Development and extraction of the Retków-Grodziszcze deposit","company":"KGHM Polska Miedź S.A.","country_iso3":"POL","materials":["copper"],"kind":"mine","kind_as_printed":"extraction project (Commission annex); construction of the Retków shaft with ancillary infrastructure (company)","status":"construction","status_as_printed":"one of three mine shafts whose construction began in 2025","status_statement":{"publisher":"KGHM Polska Miedź S.A.","quote":"involves the construction of the Retków shaft, together with the necessary ancillary infrastructure. It is one of three mine shafts whose construction began in 2025.","provenance":{"source_id":"KGHM Polska Miedź S.A.","source_url":"https://media.kghm.com/en/news-and-press-releases/two-investments-by-kghm-polska-miedz-s-a-are-european-union-s-strategic-projects","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2026) 8051, annex item 12)","statement":{"publisher":"European Commission","quote":"is an ongoing extraction project in Poland. The project promoted by KGHM Polska Miedź S.A. aims to contribute to the supply of copper.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/efabd887-9c12-4a3d-910e-8433c0f63a81_en?filename=C_2026_8051_F1_ANNEX_EN_V3_P1_5091583.PDF","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Retków–Grodziszcze deposit","capex":{"amount":9500000000,"currency":"PLN","covers":"TWO projects together, printed as 'over PLN 9.5 billion': this deposit and the transformation of the Legnica Copper Smelter and Refinery into a recycling plant; no figure for the deposit alone is printed","statement":{"publisher":"KGHM Polska Miedź S.A.","quote":"These two projects, totalling over PLN 9.5 billion, will strengthen Europe’s copper mining and recycling capacity","provenance":{"source_id":"KGHM Polska Miedź S.A.","source_url":"https://media.kghm.com/en/news-and-press-releases/two-investments-by-kghm-polska-miedz-s-a-are-european-union-s-strategic-projects","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"kings-mountain-lithium","name":"Kings Mountain Mine","company":"Albemarle Corporation","country_iso3":"USA","materials":["lithium"],"kind":"mine","kind_as_printed":"planned reopening of its lithium mine in Kings Mountain, North Carolina","status":"planned","status_as_printed":"35% into engineering; still presenting and waiting on permits to continue construction","status_statement":{"publisher":"Albemarle Corporation","quote":"We are 35% into engineering and we are still presenting and waiting on permits to continue construction.","provenance":{"source_id":"Albemarle Corporation","source_url":"https://www.albemarle.com/sites/default/files/2026-08/2026_CAP_First_Half_Year_in_Review_FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the review of the Community Advisory Panel prints only 'July 2026'; the sentence is the company's answer to a panel question"}},"backing":[{"body":"U.S. Department of Defense (Defense Production Act authorities)","instrument":"grant","stage_as_printed":"approved","statement":{"publisher":"Albemarle Corporation","quote":"the U.S. Department of Defense has approved a $90 million grant to help support the expansion of domestic mining and the production of lithium","provenance":{"source_id":"Albemarle Corporation","source_url":"https://www.albemarle.com/global/en/news/albemarle-receives-90-million-critical-materials-award-department-defense-boost-us-lithium","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-09-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"a 2023 statement; whether the grant has been paid out since was not read"}},"amount":90000000,"currency":"USD"}],"place":"Kings Mountain, North Carolina"},{"id":"kolmisoppi","name":"Kolmisoppi","company":"Terrafame Ltd.","country_iso3":"FIN","materials":["nickel","cobalt"],"kind":"mine","kind_as_printed":"extraction project (Commission annex); yet unexploited ore deposit (company)","status":"planned","status_as_printed":"aims to begin mining operations in the Kolmisoppi area in 2028 (permit decision estimated for 2027)","status_statement":{"publisher":"Terrafame","quote":"The company aims to begin mining operations in the Kolmisoppi area in 2028.","provenance":{"source_id":"Terrafame","source_url":"https://www.terrafame.com/kolmisoppi-project.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page's timeline prints 'Updated 4 May 2026'"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 20)","statement":{"publisher":"European Commission","quote":"Kolmisoppi is an ongoing extraction project in Finland. The project promoted by Terrafame Ltd. aims to contribute to the supply of nickel (battery grade) and cobalt.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Sotkamo"},{"id":"las-cruces-pmr","name":"Polymetallic primary sulphide project (PMR, Las Cruces)","company":"Cobre Las Cruces S.A.U.","country_iso3":"ESP","materials":["copper","zinc"],"kind":"mine_and_processing","kind_as_printed":"integrated extraction and processing project (Commission annex); underground mine and polymetallic refinery (company)","status":"planned","status_as_printed":"está desarrollando actualmente los trabajos previos para la implementación del nuevo proyecto","status_statement":{"publisher":"Cobre Las Cruces","quote":"Las Cruces está desarrollando actualmente los trabajos previos para la implementación del nuevo proyecto de refinería polimetalúrgica PMR (Poly Metallurgical Refinery).","provenance":{"source_id":"Cobre Las Cruces","source_url":"https://www.cobrelascruces.com/index.php/mina/el-futuro-proyecto-pmr/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"page is undated; date is the day it was fetched"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 32)","statement":{"publisher":"European Commission","quote":"Polymetallic primary sulphide project is an ongoing integrated extraction and processing project in Spain. The project promoted by Cobre las Cruces S.A.U.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Las Cruces, Andalusia","capex":{"amount":800000000,"currency":"EUR","covers":"estimated investment of the project, printed as 'more than'; an additional investment in renewable self-supply of energy is not included","statement":{"publisher":"Cobre Las Cruces","quote":"con una inversión estimada superior a los 800 millones de euros, a la que se sumará una inversión adicional para la implementación de instalaciones de autoabastecimiento energético mediante energías renovables","provenance":{"source_id":"Cobre Las Cruces","source_url":"https://www.cobrelascruces.com/index.php/mina/el-futuro-proyecto-pmr/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"page is undated; date is the day it was fetched"}}}},{"id":"lkab-reemap","name":"ReeMAP Project: Malmberget, Per Geijer and Luleå Industrial Park","company":"Luossavaara-Kiirunavaara AB (LKAB, state-owned)","country_iso3":"SWE","materials":["rare-earths","phosphate-rock"],"kind":"mine_and_processing","kind_as_printed":"integrated project consisting of two extraction and one processing components (Commission annex); planned full-scale industrial park (company)","status":"planned","status_as_printed":"planned full-scale industrial park in Luleå; future investment decisions depend on permits; the demonstration plant is in hot commissioning","status_statement":{"publisher":"LKAB","quote":"In May 2026, the Land and Environment Court granted an environmental permit for LKAB’s planned full-scale industrial park in Luleå.","provenance":{"source_id":"LKAB","source_url":"https://lkab.com/en/press/lkab-takes-the-next-step-in-its-critical-minerals-initiative/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"no cost of the full-scale project is printed; the demonstration plant (a decision of October 2024) is built and is not the planned project"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 38)","statement":{"publisher":"European Commission","quote":"ReeMAP Project: Malmberget, Per Geijer and Lulea Industrial Park is an ongoing integrated project consisting of two extraction (Malmberget and Per Geijer) and one processing components","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Gällivare (Malmberget), Kiruna (Per Geijer) and Luleå"},{"id":"longonjo","name":"Longonjo Rare Earth Mine","company":"Pensana Plc","country_iso3":"AGO","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"Longonjo Rare Earth Mine (mixed rare earth carbonate, MREC)","status":"construction","status_as_printed":"Main construction activities continue at pace with commissioning scheduled for 2027","status_statement":{"publisher":"Pensana Plc","quote":"Main construction activities at the Longonjo Rare Earth Mine continue at pace with commissioning scheduled for 2027.","provenance":{"source_id":"Pensana Plc","source_url":"https://pensana.co.uk/wp-content/uploads/2026/03/Pensana-Interim-results-for-the-six-months-ended-31-December-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Fundo Soberano de Angola (FSDEA), the Angolan sovereign wealth fund","instrument":"equity","stage_as_printed":"initial deployment of US$25 million equity invested by FSDEA","statement":{"publisher":"Pensana Plc","quote":"which resulted in the initial deployment of US$25 million equity invested by FSDEA","provenance":{"source_id":"Pensana Plc","source_url":"https://pensana.co.uk/wp-content/uploads/2026/03/Pensana-Interim-results-for-the-six-months-ended-31-December-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":25000000,"currency":"USD"},{"body":"Export-Import Bank of the United States (EXIM)","instrument":"loan_guarantee","stage_as_printed":"proposed; advanced engagement with U.S.-EXIM","statement":{"publisher":"Pensana Plc","quote":"Alongside the proposed US$160 million Absa debt funding package (U.S.-EXIM guaranteed) the strategic investment would provide for the construction of the Longonjo mine","provenance":{"source_id":"Pensana Plc","source_url":"https://pensana.co.uk/wp-content/uploads/2026/03/Pensana-Interim-results-for-the-six-months-ended-31-December-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the amount is the proposed debt package of Absa (a private bank) that the guarantee would cover; the company reports engagement, not an approval by EXIM"}},"amount":160000000,"currency":"USD"},{"body":"U.S. International Development Finance Corporation (DFC)","instrument":"grant","stage_as_printed":"secured a US$3.4 million technical assistance grant","statement":{"publisher":"Pensana Plc","quote":"Pensana has also secured a US$3.4 million technical assistance grant from the DFC which will support feasibility studies for increased processing capacity at Longonjo","provenance":{"source_id":"Pensana Plc","source_url":"https://pensana.co.uk/wp-content/uploads/2025/10/Pensana-integrated-annual-report-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"for feasibility studies and testing, not for construction; DFC's own page calls it Project Development funding and prints no amount"}},"amount":3400000,"currency":"USD"}],"place":"Longonjo, Angola","capex":{"amount":217000000,"currency":"USD","covers":"overall capital cost envelope including contingency, Phase 1 (20,000 tonnes a year of MREC)","statement":{"publisher":"Pensana Plc","quote":"have confirmed that the overall capital cost envelope of US$217 million (including contingency) is intact","provenance":{"source_id":"Pensana Plc","source_url":"https://pensana.co.uk/wp-content/uploads/2025/10/Pensana-integrated-annual-report-2025.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"annual report for the year ended 30 June 2025; 14 October 2025 is the date printed on its statements"}}},"links":[{"publisher":"U.S. International Development Finance Corporation","url":"https://www.dfc.gov/investment-story/expanding-rare-earth-processing-angola-production-us"}]},{"id":"los-azules","name":"Los Azules","company":"Andes Corporación Minera SA (ACM SA)","country_iso3":"ARG","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"Proyecto Los Azules (mine, plant and infrastructure for copper cathodes)","status":"planned","status_as_printed":"completar el desarrollo (factibilidad, permisos) y la construcción de mina, planta e infraestructura asociada","status_statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"completar el desarrollo (factibilidad, permisos) y la construcción de mina, planta e infraestructura asociada para extraer y procesar cátodos de cobre","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/332807/20251014","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)","instrument":"other","stage_as_printed":"Apruébase la solicitud de adhesión; adhesion date 25 September 2025","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/332807/20251014","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Resolución 1553/2025 of 13 October 2025; adhesion to a regime of tax, customs and foreign-exchange incentives, not a payment of public money"}}}],"place":"Calingasta department, San Juan province","capex":{"amount":2672171207,"currency":"USD","covers":"total investment declared by the applicant in its RIGI investment plan (of which USD 2.353.624.141,07 in computable assets)","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"inversión total de dos mil seiscientos setenta y dos millones ciento setenta y un mil doscientos siete dólares estadounidenses (USD 2.672.171.207)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/332807/20251014","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"lumwana-super-pit","name":"Lumwana Super Pit Expansion Project","company":"Barrick Mining Corporation","country_iso3":"ZMB","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"Super Pit Expansion Project at the Lumwana mine (mill expansion)","status":"construction","status_as_printed":"The mill expansion is progressing well; on budget and on schedule for first copper at the end of Q1 2028","status_statement":{"publisher":"Barrick Mining Corporation","quote":"The mill expansion is progressing well and is expected to double copper production. The project remains on budget and on schedule for first copper at the end of Q1","provenance":{"source_id":"Barrick Mining Corporation","source_url":"https://www.barrick.com/English/news/news-details/2026/q3-2026-results/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the saved text continues \"Q1 20289\" (the year 2028 followed by footnote mark 9), so the quote stops at \"Q1\"; Lumwana is an operating mine and the project is its expansion"}},"backing":[],"place":"Lumwana mine, Zambia","capex":{"amount":2000000000,"currency":"USD","covers":"the Super Pit Expansion Project as a whole, as the company describes it (\"$2 billion Super Pit Expansion Project\"); no breakdown on the page","statement":{"publisher":"Barrick Mining Corporation","quote":"Construction of the $2 billion Super Pit Expansion Project at Barrick Mining Corporation’s (NYSE:B)(TSX:ABX) Lumwana mine is well underway","provenance":{"source_id":"Barrick Mining Corporation","source_url":"https://www.barrick.com/English/news/news-details/2025/lumwana-expansion-in-full-swing-as-barrick-builds-tier-one-copper-mine/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07-10","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"mactung","name":"Mactung","company":"Fireweed Metals Corp.","country_iso3":"CAN","materials":["tungsten"],"kind":"mine","kind_as_printed":"Mactung tungsten project","status":"planned","status_as_printed":"commencing a Feasibility Study","status_statement":{"publisher":"Fireweed Metals Corp.","quote":"Fireweed anticipates that the Feasibility Study will run throughout 2026 and is targeting a 2027 release.","provenance":{"source_id":"Fireweed Metals Corp.","source_url":"https://fireweedmetals.com/mactung-project-update/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of Defense (Defense Production Act Title III)","instrument":"grant","stage_as_printed":"awarded","statement":{"publisher":"Fireweed Metals Corp.","quote":"Fireweed has been awarded US$15.8M (~C$22.5 M) from the U.S. Department of Defense under Title III of the Defense Production Act of 1950","provenance":{"source_id":"Fireweed Metals Corp.","source_url":"https://fireweedmetals.com/fireweed-metals-corp-awarded-up-to-c35-4-m-in-joint-us-canadian-government-funding-to-advance-mactung-and-essential-infrastructure-to-unlock-the-critical-minerals-district-at-macmillan-pass-yukon-t/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":15800000,"currency":"USD"}],"place":"Macmillan Pass, Yukon Territory"},{"id":"marathon-copper-palladium","name":"Marathon Project","company":"Generation Mining Limited","country_iso3":"CAN","materials":["copper","palladium"],"kind":"mine","kind_as_printed":"Marathon Project, a fully permitted, shovel-ready critical minerals project","status":"planned","status_as_printed":"progresses the Project toward a final investment decision and construction","status_statement":{"publisher":"Canada Growth Fund","quote":"CGF’s support progresses the Project toward a final investment decision and construction.","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/canada-growth-fund-commits-to-invest-140-million-in-generation-mining-to-mobilize-private-capital-for-ontarios-marathon-critical-minerals-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Canada Growth Fund","instrument":"equity","stage_as_printed":"commitment to invest (common shares and a convertible note)","statement":{"publisher":"Canada Growth Fund","quote":"announced today its commitment to invest ~ $140 million in Generation Mining Limited","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/canada-growth-fund-commits-to-invest-140-million-in-generation-mining-to-mobilize-private-capital-for-ontarios-marathon-critical-minerals-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page prints '$' without a currency code (CAD inferred from the publisher); the sum is made of about $90 million in common shares and a $50 million convertible note. The company's own pages were not read, so no capital cost is given"}},"amount":140000000,"currency":"CAD"}],"place":"Marathon, Northwestern Ontario"},{"id":"matawinie-graphite","name":"Matawinie Mine","company":"Nouveau Monde Graphite Inc.","country_iso3":"CAN","materials":["graphite"],"kind":"mine","kind_as_printed":"Matawinie graphite mine (Phase-2 Matawinie mine)","status":"construction","status_as_printed":"Construction at the Matawinie Mine has been advancing as planned","status_statement":{"publisher":"Nouveau Monde Graphite Inc.","quote":"Construction at the Matawinie Mine has been advancing as planned and remains within the overall budget","provenance":{"source_id":"Nouveau Monde Graphite Inc.","source_url":"https://nmg.com/q3-2026/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Export Development Canada and Canada Infrastructure Bank","instrument":"loan","stage_as_printed":"will further support the project through a financing package","statement":{"publisher":"Prime Minister of Canada","quote":"The government will further support the project through a $459 million financing package from Export Development Canada and the Canada Infrastructure Bank","provenance":{"source_id":"Prime Minister of Canada","source_url":"https://www.pm.gc.ca/en/news/news-releases/2026/05/19/prime-minister-carney-breaks-ground-nouveau-monde-graphites-matawinie","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-19","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page prints '$' without a currency code (CAD inferred from the publisher). The Canada Growth Fund's release of 2026-04-09 calls the same facility senior debt financing by the two lenders"}},"amount":459000000,"currency":"CAD"},{"body":"Canada Growth Fund","instrument":"equity","stage_as_printed":"has entered into a definitive agreement (private placement)","statement":{"publisher":"Canada Growth Fund","quote":"it has entered into a definitive agreement with respect to a ~US$82 million (~C$113 million) private placement","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/canada-growth-fund-announces-a-us-82-million-investment-to-support-the-construction-of-nouveau-monde-graphite-flagship-matawinie-mine/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":82000000,"currency":"USD"},{"body":"Investissement Québec","instrument":"equity","stage_as_printed":"committed (private placement alongside the Canada Growth Fund and Eni)","statement":{"publisher":"Canada Growth Fund","quote":"led by CGF (~US$82 million), Eni (~US$70 million), and IQ (~US$61 million)","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/canada-growth-fund-announces-a-us-82-million-investment-to-support-the-construction-of-nouveau-monde-graphite-flagship-matawinie-mine/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":61000000,"currency":"USD"}],"place":"Saint-Michel-des-Saints, Quebec","links":[{"publisher":"Canada Infrastructure Bank","url":"https://cib-bic.ca/en/medias/articles/cib-and-edc-extend-financing-package-to-nouveau-monde-graphite/"}]},{"id":"michiquillay","name":"Michiquillay","company":"Southern Perú Copper Corporation","country_iso3":"PER","materials":["copper"],"kind":"mine","kind_as_printed":"Michiquillay","status":"planned","status_as_printed":"etapa Conceptual","status_statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"Entre los proyectos más destacados en esta fase ﬁguran Michiquillay (US$ 2,500 millones) y La Granja (US$ 2,400 millones)","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the book prints 'Primera edición - Lima - mayo de 2026'; the ministry's page lists it under 17 June 2026"}},"backing":[],"place":"Cajamarca","capex":{"amount":2500000000,"currency":"USD","covers":"Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate)","statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"Chancas (US$ 2,600 millones), Michiquillay (US$ 2,500 millones)","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"mingomba","name":"Mingomba copper mine","company":"KoBold Metals (with ZCCM-IH)","country_iso3":"ZMB","materials":["copper"],"kind":"mine","kind_as_printed":"planned shaft construction at the Mingomba copper mine","status":"construction","status_as_printed":"officially broke ground on the planned shaft construction; the formal start of construction","status_statement":{"publisher":"KoBold Metals","quote":"On 29 April, KoBold Metals and ZCCM-IH officially broke ground on the planned shaft construction at the Mingomba copper mine in Chililabombwe, Zambia.","provenance":{"source_id":"KoBold Metals","source_url":"https://koboldmetals.com/2026/05/21/breaking-ground-at-mingomba-a-new-chapter-for-the-copperbelt/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page is dated May 21, 2026 and dates the event itself to 29 April; first output is expected in the early 2030s"}},"backing":[],"place":"Chililabombwe, Zambia","capex":{"amount":2000000000,"currency":"USD","covers":"the investment as a whole, printed as an estimate of 'more than $2 billion' (a lower bound, not a study figure)","statement":{"publisher":"KoBold Metals","quote":"The investment is estimated at more than $2 billion, with targeted production of around 300,000 metric tonnes of copper annually and first output expected in the early 2030s.","provenance":{"source_id":"KoBold Metals","source_url":"https://koboldmetals.com/2026/05/21/breaking-ground-at-mingomba-a-new-chapter-for-the-copperbelt/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"nemaska-becancour","name":"Nemaska Lithium Bécancour lithium hydroxide plant","company":"Nemaska Lithium (Rio Tinto 53.9%, Government of Québec 46.1%)","country_iso3":"CAN","materials":["lithium"],"kind":"processing","kind_as_printed":"lithium hydroxide plant in Bécancour, Québec","status":"construction","status_as_printed":"construction is now more than 70% advanced; the partners have agreed to slow the pace of construction during 2026","status_statement":{"publisher":"Rio Tinto","quote":"Engineering for the Bécancour facility has been completed, and construction is now more than 70% advanced.","provenance":{"source_id":"Rio Tinto","source_url":"https://www.riotinto.com/en/news/releases/2026/update-on-the-nemaska-lithium-bcancour-project","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the same page says Rio Tinto and the Nemaska Lithium Board have agreed to slow the pace of construction during 2026 and that construction is expected to ramp up again afterwards"}},"backing":[{"body":"Government of Québec (through Investissement Québec)","instrument":"equity","stage_as_printed":"will invest up to US$200 million in Nemaska Lithium through equity subscriptions","statement":{"publisher":"Rio Tinto","quote":"The Government of Quebec will invest up to US$200 million in Nemaska Lithium through equity subscriptions","provenance":{"source_id":"Rio Tinto","source_url":"https://www.riotinto.com/en/news/releases/2026/rio-tinto-assumes-majority-interest-and-management-responsibilities-at-nemaska-lithium","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"equity in the company Nemaska Lithium, which also owns the Whabouchi mine; the amount is not for the plant alone. No capital cost of the plant was read"}},"amount":200000000,"currency":"USD"}],"place":"Bécancour, Quebec"},{"id":"nolans-rare-earths","name":"Nolans Rare Earths Project","company":"Arafura Rare Earths Limited","country_iso3":"AUS","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"rare earths mine and processing facilities (including beneficiation, extraction, and separation plants)","status":"planned","status_as_printed":"Final Investment Decision announced; will now move to commence construction","status_statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"The government commitment and Final Investment Decision means Arafura will now move to commence construction on the Nolans project","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/strategic-reserve-supporting-arafura-final-investment-decision/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Northern Australia Infrastructure Facility (NAIF)","instrument":"loan","stage_as_printed":"Investment Decision","statement":{"publisher":"Northern Australia Infrastructure Facility","quote":"In January 2024, NAIF made an Investment Decision to provide up to $200 million in project finance to Arafura Rare Earths Ltd","provenance":{"source_id":"Northern Australia Infrastructure Facility","source_url":"https://www.naif.gov.au/our-projects/arafura-nolans-bore-rare-earths-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-01","licence":"Commonwealth copyright; reproduction in unaltered form for personal or non-commercial use, otherwise only uses permitted under the Copyright Act 1968 (NAIF legal notices). A fact and a quotation of at most 30 words, attributed and linked","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"project page is undated; it prints the month of the Investment Decision and the project status 'Investment Decision'"}},"amount":200000000,"currency":"AUD"},{"body":"Australian Government","instrument":"equity","stage_as_printed":"Australia is announcing today a USD$100 million equity investment","statement":{"publisher":"Export Finance Australia (Prime Minister's media release)","quote":"The second project is the Arafura Nolans project in the Northern Territory. Australia is announcing today a USD$100 million equity investment in the project.","provenance":{"source_id":"Export Finance Australia (Prime Minister's media release)","source_url":"https://www.exportfinance.gov.au/newsroom/historic-critical-minerals-framework-signed-by-president-trump-and-prime-minister-albanese/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":100000000,"currency":"USD"}],"place":"135 kilometres north of Alice Springs, Northern Territory","capex":{"amount":1226000000,"currency":"USD","covers":"pre-production capital costs including escalation and contingency, as printed on the company's project-update page; that page is undated and refers to an ASX presentation of 23 July 2024, so the figure predates the May 2026 Final Investment Decision","statement":{"publisher":"Arafura Rare Earths Limited","quote":"Pre-production capital costs (including escalation and contingency) of US$1,226 million","provenance":{"source_id":"Arafura Rare Earths Limited","source_url":"https://www.arultd.com/projects/nolans/project-update/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-07-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"web page is undated; its footnote reads 'Refer to ASX presentation dated 23 July 2024'. Arafura's 2026 ASX announcements are loaded by script and could not be read, so a newer estimate may exist"}}}},{"id":"northern-katpar-tungsten","name":"Northern Katpar and Upper Kairakty tungsten project","company":"Tau-Ken Samruk and Cove Capital","country_iso3":"KAZ","materials":["tungsten"],"kind":"mine_and_processing","kind_as_printed":"joint development of the Northern Katpar and Upper Kairakty tungsten deposits; production facilities for ammonium paratungstate","status":"planned","status_as_printed":"Preparatory work has begun on developing the final feasibility study","status_statement":{"publisher":"Samruk-Kazyna JSC","quote":"Preparatory work has begun on developing the final feasibility study for the Northern Katpar project","provenance":{"source_id":"Samruk-Kazyna JSC","source_url":"https://sk.kz/press-center/news/78602/?lang=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Tau-Ken Samruk, national mining company of Kazakhstan (Samruk-Kazyna group)","instrument":"equity","stage_as_printed":"signed an agreement on the joint development","statement":{"publisher":"Samruk-Kazyna JSC","quote":"The national mining company Tau-Ken Samruk and the American investment company Cove Capital have signed an agreement on the joint development of the Northern Katpar and Upper Kairakty tungsten deposits.","provenance":{"source_id":"Samruk-Kazyna JSC","source_url":"https://sk.kz/press-center/news/78602/?lang=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the state company is a partner in the joint venture; the page prints no amount for its share"}}}],"place":"Kazakhstan","capex":{"amount":1100000000,"currency":"USD","covers":"'volume of investments' for the joint development of both deposits, as announced; not a study estimate","statement":{"publisher":"Samruk-Kazyna JSC","quote":"The volume of investments is about USD1.1 billion.","provenance":{"source_id":"Samruk-Kazyna JSC","source_url":"https://sk.kz/press-center/news/78602/?lang=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},"links":[{"publisher":"Tau-Ken Samruk","url":"https://tks.kz/en/kazakhstan-strengthens-its-position-in-the-global-critical-minerals-industry/"}]},{"id":"nussir-copper","name":"Nussir","company":"Blue Moon Metals Inc. (Nussir ASA)","country_iso3":"NOR","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"extraction project (Commission annex); underground mine and processing facility (company)","status":"construction","status_as_printed":"board of directors has approved a final investment decision on the construction","status_statement":{"publisher":"Blue Moon Metals Inc.","quote":"its board of directors has approved a final investment decision on the construction for its Nussir project (“Project”), located in northern Norway","provenance":{"source_id":"Blue Moon Metals Inc.","source_url":"https://bluemoonmetals.com/blue-moon-metals-confirms-final-investment-decision-to-construct-nussir-project-mine-intention-to-construct-the-springer-tungsten-mine-and-concurrent-c150-million-bought-deal-equity-offerings/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project in a third country (Commission Decision C(2025) 3491, annex item 8)","statement":{"publisher":"European Commission","quote":"Nussir is an ongoing extraction project in Norway. The project promoted by Nussir ASA aims to contribute to the supply of copper.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/60c576a5-435e-43e6-83de-c81f3652259b_en?filename=C_2025_3491_1_EN_annexe_acte_autonome_part1_v3.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"northern Norway","capex":{"amount":184000000,"currency":"USD","covers":"initial capital expenditures of the April 2026 feasibility study; the study table prints the row 'Initial Capital Costs' in US$m","statement":{"publisher":"Blue Moon Metals Inc.","quote":"Initial capital expenditures of $184 million.","provenance":{"source_id":"Blue Moon Metals Inc.","source_url":"https://bluemoonmetals.com/blue-moon-announces-results-of-nussir-project-feasibility-study/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-04-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"pampa-de-pongo","name":"Pampa de Pongo","company":"Jinzhao Mining Perú S.A.","country_iso3":"PER","materials":["iron-ore"],"kind":"mine","kind_as_printed":"Pampa de Pongo (iron ore, underground)","status":"planned","status_as_printed":"FACTIBILIDAD; execution listed for 2027 / 2035","status_statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"2027 / 2035 2029 Pampa de Pongo Jinzhao Mining Perú S.A. Arequipa Hierro FACTIBILIDAD 1,781","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the book prints 'Primera edición - Lima - mayo de 2026'; the ministry's page lists it under 17 June 2026"}},"backing":[],"place":"Arequipa","capex":{"amount":1781000000,"currency":"USD","covers":"Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate)","statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"Pampa de Pongo (US$ 1,781 millones), en Arequipa","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"phalaborwa","name":"Phalaborwa Rare Earths Project","company":"Rainbow Rare Earths Limited","country_iso3":"ZAF","materials":["rare-earths"],"kind":"processing","kind_as_printed":"supply of rare earths from phosphogypsum (two stacks of phosphogypsum)","status":"planned","status_as_printed":"Upon completion of the DFS, finalisation of the permitting will run in parallel with the project finance process","status_statement":{"publisher":"Rainbow Rare Earths Limited","quote":"Upon completion of the DFS, finalisation of the permitting will run in parallel with the project finance process","provenance":{"source_id":"Rainbow Rare Earths Limited","source_url":"https://www.rainbowrareearths.com/wp-content/uploads/2026/02/Indaba-Presentation-February-2026-FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the slides print \"Corporate Presentation – January 2026\"; the file name says Indaba, February 2026"}},"backing":[{"body":"U.S. International Development Finance Corporation (DFC), through TechMet Limited","instrument":"equity","stage_as_printed":"proposed investment","statement":{"publisher":"Rainbow Rare Earths Limited","quote":"Strategic project backed by US Government with DFC proposed investment of US$50 million and ca. 12% shareholding of TechMet","provenance":{"source_id":"Rainbow Rare Earths Limited","source_url":"https://www.rainbowrareearths.com/wp-content/uploads/2026/02/Indaba-Presentation-February-2026-FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"DFC's undated Public Information Summary says it \"proposes to invest up to $50 million in equity\" in TechMet Limited, which is raising equity for its whole portfolio; the money is not paid to the project directly"}},"amount":50000000,"currency":"USD"}],"place":"Phalaborwa, South Africa","capex":{"amount":326100000,"currency":"USD","covers":"updated up-front capital cost in the Interim Study of December 2024 (before the definitive feasibility study, which was still in preparation in 2026)","statement":{"publisher":"Rainbow Rare Earths Limited","quote":"The updated US$326.1 million capital cost, versus US$295.5 million in the PEA, is lower than the impact of ca 12% inflation since the PEA was published.","provenance":{"source_id":"Rainbow Rare Earths Limited","source_url":"https://www.rainbowrareearths.com/wp-content/uploads/2024/12/2024-12-16-Interim-Study-for-Phalaborwa-FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},"links":[{"publisher":"U.S. International Development Finance Corporation","url":"https://www.dfc.gov/sites/default/files/media/documents/9000116135.pdf"}]},{"id":"phoenix-wheeler-river","name":"Phoenix ISR uranium mine (Wheeler River)","company":"Denison Mines Corp.","country_iso3":"CAN","materials":["uranium"],"kind":"mine","kind_as_printed":"Phoenix In-Situ Recovery (ISR) uranium mine","status":"construction","status_as_printed":"Commencement of Site Preparation and Early Works for the Phoenix ISR Uranium Mine","status_statement":{"publisher":"Denison Mines Corp.","quote":"Highlighted by Commencement of Site Preparation and Early Works for the Phoenix ISR Uranium Mine","provenance":{"source_id":"Denison Mines Corp.","source_url":"https://denisonmines.com/news/denison-reports-financial-and-operational-results-122847/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the same page expects a full-scale rate of construction before the end of the second quarter of 2026"}},"backing":[],"place":"Wheeler River property, northern Saskatchewan","capex":{"amount":600000000,"currency":"CAD","covers":"initial capital costs after the final investment decision, Class 2 estimate of January 2026; the source says it includes $65 million in contingency funds and owners' reserves and leaves out spending before the decision","statement":{"publisher":"Denison Mines Corp.","quote":"Post-FID initial capital costs for Phoenix are now expected to be $600 million","provenance":{"source_id":"Denison Mines Corp.","source_url":"https://denisonmines.com/news/denison-reports-readiness-to-commence-construction-122840/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page says all amounts are stated in Canadian dollars unless otherwise noted"}}}},{"id":"psj-cobre-mendocino","name":"PSJ Cobre Mendocino","company":"Minera San Jorge SA","country_iso3":"ARG","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"PSJ Cobre Mendocino (open-pit mine and flotation concentrator, San Jorge deposit)","status":"planned","status_as_printed":"estimando el inicio de la etapa de construcción para el mes de junio del año 2027","status_statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"estimando el inicio de la etapa de construcción para el mes de junio del año 2027 y el inicio de operación para enero del año 2029","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)","instrument":"other","stage_as_printed":"Apruébase la solicitud de adhesión; adhesion date 13 May 2026","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Resolución 801/2026 of 26 May 2026; adhesion to a regime of tax, customs and foreign-exchange incentives, not a payment of public money"}}}],"place":"Uspallata, Las Heras department, Mendoza province","capex":{"amount":613430234,"currency":"USD","covers":"total investment in computable assets declared by the applicant in its RIGI investment plan","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"inversión total en activos computables de seiscientos trece millones cuatrocientos treinta mil doscientos treinta y cuatro dólares estadounidenses (USD 613.430.234)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"rhyolite-ridge","name":"Rhyolite Ridge Lithium-Boron Project","company":"Ioneer","country_iso3":"USA","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Rhyolite Ridge Lithium-Boron Project","status":"planned","status_as_printed":"the Board will be positioned to consider a Final Investment Decision (FID)","status_statement":{"publisher":"Ioneer","quote":"the Board will be positioned to consider a Final Investment Decision (FID) and move into early construction work","provenance":{"source_id":"Ioneer","source_url":"https://www.ioneer.com/wp-content/uploads/2026/08/Rhyolite-Ridge-Quarterly-Newsletter-August-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"newsletter prints only AUGUST 2026"}},"backing":[{"body":"U.S. Department of Energy, Office of Energy Dominance Financing (formerly Loan Programs Office)","instrument":"loan","stage_as_printed":"closed","statement":{"publisher":"Ioneer","quote":"In January, Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy","provenance":{"source_id":"Ioneer","source_url":"https://www.ioneer.com/wp-content/uploads/2025/12/Ioneer_Year_End_2025_Release_FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the event itself to 2025-01"}},"amount":996000000,"currency":"USD"},{"body":"U.S. Department of Energy, Office of Energy Dominance Financing (formerly Loan Programs Office)","instrument":"loan","stage_as_printed":"has conditions to first draw","statement":{"publisher":"Ioneer","quote":"$968 million in principal and $28 million in capitalised interest and has conditions to first draw","provenance":{"source_id":"Ioneer","source_url":"https://www.ioneer.com/wp-content/uploads/2025/12/Ioneer_Year_End_2025_Release_FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Nevada","capex":{"amount":1683000000,"currency":"USD","covers":"AACE Class 2 capital cost estimate (-10%, +15%) including a 10% contingency; table row: Initial capital expenditure (including contingencies) US$M 1,683.2","statement":{"publisher":"Ioneer","quote":"U.S.$1,683 million – AACE Class 2 capital cost estimate (-10%, +15%) including a 10% contingency","provenance":{"source_id":"Ioneer","source_url":"https://www.ioneer.com/investors/dfs-summary-2025-update/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"web page is undated; it says the metrics were originally published in Ioneer's announcement on October 29, 2025"}}}},{"id":"rincon","name":"Proyecto Rincón","company":"Rincón Mining PTY LTD. Sucursal Argentina","country_iso3":"ARG","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Proyecto Rincón (53.000 tpa battery-grade lithium carbonate, direct lithium extraction)","status":"construction","status_as_printed":"primera etapa, que se ejecutará entre el 9 de julio de 2024 y el 31 de diciembre de 2027","status_statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"para la primera etapa, que se ejecutará entre el 9 de julio de 2024 y el 31 de diciembre de 2027","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/326364/20250603","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"status read from the execution period of the first stage, which spans the date of the resolution; the resolution does not use the word construction for it"}},"backing":[{"body":"Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)","instrument":"other","stage_as_printed":"Apruébase la solicitud de adhesión … como Proyecto de Exportación Estratégica de Largo Plazo; adhesion date 19 May 2025","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/326364/20250603","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Resolución 735/2025 of 30 May 2025; adhesion to a regime of tax, customs and foreign-exchange incentives, not a payment of public money"}}}],"place":"Salar de Rincón, Los Andes department, Salta province","capex":{"amount":2744000000,"currency":"USD","covers":"total investment declared by the applicant from the entry into force of the RIGI (of which USD 2.299.000.000 in computable assets), in two stages (USD 1.653.000.000 and USD 646.000.000)","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"inversión total, a partir de la entrada en vigencia del RIGI, de dólares estadounidenses dos mil setecientos cuarenta y cuatro millones (USD 2.744.000.000)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/326364/20250603","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"rook-i","name":"Rook I Project","company":"NexGen Energy Ltd.","country_iso3":"CAN","materials":["uranium"],"kind":"mine_and_processing","kind_as_printed":"high-grade underground uranium mine and mill","status":"construction","status_as_printed":"groundbreaking of NexGen’s Rook I Project, a milestone marking the progress already underway","status_statement":{"publisher":"NexGen Energy Ltd.","quote":"On August 13th, we celebrated the groundbreaking of NexGen’s Rook I Project, a milestone marking the progress already underway.","provenance":{"source_id":"NexGen Energy Ltd.","source_url":"https://www.nexgenenergy.ca/events-webcasts/nexgen-groundbreaking-ceremony---august-13-2026","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-25","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page is dated August 25, 2026 and reports the ceremony of August 13, 2026; the company's undated project page says 'Construction has started. Shaft preparation is underway.'"}},"backing":[],"place":"southwestern Athabasca Basin, Saskatchewan","capex":{"amount":2200000000,"currency":"CAD","covers":"estimated pre-production capital costs as updated on 1 August 2024, before the construction licence and the start of construction; no newer figure was read","statement":{"publisher":"NexGen Energy Ltd.","quote":"Revised Capital Cost C$2.2 Billion /USD$1.58 Billion (C$/US$ 0.72)","provenance":{"source_id":"NexGen Energy Ltd.","source_url":"https://www.nexgenenergy.ca/news-releases/nexgen-provides-updated-economics-for-the-rook-i-project","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-01","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"sakatti","name":"Sakatti","company":"Anglo American","country_iso3":"FIN","materials":["copper","nickel","cobalt","platinum","palladium"],"kind":"mine_and_processing","kind_as_printed":"integrated extraction and processing project (Commission annex); polymetallic deposit (company)","status":"planned","status_as_printed":"Once it enters production in the early 2030s","status_statement":{"publisher":"Anglo American (Sakatti project site)","quote":"Once it enters production in the early 2030s, the Sakatti mine will double Finland's copper production and increase nickel production by 25 percent.","provenance":{"source_id":"Anglo American (Sakatti project site)","source_url":"https://finland.angloamerican.com/en/about-sakatti/strateginen-hanke","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"page is undated; date is the day it was fetched. The Commission names 'platinum group metals'; platinum and palladium are our reading of that"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 42)","statement":{"publisher":"European Commission","quote":"Sakatti is an ongoing integrated extraction and processing project in Finland. The project promoted by Anglo American Services (UK) Ltd.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"salares-altoandinos","name":"Salares Altoandinos","company":"Empresa Nacional de Minería (ENAMI), in partnership with Rio Tinto","country_iso3":"CHL","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Proyecto Salares Altoandinos","status":"planned","status_as_printed":"se incorpora el Proyecto Salares Altoandinos [a la cartera de inversión 2025-2034]","status_statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"se incorpora el Proyecto Salares Altoandinos, impulsado por ENAMI en asociación con Rio Tinto","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"presentation dated 'Agosto de 2026'; its 2026 section is marked as work in progress, not the official 2026-2035 portfolio figure"}},"backing":[],"place":"Atacama Region","capex":{"amount":3200000000,"currency":"USD","covers":"estimated investment of the project as entered in Cochilco's 2025-2034 mining investment portfolio","statement":{"publisher":"Comisión Chilena del Cobre (Cochilco)","quote":"impulsado por ENAMI en asociación con Rio Tinto, con una inversión estimada de US$3.200 millones","provenance":{"source_id":"Comisión Chilena del Cobre (Cochilco)","source_url":"https://www.cochilco.cl/web/download/1034/presentaciones-en-la-web/16807/cartera_inversion_minera_seminario_sonami_2026_v6-003.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08","licence":"Reproduction permitted with the source cited (notice printed in Cochilco's report DEEP 22/2025; it covers that report, the cited presentation carries no notice of its own)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},"links":[{"publisher":"Rio Tinto","url":"https://www.riotinto.com/en/news/releases/2025/rio-tinto-confirmed-as-preferred-partner-on-world-class-salares-altoandinos-lithium-project"}]},{"id":"santa-cruz-copper","name":"Santa Cruz Copper Project","company":"Ivanhoe Electric Inc.","country_iso3":"USA","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"Santa Cruz Copper Project (underground mine producing copper cathode)","status":"planned","status_as_printed":"Box cut development expected to commence in October 2026","status_statement":{"publisher":"Ivanhoe Electric Inc.","quote":"Box cut development expected to commence in October 2026","provenance":{"source_id":"Ivanhoe Electric Inc.","source_url":"https://ivanhoeelectric.com/news/2026-preliminary-feasibility-study-for-the-santa-cruz-copper-project-in-arizona-confirms-high-grade-low-cost-project-with/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Export-Import Bank of the United States (EXIM)","instrument":"letter_of_interest","stage_as_printed":"Preliminary Project Letter; does not constitute a financing commitment","statement":{"publisher":"Ivanhoe Electric Inc.","quote":"Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project","provenance":{"source_id":"Ivanhoe Electric Inc.","source_url":"https://ivanhoeelectric.com/news/ivanhoe-electric-receives-preliminary-project-letter-from-the-export-import-bank-of-the-united-states-for-1.1-billion-in/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-24","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":1100000000,"currency":"USD"},{"body":"Export-Import Bank of the United States (EXIM)","instrument":"letter_of_interest","stage_as_printed":"any financing remains subject to completion of EXIM Bank’s review and approval process","statement":{"publisher":"Ivanhoe Electric Inc.","quote":"The PPL does not constitute a financing commitment, and any financing remains subject to completion of EXIM Bank’s review and approval process.","provenance":{"source_id":"Ivanhoe Electric Inc.","source_url":"https://ivanhoeelectric.com/news/ivanhoe-electric-receives-preliminary-project-letter-from-the-export-import-bank-of-the-united-states-for-1.1-billion-in/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-24","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Casa Grande, Arizona","capex":{"amount":1430000000,"currency":"USD","covers":"initial project capital in the 2026 Preliminary Feasibility Study (the source says it is higher than in the 2025 study because of cost escalation and design changes)","statement":{"publisher":"Ivanhoe Electric Inc.","quote":"Initial project capital of $1.43 billion results in capital intensity of $19,100/tonne of copper produced","provenance":{"source_id":"Ivanhoe Electric Inc.","source_url":"https://ivanhoeelectric.com/news/2026-preliminary-feasibility-study-for-the-santa-cruz-copper-project-in-arizona-confirms-high-grade-low-cost-project-with/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"siviour-battery-anode-material","name":"Siviour Battery Anode Material Project","company":"Renascor Resources Limited","country_iso3":"AUS","materials":["graphite"],"kind":"mine_and_processing","kind_as_printed":"integrated Battery Anode Material Project (integrated Australian mine-to-PSG project)","status":"planned","status_as_printed":"continues to advance; financing process ongoing","status_statement":{"publisher":"Renascor Resources Limited","quote":"Renascor continues to advance its integrated Battery Anode Material Project","provenance":{"source_id":"Renascor Resources Limited","source_url":"https://renascor.com.au/asx-announcements/261030-quarterly-activities_appendix-5b-cash-flow-report-3145109/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the address answers with the PDF https://renascor.com.au/wp-content/uploads/2026/10/261030-Quarterly-Activities_Appendix-5B-Cash-Flow-Report-3145109.pdf"}},"backing":[{"body":"Australian Government, Critical Minerals Facility","instrument":"loan","stage_as_printed":"conditionally approved","statement":{"publisher":"Renascor Resources Limited","quote":"Renascor has a conditionally approved $185 million loan facility from the Australian Government’s Critical Minerals Facility","provenance":{"source_id":"Renascor Resources Limited","source_url":"https://renascor.com.au/asx-announcements/261030-quarterly-activities_appendix-5b-cash-flow-report-3145109/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":185000000,"currency":"AUD"}],"place":"South Australia"},{"id":"south-crofty-tin","name":"South Crofty Tin Project","company":"Cornish Metals plc","country_iso3":"GBR","materials":["tin"],"kind":"mine_and_processing","kind_as_printed":"South Crofty tin mine (re-opening; underground development, shaft refurbishment, processing infrastructure)","status":"construction","status_as_printed":"completes the financing package for the construction of South Crofty through to first tin in mid-2028","status_statement":{"publisher":"National Wealth Fund","quote":"Works on the site continue at pace, with the funds supporting further mine development and construction, including underground development, shaft refurbishment, processing infrastructure and associated facilities.","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-cornerstones-135m-fundraise-for-cornish-metals-to-reopen-south-crofty-tin-mine/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-22","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"National Wealth Fund (United Kingdom)","instrument":"equity","stage_as_printed":"has today confirmed a cornerstone investment (equity)","statement":{"publisher":"National Wealth Fund","quote":"The National Wealth Fund has today confirmed a £41.7m cornerstone investment into Cornish Metals plc","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-cornerstones-135m-fundraise-for-cornish-metals-to-reopen-south-crofty-tin-mine/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-22","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":41700000,"currency":"GBP"},{"body":"National Wealth Fund (United Kingdom)","instrument":"equity","stage_as_printed":"initial equity investment in January 2025","statement":{"publisher":"National Wealth Fund","quote":"since the National Wealth Fund made its initial £28.6 million equity investment in January 2025","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-cornerstones-135m-fundraise-for-cornish-metals-to-reopen-south-crofty-tin-mine/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-22","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the event itself to 2025-01"}},"amount":28600000,"currency":"GBP"},{"body":"National Wealth Fund (United Kingdom)","instrument":"loan","stage_as_printed":"a shareholder loan will be provided (up to)","statement":{"publisher":"National Wealth Fund","quote":"A shareholder loan of upto £52million will be provided, including up to £35million by the National Wealth Fund alongside Vision Blue Resources","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/the-national-wealth-fund-backs-cornish-metals-with-new-funding-for-south-crofty-tin-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-15","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the October 2026 page of the Fund does not say what became of this loan after the equity raise"}},"amount":35000000,"currency":"GBP"}],"place":"Cornwall","capex":{"amount":198000000,"currency":"GBP","covers":"pre-production capital according to the 2025 update of the preliminary economic assessment (not a feasibility study)","statement":{"publisher":"Cornish Metals plc","quote":"Pre-production capital of £198 million","provenance":{"source_id":"Cornish Metals plc","source_url":"https://cornishmetals.com/project/uk/south-crofty-tin-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"project page is undated (footer 2026); date is the day it was fetched. The figure stands in the list headed '2025 PEA Update'"}}}},{"id":"south-west-arkansas","name":"South West Arkansas Project","company":"Smackover Lithium","country_iso3":"USA","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Direct Lithium Extraction","status":"planned","status_as_printed":"expects to take FID by the end of the first quarter of 2027","status_statement":{"publisher":"Standard Lithium Ltd.","quote":"Smackover Lithium expects to take FID by the end of the first quarter of 2027, with construction beginning shortly thereafter","provenance":{"source_id":"Standard Lithium Ltd.","source_url":"https://www.standardlithium.com/projects/smackover/south-west-arkansas/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"project web page is undated; date is the fetch date"}},"backing":[{"body":"U.S. Department of Energy, Office of Manufacturing & Energy Supply Chains","instrument":"grant","stage_as_printed":"closed","statement":{"publisher":"Standard Lithium Ltd.","quote":"has closed the US$225 million grant from the U.S. Department of Energy’s","provenance":{"source_id":"Standard Lithium Ltd.","source_url":"https://www.standardlithium.com/news/standard-lithium-and-equinor-finalize-225-million-grant-from-the-us-department-of-energy-for-the-south-west-arkansas-project","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":225000000,"currency":"USD"}],"place":"southern Arkansas","capex":{"amount":1450000000,"currency":"USD","covers":"All-in Class III capex estimate (Definitive Feasibility Study), includes a 12.3% contingency","statement":{"publisher":"Standard Lithium Ltd.","quote":"All-in Class III capex estimate of $1.45 billion includes a 12.3% Monte Carlo risked contingency.","provenance":{"source_id":"Standard Lithium Ltd.","source_url":"https://www.standardlithium.com/projects/smackover/south-west-arkansas/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"project web page is undated; date is the fetch date; page refers to a DFS press release dated September 3, 2025"}}}},{"id":"stibnite-gold-project","name":"Stibnite Gold Project","company":"Perpetua Resources Corp.","country_iso3":"USA","materials":["antimony"],"kind":"mine_and_processing","kind_as_printed":"Stibnite Gold Project","status":"construction","status_as_printed":"early works construction; Final Investment Decision expected in the second half of 2026","status_statement":{"publisher":"Perpetua Resources Corp.","quote":"continued early works construction and began procurement for long-lead time items ahead of our Final Investment Decision expected in the second half of 2026","provenance":{"source_id":"Perpetua Resources Corp.","source_url":"https://perpetuaresources.com/wp-content/uploads/Perpetua-Resources-Q1-2026-PR.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Export-Import Bank of the United States","instrument":"loan","stage_as_printed":"unanimously agreed to notify Congress of a proposed","statement":{"publisher":"Perpetua Resources Corp.","quote":"unanimously agreed to notify Congress of a proposed $2.7 billion senior secured long-term loan","provenance":{"source_id":"Perpetua Resources Corp.","source_url":"https://perpetuaresources.com/wp-content/uploads/U.S.-EXIMs-Board-Advances-Proposed-2.7-Billion-Loan-to-Congressional-Notice-Perpetua-Announces-Improved-Project-Economics_March-31-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":2700000000,"currency":"USD"},{"body":"Export-Import Bank of the United States","instrument":"loan","stage_as_printed":"unanimously approved","statement":{"publisher":"Perpetua Resources Corp.","quote":"has unanimously approved a $2.9 billion senior secured long-term loan","provenance":{"source_id":"Perpetua Resources Corp.","source_url":"https://perpetuaresources.com/wp-content/uploads/Perpetua-Resources-EXIM-press-release-May-21-2026-FINAL.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":2900000000,"currency":"USD"}],"place":"Valley County, Idaho","capex":{"amount":2576000000,"currency":"USD","covers":"Initial Capital, including contingency; exclusive of pre-production revenue (Technical Report Summary as of December 31, 2025)","statement":{"publisher":"Perpetua Resources Corp.","quote":"Initial Capital, reflects estimated total capital expenditures of $2,576 million as of December 31, 2025, including a contingency of $191.9 million","provenance":{"source_id":"Perpetua Resources Corp.","source_url":"https://perpetuaresources.com/wp-content/uploads/U.S.-EXIMs-Board-Advances-Proposed-2.7-Billion-Loan-to-Congressional-Notice-Perpetua-Announces-Improved-Project-Economics_March-31-2026.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"strange-lake","name":"Strange Lake rare earth project","company":"Torngat Metals Ltd.","country_iso3":"CAN","materials":["rare-earths"],"kind":"mine_and_processing","kind_as_printed":"Strange Lake rare earth project","status":"planned","status_as_printed":"key pre-construction activities, including engineering and environmental studies","status_statement":{"publisher":"Torngat Metals Ltd.","quote":"This CA$165 million of combined financing will enable Torngat Metals to carry out key pre-construction activities, including engineering and environmental studies","provenance":{"source_id":"Torngat Metals Ltd.","source_url":"https://torngatmetals.com/torngat-metals-secures-165-million-in-financing-from-export-development-canada-and-canada-infrastructure-bank/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the company's undated project page, read on 2026-11-16, still says the feasibility study and impact assessments are being completed and that construction is expected to begin after the permits are issued"}},"backing":[{"body":"Export Development Canada","instrument":"loan","stage_as_printed":"bridge financing (the company calls it a signed bridge loan facility agreement)","statement":{"publisher":"Export Development Canada","quote":"is announcing a $110 million bridge financing to Torngat Metals to support the next phase of its Strange Lake rare earth project","provenance":{"source_id":"Export Development Canada","source_url":"https://www.edc.ca/en/about-us/news/edc-financing-torngat-metals.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page prints '$' without a currency code; the company's release prints CA$110 million"}},"amount":110000000,"currency":"CAD"},{"body":"Canada Infrastructure Bank","instrument":"loan","stage_as_printed":"loan commitment of up to CA$55 million, subject to all regulatory permits and processes being secured","statement":{"publisher":"Torngat Metals Ltd.","quote":"and a loan commitment of up to CA$55 million from the Canada Infrastructure Bank","provenance":{"source_id":"Torngat Metals Ltd.","source_url":"https://torngatmetals.com/torngat-metals-secures-165-million-in-financing-from-export-development-canada-and-canada-infrastructure-bank/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":55000000,"currency":"CAD"}],"place":"Nunavik, northern Quebec (separation plant planned in Sept-Îles)","links":[{"publisher":"Canada Infrastructure Bank","url":"https://cib-bic.ca/en/medias/articles/cibs-55-million-loan-to-torngat-metals-strengthens-canadas-critical-minerals-sector/"}]},{"id":"talga-vittangi-anode","name":"Talga Natural Graphite ONE (Vittangi Anode Project)","company":"Talga AB","country_iso3":"SWE","materials":["graphite"],"kind":"mine_and_processing","kind_as_printed":"extraction project (Commission annex); vertically integrated operation (company)","status":"planned","status_as_printed":"FINANCIAL CLOSE DATE 31 January, 2028; ENTRY INTO OPERATION DATE 31 December, 2030 (Innovation Fund fiche for the anode refinery part)","status_statement":{"publisher":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","quote":"FINANCIAL CLOSE DATE 31 January, 2028 ENTRY INTO OPERATION DATE 31 December, 2030","provenance":{"source_id":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","source_url":"https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101191036.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-02","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 44)","statement":{"publisher":"European Commission","quote":"Talga Natural Graphite ONE is an ongoing extraction project in Sweden. The project promoted by Talga AB","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"European Investment Bank","instrument":"loan","stage_as_printed":"board has approved (EIB project page: Approved | 15/06/2023; amount 'not disclosed' there)","statement":{"publisher":"Talga Group Ltd","quote":"board has approved €150 million senior debt funding","provenance":{"source_id":"Talga Group Ltd","source_url":"https://talgagroup.eu-central-1.linodeobjects.com/app/uploads/2023/06/20092357/20230620EIBApproval_ASX.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-06-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":150000000,"currency":"EUR"},{"body":"EU Innovation Fund","instrument":"grant","stage_as_printed":"AMOUNT OF INNOVATION FUND GRANT (project TalnodeONE, starting date 01 April, 2025)","statement":{"publisher":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","quote":"AMOUNT OF INNOVATION FUND GRANT EUR 70,000,000","provenance":{"source_id":"European Climate, Infrastructure and Environment Executive Agency (CINEA)","source_url":"https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101191036.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-02","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"fiche 'Updated on 02 October 2026'"}},"amount":70000000,"currency":"EUR"}],"place":"northern Sweden","capex":{"amount":560000000,"currency":"EUR","covers":"capital costs for the construction of the vertically integrated operation (excluding €39m contingency)","statement":{"publisher":"Talga Group Ltd","quote":"capital costs for the construction of the vertically integrated operation are now estimated at €560 million (excluding €39m contingency)","provenance":{"source_id":"Talga Group Ltd","source_url":"https://talgagroup.eu-central-1.linodeobjects.com/app/uploads/2024/04/15091050/20240415FeedCompleted_ASX.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-04-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},"links":[{"publisher":"European Investment Bank","url":"https://www.eib.org/en/projects/pipelines/all/20220643"}]},{"id":"thacker-pass","name":"Thacker Pass","company":"Lithium Americas Corp.","country_iso3":"USA","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Thacker Pass lithium project","status":"construction","status_as_printed":"major construction of the processing plant at Thacker Pass Phase 1","status_statement":{"publisher":"Lithium Americas Corp.","quote":"The Company continues to progress major construction of the processing plant at Thacker Pass Phase 1, targeting mechanical completion in late 2027.","provenance":{"source_id":"Lithium Americas Corp.","source_url":"https://lithiumamericas.com/news/news-details/2026/Lithium-Americas-Reports-First-Quarter-2026-Results/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of Energy, Loan Programs Office","instrument":"loan","stage_as_printed":"closed","statement":{"publisher":"Lithium Americas Corp.","quote":"Loan Programs Office closed a $2.26 billion loan under the Advanced Technology Vehicles Manufacturing Loan Program","provenance":{"source_id":"Lithium Americas Corp.","source_url":"https://lithiumamericas.com/news/news-details/2025/Lithium-Americas-Reports-2024-Full-Year-Results/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-28","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the statement dates the event itself to 2024-10-28"}},"amount":2260000000,"currency":"USD"},{"body":"U.S. Department of Energy, Loan Programs Office","instrument":"equity","stage_as_printed":"restructured its deal; 5% equity ownership in the form of LAC warrants","statement":{"publisher":"U.S. Department of Energy","quote":"The new terms provide the U.S. Government with 5% equity ownership in the form of LAC warrants","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/department-energy-restructures-lithium-americas-deal-protect-taxpayers-and-onshore","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-09-30","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"U.S. Department of Energy","instrument":"loan","stage_as_printed":"Project financing for Phase 1 includes a $2.23 billion loan","statement":{"publisher":"Lithium Americas Corp.","quote":"Project financing for Phase 1 includes a $2.23 billion loan from the U.S. DOE and strategic investments from GM and Orion.","provenance":{"source_id":"Lithium Americas Corp.","source_url":"https://lithiumamericas.com/news/news-details/2026/Lithium-Americas-Reports-First-Quarter-2026-Results/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":2230000000,"currency":"USD"}],"place":"Humboldt County, Nevada","capex":{"amount":2930000000,"currency":"USD","covers":"total Capex estimate per the Company's Technical Report (effective December 31, 2024), Thacker Pass Phase 1; source says it did not include any exposure to tariffs","statement":{"publisher":"Lithium Americas Corp.","quote":"of which $1.1 billion is part of the total Capex estimate of $2.93 billion per the Company’s Technical Report.","provenance":{"source_id":"Lithium Americas Corp.","source_url":"https://lithiumamericas.com/news/news-details/2026/Lithium-Americas-Reports-First-Quarter-2026-Results/default.aspx","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-14","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"tia-maria","name":"Tía María","company":"Southern Perú Copper Corporation","country_iso3":"PER","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"proyecto Tía María (open pit; copper cathodes)","status":"construction","status_as_printed":"comenzó la etapa de ejecución del proyecto Tía María","status_statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"comenzó la etapa de ejecución del proyecto Tía María, en Arequipa, con una inversión estimada de US$ 1,805 millones","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the book prints 'Primera edición - Lima - mayo de 2026'; the ministry's page lists it under 17 June 2026"}},"backing":[],"place":"Islay province, Arequipa","capex":{"amount":1805000000,"currency":"USD","covers":"Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate)","statement":{"publisher":"Ministerio de Energía y Minas del Perú","quote":"Tía María (US$ 1,805 millones) y Pampa de Pongo (US$ 1,781 millones)","provenance":{"source_id":"Ministerio de Energía y Minas del Perú","source_url":"https://cdn.www.gob.pe/uploads/document/file/10173250/8277304-cpim-2026.pdf?v=1782158300","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05","licence":"Reproduction permitted with the source cited (notice printed in the Cartera de Proyectos de Inversión Minera 2026; it covers that publication, not the whole site)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"tovaku","name":"Tovaku","company":"Pucobre (60%) and Codelco (40%)","country_iso3":"CHL","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"TOVAKU (46 ktpa copper cathodes)","status":"planned","status_as_printed":"Pucobre is requesting the early incorporation of the project company to enable the execution of US$20 million in early works","status_statement":{"publisher":"Codelco","quote":"Pucobre is requesting the early incorporation of the project company to enable the execution of US$20 million in early works","provenance":{"source_id":"Codelco","source_url":"https://www.codelco.com/prontus_codelco/site/docs/20171010/20171010090846/202609_presentation_1h26_results.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Corporate Presentation September 2026; the slide also says the feasibility study is final and the environmental impact assessment was filed"}},"backing":[],"place":"northern Chile (the source's map shows Tocopilla)","capex":{"amount":870000000,"currency":"USD","covers":"CAPEX of the Tovaku project as printed on Codelco's partnership slide","statement":{"publisher":"Codelco","quote":"CAPEX US$ 870m PUCOBRE 60% CODELCO 40% TOVAKU","provenance":{"source_id":"Codelco","source_url":"https://www.codelco.com/prontus_codelco/site/docs/20171010/20171010090846/202609_presentation_1h26_results.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"trail-strategic-metals","name":"Trail Operations Strategic Metals Initiative","company":"Teck Resources Limited","country_iso3":"CAN","materials":["germanium","gallium","antimony"],"kind":"processing","kind_as_printed":"expanding production capacity for germanium, gallium, and antimony at Teck’s Trail Operations smelting and refining complex","status":"planned","status_as_printed":"signed a Strategic Investment Agreement to support expanding production capacity","status_statement":{"publisher":"Canada Growth Fund","quote":"to support expanding production capacity for germanium, gallium, and antimony at Teck’s Trail Operations smelting and refining complex in British Columbia","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/teck-resources/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"an expansion at a smelter that is in operation; the agreement sets a framework and states the intent to work towards an investment"}},"backing":[{"body":"Canada Growth Fund","instrument":"equity","stage_as_printed":"the Agreement establishes the commercial framework for an equity-like investment; intent of both parties to work towards an investment","statement":{"publisher":"Canada Growth Fund","quote":"establishes the commercial framework for an equity-like investment by CGF of up to $400 million directly into the facility","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/teck-resources/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":400000000,"currency":"CAD"},{"body":"Government of Canada (Canada Critical Minerals Accelerator, Natural Resources Canada, managed by Export Development Canada)","instrument":"offtake","stage_as_printed":"the Agreement also provides for the establishment of an offtake structure","statement":{"publisher":"Canada Growth Fund","quote":"the establishment of an offtake structure with the Government of Canada, including offtake rights for a portion of future germanium, antimony and gallium produced by Trail","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/teck-resources/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Trail, British Columbia","capex":{"amount":850000000,"currency":"CAD","covers":"an 'up to' potential total investment by Teck to sustain and enhance critical minerals processing capacity at Trail Operations; a ceiling, not a capital cost estimate","statement":{"publisher":"Canada Growth Fund","quote":"as part of an up to $850 million-dollar potential total investment by Teck to sustain and enhance critical minerals processing capacity at Trail Operations","provenance":{"source_id":"Canada Growth Fund","source_url":"https://www.cgf-fcc.ca/en/news/teck-resources/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the page prints '$' without a currency code; CAD is inferred from the publisher"}}}},{"id":"trelavour-lithium","name":"Trelavour Lithium Project","company":"Cornish Lithium","country_iso3":"GBR","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"Trelavour Lithium Project (feasibility study; demonstration plant for the processing technology)","status":"planned","status_as_printed":"progress towards a construction decision","status_statement":{"publisher":"National Wealth Fund","quote":"Funding will progress the Trelavour Lithium Project towards a construction decision and the Cross Lanes Geothermal Lithium Project to commercial drilling","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-announces-a-31m-commitment-to-cornish-lithium-to-advance-projects-to-next-stage-of-development/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-09-23","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"National Wealth Fund (United Kingdom)","instrument":"equity","stage_as_printed":"commitment of up to; subject to various conditions including shareholder approval","statement":{"publisher":"National Wealth Fund","quote":"£35m of equity funding secured with up to £31m from the National Wealth Fund (NWF) and £4m from TechMet.","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-announces-a-31m-commitment-to-cornish-lithium-to-advance-projects-to-next-stage-of-development/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-09-23","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the funding is for the company (Trelavour and the Cross Lanes geothermal lithium project), not for Trelavour alone"}},"amount":31000000,"currency":"GBP"}],"place":"Cornwall"},{"id":"tumas","name":"Tumas Uranium Project","company":"Deep Yellow Limited","country_iso3":"NAM","materials":["uranium"],"kind":"mine_and_processing","kind_as_printed":"greenfields uranium project","status":"planned","status_as_printed":"current equity market conditions do not support a Final Investment Decision (FID) in Q4 2026; civil works have commenced","status_statement":{"publisher":"Deep Yellow Limited","quote":"has determined that current equity market conditions do not support a Final Investment Decision (FID) in Q4 2026","provenance":{"source_id":"Deep Yellow Limited","source_url":"https://deepyellow.com.au/wp-content/uploads/UpdateTumasProjectNamibia16Oct26.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-16","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"civil and concrete works were under way on this date, funded from cash, but the investment decision had been deferred; kept as planned"}},"backing":[],"place":"Namibia","capex":{"amount":474000000,"currency":"USD","covers":"initial capital cost as shown in the March 2026 corporate update; the October 2026 release says an updated value case is still to be published","statement":{"publisher":"Deep Yellow Limited","quote":"Initial capex 1 US$474m","provenance":{"source_id":"Deep Yellow Limited","source_url":"https://deepyellow.com.au/wp-content/uploads/CorporateUpdate02Mar26.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-03","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the \"1\" after capex is a footnote mark; slides print March 2026"}}}},{"id":"tungsten-west-hemerdon","name":"Tungsten West (Hemerdon tungsten and tin mine)","company":"Tungsten West PLC","country_iso3":"GBR","materials":["tungsten"],"kind":"mine","kind_as_printed":"extraction project","status":"construction","status_as_printed":"Construction is underway","status_statement":{"publisher":"Tungsten West","quote":"The permits are in place. Construction is underway.","provenance":{"source_id":"Tungsten West","source_url":"https://www.tungstenwest.com/project/hemerdon-mine","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-11-13","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"page is undated; date is the day it was fetched"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project in a third country (Commission Decision C(2025) 3491, annex item 12)","statement":{"publisher":"European Commission","quote":"Tungsten West is an ongoing extraction project in the United Kingdom. The project promoted by Tungsten West PLC","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/60c576a5-435e-43e6-83de-c81f3652259b_en?filename=C_2025_3491_1_EN_annexe_acte_autonome_part1_v3.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"National Wealth Fund (United Kingdom)","instrument":"equity","stage_as_printed":"has announced an investment","statement":{"publisher":"National Wealth Fund","quote":"The financing consists of a £36 million equity investment alongside up to £35 million of lending","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-backs-tungsten-west-to-unlock-critical-uk-tungsten-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-25","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":36000000,"currency":"GBP"},{"body":"National Wealth Fund (United Kingdom)","instrument":"loan","stage_as_printed":"has announced an investment (up to £35 million of lending)","statement":{"publisher":"National Wealth Fund","quote":"The financing consists of a £36 million equity investment alongside up to £35 million of lending","provenance":{"source_id":"National Wealth Fund","source_url":"https://www.nationalwealthfund.org.uk/news-and-publications/news/national-wealth-fund-backs-tungsten-west-to-unlock-critical-uk-tungsten-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-08-25","licence":"Open Government Licence (National Wealth Fund terms and conditions)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":35000000,"currency":"GBP"}],"place":"Devon"},{"id":"us-smelter-clarksville","name":"U.S. Smelter","company":"Korea Zinc","country_iso3":"USA","materials":["copper","antimony","gallium","germanium"],"kind":"processing","kind_as_printed":"large-scale smelter","status":"planned","status_as_printed":"Full-scale construction will start in 2027","status_statement":{"publisher":"Korea Zinc","quote":"Full-scale construction will start in 2027, with completion planned for 2029","provenance":{"source_id":"Korea Zinc","source_url":"https://www.koreazinc.co.kr/en/korea-zinc-partners-with-the-u-s-department-of-war-and-u-s-department-of-commerce-to-build-a-state-of-the-art-critical-minerals-smelter-in-the-united-states-with-6-6-billion-of-capital-expenditures/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of War","instrument":"other","stage_as_printed":"conditional investment","statement":{"publisher":"Korea Zinc","quote":"The Department of War’s conditional investment of $1.4 billion to build the first U.S.-based zinc smelter and critical minerals processing facility","provenance":{"source_id":"Korea Zinc","source_url":"https://www.koreazinc.co.kr/en/korea-zinc-partners-with-the-u-s-department-of-war-and-u-s-department-of-commerce-to-build-a-state-of-the-art-critical-minerals-smelter-in-the-united-states-with-6-6-billion-of-capital-expenditures/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":1400000000,"currency":"USD"},{"body":"U.S. Department of War together with investors","instrument":"other","stage_as_printed":"arranged by the U.S. Department of War together with investors","statement":{"publisher":"Korea Zinc","quote":"Approximately $2.15 billion, arranged by the U.S. Department of War together with investors, will be invested in the smelter construction.","provenance":{"source_id":"Korea Zinc","source_url":"https://www.koreazinc.co.kr/en/korea-zinc-partners-with-the-u-s-department-of-war-and-u-s-department-of-commerce-to-build-a-state-of-the-art-critical-minerals-smelter-in-the-united-states-with-6-6-billion-of-capital-expenditures/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":2150000000,"currency":"USD"},{"body":"U.S. Department of Commerce (CHIPS Act)","instrument":"grant","stage_as_printed":"will provide $210 million in award funding","statement":{"publisher":"Korea Zinc","quote":"The U.S. Department of Commerce will provide $210 million in award funding under the CHIPS Act for U.S. equipment procurement and other purposes.","provenance":{"source_id":"Korea Zinc","source_url":"https://www.koreazinc.co.kr/en/korea-zinc-partners-with-the-u-s-department-of-war-and-u-s-department-of-commerce-to-build-a-state-of-the-art-critical-minerals-smelter-in-the-united-states-with-6-6-billion-of-capital-expenditures/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":210000000,"currency":"USD"}],"place":"Clarksville, Tennessee","capex":{"amount":6600000000,"currency":"USD","covers":"capital expenditures; total planned investment of $7.4 billion including working capital and financing costs","statement":{"publisher":"Korea Zinc","quote":"is expected to have $6.6 billion in capital expenditures, with a total planned investment of $7.4 billion including working capital and financing costs","provenance":{"source_id":"Korea Zinc","source_url":"https://www.koreazinc.co.kr/en/korea-zinc-partners-with-the-u-s-department-of-war-and-u-s-department-of-commerce-to-build-a-state-of-the-art-critical-minerals-smelter-in-the-united-states-with-6-6-billion-of-capital-expenditures/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"vicuna","name":"Vicuña (Josemaría and Filo del Sol)","company":"Vicuña Argentina SA","country_iso3":"ARG","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"Proyecto Único denominado “Vicuña” (open-pit mining, concentrator, leaching facilities)","status":"planned","status_as_printed":"inversión total … a ejecutarse en dos (2) etapas; Etapa 1 until 31 December 2026, Etapa 2 from 1 January 2027 to 31 December 2031","status_statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"la Etapa 1 comprende desde el 8 de julio de 2024 y hasta el 31 de diciembre de 2026","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/345167/20260730","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the resolution gives the two investment stages but no date for the start of construction; status read as planned"}},"backing":[{"body":"Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)","instrument":"other","stage_as_printed":"Apruébase la solicitud de adhesión … como Proyecto de Exportación Estratégica de Largo Plazo; adhesion date 3 June 2026","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/345167/20260730","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Resolución 1154/2026 of 28 July 2026; adhesion to a regime of tax, customs and foreign-exchange incentives, not a payment of public money"}}}],"place":"San Juan province","capex":{"amount":9737014000,"currency":"USD","covers":"total investment declared by the applicant in its RIGI investment plan (of which USD 9.024.732.281 in computable assets), in two stages","statement":{"publisher":"Boletín Oficial de la República Argentina (Ministerio de Economía)","quote":"inversión total de nueve mil setecientos treinta y siete millones catorce mil dólares estadounidenses (USD 9.737.014.000)","provenance":{"source_id":"Boletín Oficial de la República Argentina (Ministerio de Economía)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/345167/20260730","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-30","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"viscaria-copper","name":"Viscaria Copper Project","company":"Gruvaktiebolaget Viscaria","country_iso3":"SWE","materials":["copper"],"kind":"mine_and_processing","kind_as_printed":"extraction project (Commission annex); restart of the Viscaria mine with a processing plant (company)","status":"construction","status_as_printed":"groundworks that commenced during the summer and the construction activities that began in the autumn","status_statement":{"publisher":"Gruvaktiebolaget Viscaria","quote":"prepared for the groundworks that commenced during the summer and the construction activities that began in the autumn","provenance":{"source_id":"Gruvaktiebolaget Viscaria","source_url":"https://storage.mfn.se/d093e779-2d26-4986-9427-8a01e7b1222f/viscaria-q1-2026-en.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"interim report January-March 2026, dated Kiruna, 7 May 2026; the PDF is the company's report as hosted by its news distributor (storage.mfn.se)"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2026) 8051, annex item 45)","statement":{"publisher":"European Commission","quote":"The project promoted by Gruvaktiebolaget Viscaria aims to contribute to the supply of copper.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/efabd887-9c12-4a3d-910e-8433c0f63a81_en?filename=C_2026_8051_F1_ANNEX_EN_V3_P1_5091583.PDF","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"Kiruna","capex":{"amount":10000000000,"currency":"SEK","covers":"total project scope as estimated at the Capital Markets Day of 7 May 2026 (up from about SEK 9 billion); the report does not break the figure down","statement":{"publisher":"Gruvaktiebolaget Viscaria","quote":"the total project scope is now estimated at approximately SEK 10 billion, up from the previous estimate of approximately SEK 9 billion","provenance":{"source_id":"Gruvaktiebolaget Viscaria","source_url":"https://storage.mfn.se/d093e779-2d26-4986-9427-8a01e7b1222f/viscaria-q1-2026-en.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"vulcan-lionheart","name":"Zero Carbon Lithium (Phase One Lionheart Project)","company":"Vulcan Energie Ressourcen GmbH","country_iso3":"DEU","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"extraction project (Commission annex); integrated lithium and renewable energy project (company)","status":"construction","status_as_printed":"Final Investment Decision in December 2025, when construction activities officially commenced","status_statement":{"publisher":"Vulcan Energy","quote":"The achievement follows the successful completion of the project's financing package and Final Investment Decision in December 2025, when construction activities officially commenced.","provenance":{"source_id":"Vulcan Energy","source_url":"https://www.v-er.eu/news-media/vulcan-reaches-financial-close-for-phase-one-lionheart-financing-package","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 47)","statement":{"publisher":"European Commission","quote":"Zero Carbon Lithium is an ongoing extraction project in Germany. The project promoted by Vulcan Energie Ressourcen GmbH","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/e9c90c91-7492-4047-bc51-d0c9d5e89a2f_en?filename=C_2025_1904_1_EN_annexe_acte_autonome_part1_v2.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"body":"Raw Materials Fund (managed by KfW, under the Germany Fund)","instrument":"equity","stage_as_printed":"is investing up to","statement":{"publisher":"KfW","quote":"Raw Materials Fund, under the umbrella of the Germany Fund, is investing up to EUR 150 million in the implementation of the ambitious Lionheart project","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/About-KfW/Newsroom/Latest-News/Deutschlandfonds.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-09","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the KfW page prints 'News of 9 September 2026' above this item"}},"amount":150000000,"currency":"EUR"}],"place":"Upper Rhine Valley","links":[{"publisher":"European Investment Bank","url":"https://www.eib.org/en/press/all/2025-486-vulcan-energy-secures-eur250-million-eib-financing-for-landmark-lithium-project-in-germany"}]},{"id":"wagerup-gallium","name":"Wagerup gallium project (Alcoa-Sojitz Gallium Recovery Project)","company":"Alcoa of Australia Limited","country_iso3":"AUS","materials":["gallium"],"kind":"processing","kind_as_printed":"new gallium production facility at Alcoa’s Wagerup alumina refinery","status":"planned","status_as_printed":"Final Investment Decision confirmed; construction is expected to commence following final site preparations and regulatory approvals","status_statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"Construction is expected to commence following final site preparations and regulatory approvals.","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/albanese-government-supports-wagerup-critical-mineral-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"Australian Government","instrument":"equity","stage_as_printed":"Australia is announcing today up to USD$200 million in concessional equity finance","statement":{"publisher":"Export Finance Australia (Prime Minister's media release)","quote":"Australia is announcing today up to USD$200 million in concessional equity finance for the project, which includes a right of offtake for the Australian Government.","provenance":{"source_id":"Export Finance Australia (Prime Minister's media release)","source_url":"https://www.exportfinance.gov.au/newsroom/historic-critical-minerals-framework-signed-by-president-trump-and-prime-minister-albanese/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-21","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the sentence before it names the project: 'The first project is the Alcoa-Sojitz Gallium Recovery Project in Wagerup, Western Australia.'"}},"amount":200000000,"currency":"USD"},{"body":"Export Finance Australia, Critical Minerals Facility","instrument":"other","stage_as_printed":"Australia’s financing is being provided through Export Finance Australia (EFA) under the Critical Minerals Facility (CMF)","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"Australia’s financing is being provided through Export Finance Australia (EFA) under the Critical Minerals Facility (CMF) and delivers on the objectives of the Critical Minerals Strategic Reserve.","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/albanese-government-supports-wagerup-critical-mineral-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"no amount is printed in this release"}}}],"place":"Wagerup alumina refinery, Western Australia"},{"id":"white-mesa-heavy-rare-earths","name":"White Mesa Mill heavy rare earth expansion","company":"Energy Fuels Inc.","country_iso3":"USA","materials":["rare-earths"],"kind":"processing","kind_as_printed":"expansion of its White Mesa Mill in Utah to enable the large-scale production of heavy rare earth oxides","status":"construction","status_as_printed":"construction has begun on an expansion of its White Mesa Mill","status_statement":{"publisher":"Energy Fuels Inc.","quote":"today announced that construction has begun on an expansion of its White Mesa Mill in Utah (Mill) to enable the large-scale production of heavy rare earth oxides","provenance":{"source_id":"Energy Fuels Inc.","source_url":"https://investors.energyfuels.com/2026-07-29-Commercial-Scale-Heavy-Rare-Earth-Plant-Now-Under-Construction-in-Utah","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[{"body":"U.S. Department of War, Office of Strategic Capital","instrument":"loan","stage_as_printed":"conditional financing commitment, subject to further due diligence, finalization of agreements, customary closing conditions, and approvals","statement":{"publisher":"Energy Fuels Inc.","quote":"The Company has received a conditional $725 million financing commitment from the Department of War, U.S. Office of Strategic Capital","provenance":{"source_id":"Energy Fuels Inc.","source_url":"https://investors.energyfuels.com/Y-m-d-Energy-Fuels-Receives-Conditional-U-S-Government-Support-to-Accelerate-Growth-in-Rare-Earths-and-Critical-Materials","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the conditional loan is for the planned expansion of the White Mesa Mill as a whole and for a planned rare earth metals and alloy facility, not for the heavy rare earth expansion alone"}},"amount":725000000,"currency":"USD"},{"body":"U.S. government (lender not named in this statement)","instrument":"loan","stage_as_printed":"debt component planned to be covered by a previously announced conditional loan commitment","statement":{"publisher":"Energy Fuels Inc.","quote":"The debt component for the heavy rare earth expansion is planned to be covered by a previously announced conditional loan commitment from the U.S. government.","provenance":{"source_id":"Energy Fuels Inc.","source_url":"https://investors.energyfuels.com/2026-07-29-Commercial-Scale-Heavy-Rare-Earth-Plant-Now-Under-Construction-in-Utah","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}],"place":"White Mesa Mill, Utah","capex":{"amount":104000000,"currency":"USD","covers":"total capital expenditure of the heavy rare earth expansion only; the separate, larger Phase 2 Circuit of the mill (a January 2026 study prints $410 million for it) is still awaiting regulatory approval and is not in this figure","statement":{"publisher":"Energy Fuels Inc.","quote":"This expansion project is estimated to have a total capital expenditure of approximately $104 million","provenance":{"source_id":"Energy Fuels Inc.","source_url":"https://investors.energyfuels.com/2026-07-29-Commercial-Scale-Heavy-Rare-Earth-Plant-Now-Under-Construction-in-Utah","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}},{"id":"yellowhead-copper","name":"Yellowhead Copper Project","company":"Trekor Metals Limited (formerly Taseko Mines)","country_iso3":"CAN","materials":["copper"],"kind":"mine","kind_as_printed":"a proposed open-pit copper mine","status":"planned","status_as_printed":"a proposed open-pit copper mine; Detailed Project Description submitted to the BC Environmental Assessment Office","status_statement":{"publisher":"Trekor Metals Limited","quote":"a proposed open-pit copper mine located in British Columbia's Thompson-Nicola region","provenance":{"source_id":"Trekor Metals Limited","source_url":"https://www.trekormetals.com/investors/news/trekor-advances-environmental-assessment-for--yellowhead-copper-project/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-07","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"backing":[],"place":"Thompson-Nicola region, British Columbia","capex":{"amount":2000000000,"currency":"CAD","covers":"initial capital cost on a presentation slide that cites the Technical Report Update dated July 10th, 2025 (effective date June 15, 2025)","statement":{"publisher":"Trekor Metals Limited","quote":"Initial capital cost C$2.0 billion","provenance":{"source_id":"Trekor Metals Limited","source_url":"https://www.trekormetals.com/_resources/presentations/October-2026-Corporate-Presentation.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the presentation prints only 'October 2026'"}}}},{"id":"zinnwald-lithium","name":"Zinnwald Lithium Project","company":"AMG Critical Materials N.V. (Zinnwald Lithium Plc)","country_iso3":"DEU","materials":["lithium"],"kind":"mine_and_processing","kind_as_printed":"integrated project (Commission annex)","status":"planned","status_as_printed":"near-term focus on reviewing, redefining, and advancing the project; this phase will take approximately 18-24 months","status_statement":{"publisher":"AMG Critical Materials N.V.","quote":"our near-term focus will be on reviewing, redefining, and advancing the project","provenance":{"source_id":"AMG Critical Materials N.V.","source_url":"https://amg-nv.com/investors/press-release/amg-critical-materials-n-v-successfully-closes-the-acquisition-of-zinnwald-lithium-plc/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-27","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"the new owner speaks of 'rightsizing the initial project scope'; no capital cost by the new owner was read, and the former owner's site now redirects to AMG Lithium"}},"backing":[{"body":"European Commission","instrument":"strategic_project_status","stage_as_printed":"recognised as Strategic Project (Commission Decision C(2026) 8051, annex item 46)","statement":{"publisher":"European Commission","quote":"Zinnwald Lithium Project is an ongoing integrated project in Germany.","provenance":{"source_id":"European Commission","source_url":"https://single-market-economy.ec.europa.eu/document/download/efabd887-9c12-4a3d-910e-8433c0f63a81_en?filename=C_2026_8051_F1_ANNEX_EN_V3_P1_5091583.PDF","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]}],"finance_events":[{"id":"sau-pif-maaden-manara-2023","date":"2023-01-11","date_is":"announcement","jurisdiction":"Saudi Arabia","jurisdictions_iso3":["SAU"],"materials":["iron-ore","copper","nickel","lithium"],"type":"finance","instrument":"equity","scope_as_printed":"invest in mining assets globally; initially iron ore, copper, nickel, and lithium, as a non-operating partner taking minority equity positions","summary":"The Public Investment Fund and the state-controlled miner Ma'aden agreed to set up a joint company, later named Manara Minerals, to take minority stakes in mining assets abroad and secure physical offtake for Saudi industry.","status":"announced","primary_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","provenance":{"source_id":"Public Investment Fund (PIF), Saudi Arabia","source_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-01-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The release of 2023 does not print the name Manara Minerals (PIF's portfolio page does); the stated capital is the founding capital, not the size of later investments. The page is from 2023 and its present standing was not read."},"statement":{"publisher":"Public Investment Fund (PIF), Saudi Arabia","quote":"The company’s capital will amount to USD 50 million.","provenance":{"source_id":"Public Investment Fund (PIF), Saudi Arabia","source_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-01-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The release of 2023 does not print the name Manara Minerals (PIF's portfolio page does); the stated capital is the founding capital, not the size of later investments. The page is from 2023 and its present standing was not read."}},"amount":50000000,"currency":"USD","amount_as_printed":"The company’s capital will amount to USD 50 million","more":[{"fact":"ownership","statement":{"publisher":"Public Investment Fund (PIF), Saudi Arabia","quote":"Ma’aden will own 51% and PIF will own 49% of the company","provenance":{"source_id":"Public Investment Fund (PIF), Saudi Arabia","source_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-01-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"minerals and manner of investing","statement":{"publisher":"Public Investment Fund (PIF), Saudi Arabia","quote":"The company aims to initially invest in iron ore, copper, nickel, and lithium as a non-operating partner taking minority equity positions.","provenance":{"source_id":"Public Investment Fund (PIF), Saudi Arabia","source_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-01-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"purpose","statement":{"publisher":"Public Investment Fund (PIF), Saudi Arabia","quote":"This will provide physical offtake of critical minerals to ensure supply security for domestic mineral downstream sectors","provenance":{"source_id":"Public Investment Fund (PIF), Saudi Arabia","source_url":"https://www.pif.gov.sa/en/news-and-insights/press-releases/2023/pif-and-maaden/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2023-01-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-crma-joint-purchasing-2024","date":"2024-05-23","date_is":"entry_into_force","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":["cobalt","copper","gallium","germanium","lithium","graphite","nickel","rare-earths","tungsten"],"type":"finance","instrument":"joint_purchasing","scope_as_printed":"strategic raw materials","summary":"The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.","status":"in_force","primary_url":"https://publications.europa.eu/resource/oj/L_202401252","provenance":{"source_id":"Official Journal of the European Union (Publications Office of the European Union)","source_url":"https://publications.europa.eu/resource/oj/L_202401252","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-05-23","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Computed: the source prints the publication date 3.5.2024 and the rule 'twentieth day following that of its publication'; 23 May 2024 itself is not printed in the text."},"statement":{"publisher":"Official Journal of the European Union (Publications Office of the European Union)","quote":"The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union","provenance":{"source_id":"Official Journal of the European Union (Publications Office of the European Union)","source_url":"https://publications.europa.eu/resource/oj/L_202401252","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-05-23","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Computed: the source prints the publication date 3.5.2024 and the rule 'twentieth day following that of its publication'; 23 May 2024 itself is not printed in the text."}},"more":[{"fact":"joint negotiation of purchases allowed (Article 25(5))","statement":{"publisher":"Official Journal of the European Union (Publications Office of the European Union)","quote":"may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement","provenance":{"source_id":"Official Journal of the European Union (Publications Office of the European Union)","source_url":"https://publications.europa.eu/resource/oj/L_202401252","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-05-23","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"coordination of strategic stocks (Article 23)","statement":{"publisher":"Official Journal of the European Union (Publications Office of the European Union)","quote":"shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials","provenance":{"source_id":"Official Journal of the European Union (Publications Office of the European Union)","source_url":"https://publications.europa.eu/resource/oj/L_202401252","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-05-23","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-nds-annual-materials-plan-fy2026-2024","date":"2024-08-29","date_is":"publication","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":["antimony","tungsten","rare-earths"],"type":"finance","instrument":"stockpile","scope_as_printed":"Proposed Fiscal Year 2026 Annual Materials Plan (potential acquisitions, conversions and disposals of the National Defense Stockpile)","summary":"Federal Register notice seeking comments on the proposed fiscal year 2026 plan for National Defense Stockpile acquisitions, including antimony, tungsten and neodymium-praseodymium oxide.","status":"announced","primary_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","quote":"is seeking public comments on the potential market impact of proposed changes to the Fiscal Year (FY) 2026 Annual Materials Plan (AMP)","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"potential acquisition: antimony, 700 metric tons","statement":{"publisher":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","quote":"Antimony....................................... MT............................... 700","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"potential acquisition: tungsten, 587,000 lbs W","statement":{"publisher":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","quote":"Tungsten....................................... Lbs W............................ 587,000","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"potential acquisition: NdPr oxide, 300 metric tons","statement":{"publisher":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","quote":"Neodymium-Praseodymium Oxide................... MT............................... 300","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"nature of the stockpile","statement":{"publisher":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","quote":"The NDS is a strategic stockpile, not an economic stockpile. It is not intended to influence prices in the market","provenance":{"source_id":"Federal Register (Bureau of Industry and Security, U.S. Department of Commerce)","source_url":"https://www.federalregister.gov/documents/full_text/text/2024/08/29/2024-19422.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-08-29","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"bra-bndes-mme-strategic-minerals-fip-2024","date":"2024-10-02","date_is":"announcement","jurisdiction":"Brazil","jurisdictions_iso3":["BRA"],"materials":["cobalt","copper","tin","graphite","lithium","manganese","molybdenum","niobium","nickel","silicon","tantalum","rare-earths","titanium","tungsten","uranium","vanadium","zinc","phosphate-rock"],"type":"finance","instrument":"fund","scope_as_printed":"Fundo de Investimento em Participações (FIP) em Minerais Estratégicos no Brasil; also names Metais do Grupo da Platina and Potássio","summary":"BNDES and Brazil's Ministry of Mines and Energy set up an equity investment fund for strategic minerals, for junior and mid-sized companies in exploration and new mines; managers were named in October 2024; it was still raising capital in 2026.","status":"announced","primary_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-10-02","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Read in the ministry's guide for foreign investors, which prints only the year 2026; the event date is the day the guide gives for the announcement of the fund's managers, not the fund's launch."},"statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"O BNDES vai aportar até R$ 250 milhões no FIP, com participação até 25% do total","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-10-02","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Read in the ministry's guide for foreign investors, which prints only the year 2026; the event date is the day the guide gives for the announcement of the fund's managers, not the fund's launch."}},"amount":250000000,"currency":"BRL","more":[{"fact":"target size of the fund","statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"O FIP é uma parceria lançada entre o BNDES e o MME para mobilizar mais de R$ 1 bilhão","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-10-02","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"standing in 2026","statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"O fundo está em fase de captação com aportes previstos ao longo do primeiro semestre de 2026 para início dos investimentos","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-10-02","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"aus-critical-minerals-production-tax-incentive-2024","date":"2024-11-25","date_is":"announcement","jurisdiction":"Australia","jurisdictions_iso3":["AUS"],"materials":[],"type":"finance","instrument":"other","scope_as_printed":"relevant processing and refining costs for Australia’s 31 critical minerals","summary":"The Treasurer announced the bill for a Critical Minerals Production Tax Incentive, a tax offset on the costs of processing and refining critical minerals in Australia for a limited number of years per project.","status":"announced","primary_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/production-tax-incentives-help-build-future-made","provenance":{"source_id":"Treasury Ministers, Australian Government","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/production-tax-incentives-help-build-future-made","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-11-25","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The status is that of the release (a bill being introduced). Whether and when the bill became law was not read on a page that could be read (ato.gov.au answered 403)."},"statement":{"publisher":"Treasury Ministers, Australian Government","quote":"It establishes a Critical Minerals Production Tax Incentive worth ten per cent of relevant processing and refining costs for Australia’s 31 critical minerals","provenance":{"source_id":"Treasury Ministers, Australian Government","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/production-tax-incentives-help-build-future-made","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-11-25","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The status is that of the release (a bill being introduced). Whether and when the bill became law was not read on a page that could be read (ato.gov.au answered 403)."}},"more":[{"fact":"a bill on that date, not yet law","statement":{"publisher":"Treasury Ministers, Australian Government","quote":"Today the Government will introduce the Future Made in Australia (Production Tax Credit and Other Measures) Bill 2024 to Parliament","provenance":{"source_id":"Treasury Ministers, Australian Government","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/production-tax-incentives-help-build-future-made","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-11-25","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"period and length","statement":{"publisher":"Treasury Ministers, Australian Government","quote":"for critical minerals processed and refined between 2027–28 and 2039–40, for up to ten years per project","provenance":{"source_id":"Treasury Ministers, Australian Government","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/production-tax-incentives-help-build-future-made","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-11-25","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"aus-critical-minerals-facility-2024","date":"2024-12-06","date_is":"publication","jurisdiction":"Australia","jurisdictions_iso3":["AUS"],"materials":[],"type":"finance","instrument":"loan_programme","scope_as_printed":"Critical Minerals Facility (projects aligned with Australia's Critical Minerals Strategy)","summary":"Export Finance Australia manages the Australian Government's Critical Minerals Facility, which lends to and invests in critical minerals projects on the National Interest Account; the facility was later expanded.","status":"in_force","primary_url":"https://www.exportfinance.gov.au/newsroom/additional-support-for-rare-earths-refining-for-a-future-made-in-australia/","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/additional-support-for-rare-earths-refining-for-a-future-made-in-australia/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The date is that of the release read, not of the facility's creation; the date the facility was set up was not read on a page. The amount is the size printed on that date; the January 2026 release prints the expanded size."},"statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"The support will be provided by Export Finance Australia (EFA) through the Government’s $4 billion Critical Minerals Facility (CMF).","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/additional-support-for-rare-earths-refining-for-a-future-made-in-australia/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The date is that of the release read, not of the facility's creation; the date the facility was set up was not read on a page. The amount is the size printed on that date; the January 2026 release prints the expanded size."}},"amount":4000000000,"currency":"AUD","more":[{"fact":"expanded to $5 billion; loans and equity support (release of 12 January 2026)","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"to be drawn from the expanded $5 billion Critical Minerals Facility, which provides government-backed loans and equity support for projects","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"who can access the facility (undated page of Export Finance Australia)","statement":{"publisher":"Export Finance Australia (joint ministerial media release)","quote":"Projects that are aligned with the Critical Minerals Strategy and are otherwise in Australia’s national interest, may be able to access finance through this facility, subject to our due diligence.","provenance":{"source_id":"Export Finance Australia (joint ministerial media release)","source_url":"https://www.exportfinance.gov.au/how-we-can-help/our-solutions/critical-minerals/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-06","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-45x-critical-minerals-final-rule-2024","date":"2024-12-27","date_is":"entry_into_force","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":[],"type":"finance","instrument":"other","scope_as_printed":"applicable critical minerals (advanced manufacturing production credit, section 45X)","summary":"Final Treasury regulations for the Section 45X advanced manufacturing production credit, a tax credit for producers of applicable critical minerals in the United States that is set as a share of their production costs.","status":"in_force","primary_url":"https://www.govinfo.gov/content/pkg/FR-2024-10-28/html/2024-24840.htm","provenance":{"source_id":"Federal Register (Internal Revenue Service, U.S. Department of the Treasury), on govinfo.gov","source_url":"https://www.govinfo.gov/content/pkg/FR-2024-10-28/html/2024-24840.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-27","licence":"Public domain (work of the United States Government, 17 U.S.C. 105; govinfo notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The rate is in the quote and not in our summary. Changes made to the credit by later legislation (2025) were not read on a primary page and are not reflected here."},"statement":{"publisher":"Federal Register (Internal Revenue Service, U.S. Department of the Treasury), on govinfo.gov","quote":"For any applicable critical mineral, the credit amount is equal to 10 percent of the costs incurred by the taxpayer with respect to production of such mineral.","provenance":{"source_id":"Federal Register (Internal Revenue Service, U.S. Department of the Treasury), on govinfo.gov","source_url":"https://www.govinfo.gov/content/pkg/FR-2024-10-28/html/2024-24840.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-27","licence":"Public domain (work of the United States Government, 17 U.S.C. 105; govinfo notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The rate is in the quote and not in our summary. Changes made to the credit by later legislation (2025) were not read on a primary page and are not reflected here."}},"more":[{"fact":"what the credit is for","statement":{"publisher":"Federal Register (Internal Revenue Service, U.S. Department of the Treasury), on govinfo.gov","quote":"the advanced manufacturing production credit established by the Inflation Reduction Act of 2022 to incentivize the production of eligible components within the United States","provenance":{"source_id":"Federal Register (Internal Revenue Service, U.S. Department of the Treasury), on govinfo.gov","source_url":"https://www.govinfo.gov/content/pkg/FR-2024-10-28/html/2024-24840.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2024-12-27","licence":"Public domain (work of the United States Government, 17 U.S.C. 105; govinfo notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"bra-bndes-finep-strategic-minerals-call-2025","date":"2025-01-07","date_is":"announcement","jurisdiction":"Brazil","jurisdictions_iso3":["BRA"],"materials":["lithium","rare-earths","nickel","graphite","silicon"],"type":"finance","instrument":"loan_programme","scope_as_printed":"transformação de minerais estratégicos para a transição energética e a descarbonização (minerais como lítio, terras raras, níquel, grafite e silício)","summary":"Brazil's development bank BNDES and innovation agency Finep opened a public call for business plans to process strategic minerals for the energy transition, offering their financing instruments to selected projects from research to industrial plants.","status":"announced","primary_url":"https://www.gov.br/mme/pt-br/assuntos/noticias/2023-2026/alexandre-silveira-destaca-investimento-de-r-5-bilhoes-em-minerais-estrategicos-com-foco-na-transicao-energetica","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/noticias/2023-2026/alexandre-silveira-destaca-investimento-de-r-5-bilhoes-em-minerais-estrategicos-com-foco-na-transicao-energetica","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-07","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The instrument mixes credit, equity and grant lines of two public financiers; loan_programme is the nearest category. The ministry's page was last updated on 26/10/2026. The BNDES news pages on the call refused the connection and were not read."},"statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"anúncio do investimento de R$ 5 bilhões voltado ao desenvolvimento de negócios que promovam a transformação de minerais estratégicos","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/noticias/2023-2026/alexandre-silveira-destaca-investimento-de-r-5-bilhoes-em-minerais-estrategicos-com-foco-na-transicao-energetica","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-07","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The instrument mixes credit, equity and grant lines of two public financiers; loan_programme is the nearest category. The ministry's page was last updated on 26/10/2026. The BNDES news pages on the call refused the connection and were not read."}},"amount":5000000000,"currency":"BRL","more":[{"fact":"outcome of the selection, as printed in the ministry's 2026 investor guide","statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"Das 124 propostas de planos de negócios submetidas, foram selecionados 56 planos de negócio","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-07","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"what follows for the selected companies (2026 investor guide)","statement":{"publisher":"Ministério de Minas e Energia (Brasil)","quote":"cabendo agora às empresas a formalização das solicitações de ﬁnanciamento","provenance":{"source_id":"Ministério de Minas e Energia (Brasil)","source_url":"https://www.gov.br/mme/pt-br/assuntos/secretarias/geologia-mineracao-e-transformacao-mineral/guia-investidor-minerais-criticos/guia-investidor-estrangeiro-em-minerais-criticos/2026/guia-do-investidor-pt-br-final.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-07","licence":"CC BY-ND 3.0 (gov.br site notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-exim-supply-chain-resiliency-initiative-2025","date":"2025-01-08","date_is":"announcement","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":["rare-earths"],"type":"finance","instrument":"loan_programme","scope_as_printed":"critical minerals and rare earth elements","summary":"The board of the Export-Import Bank approved the Supply Chain Resiliency Initiative, which finances critical-mineral and rare-earth projects abroad that hold long-term offtake contracts with U.S. companies; domestic projects are referred to its Make More in America Initiative.","status":"in_force","primary_url":"https://www.exim.gov/news/export-import-bank-united-states-board-directors-approves-supply-chain-resiliency","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/export-import-bank-united-states-board-directors-approves-supply-chain-resiliency","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"No amount is printed for the initiative. The Make More in America Initiative has its own EXIM page, which is undated and names no minerals; it is therefore not a separate entry."},"statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"The Supply Chain Resiliency Initiative (SCRI) provides targeted financing to develop projects that secure critical minerals and rare earth elements","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/export-import-bank-united-states-board-directors-approves-supply-chain-resiliency","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"No amount is printed for the initiative. The Make More in America Initiative has its own EXIM page, which is undated and names no minerals; it is therefore not a separate entry."}},"more":[{"fact":"board approval","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"Board of Directors today approved a bold new financing tool designed to strengthen U.S. supply chains","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/export-import-bank-united-states-board-directors-approves-supply-chain-resiliency","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"financing is tied to offtake by U.S. importers (initiative page, undated)","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"the financed amount depends on the amount of the off-take contract between the foreign project and the U.S. importer","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/about/special-initiatives/supply-chain-resiliency-initiative","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"domestic production goes through the Make More in America Initiative (initiative page, undated)","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"For U.S. domestic production in critical minerals and rare earth elements, EXIM can provide financing through our Make More in America Initiative (MMIA).","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/about/special-initiatives/supply-chain-resiliency-initiative","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"projects controlled by the People's Republic of China are excluded (initiative page, undated)","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"Additionally, the project cannot be controlled by the PRC.","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/about/special-initiatives/supply-chain-resiliency-initiative","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-08","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"ind-national-critical-mineral-mission-2025","date":"2025-01-29","date_is":"announcement","jurisdiction":"India","jurisdictions_iso3":["IND"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"National Critical Mineral Mission (critical mineral resources vital to Green Technologies)","summary":"India's Union Cabinet approved the launch of the National Critical Mineral Mission, which funds the critical minerals value chain, backs the purchase of mineral assets abroad and proposes a national stockpile of critical minerals.","status":"in_force","primary_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-critical-mineral-mission-to-build-a-resilient-value-chain-for-critical-mineral-resources-vital-to-green-technologies-with-an-outlay-of-rs-34300-crore-over-seven-years","provenance":{"source_id":"Prime Minister's Office, Government of India","source_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-critical-mineral-mission-to-build-a-resilient-value-chain-for-critical-mineral-resources-vital-to-green-technologies-with-an-outlay-of-rs-34300-crore-over-seven-years","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-29","licence":"Reproduction free of charge with acknowledgement of the source (pmindia.gov.in copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Read on the Prime Minister's Office site rather than pib.gov.in. The amount is the government expenditure; the headline's larger outlay adds the expected investment by public-sector undertakings. The stockpile is a proposal within the mission."},"statement":{"publisher":"Prime Minister's Office, Government of India","quote":"has approved the launch of the National Critical Mineral Mission (NCMM) with an expenditure of Rs.16,300 crore and expected investment of Rs.18,000 crore by PSUs, etc.","provenance":{"source_id":"Prime Minister's Office, Government of India","source_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-critical-mineral-mission-to-build-a-resilient-value-chain-for-critical-mineral-resources-vital-to-green-technologies-with-an-outlay-of-rs-34300-crore-over-seven-years","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-29","licence":"Reproduction free of charge with acknowledgement of the source (pmindia.gov.in copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Read on the Prime Minister's Office site rather than pib.gov.in. The amount is the government expenditure; the headline's larger outlay adds the expected investment by public-sector undertakings. The stockpile is a proposal within the mission."}},"amount":163000000000,"currency":"INR","more":[{"fact":"assets abroad and a stockpile","statement":{"publisher":"Prime Minister's Office, Government of India","quote":"It also proposes development of stockpile of critical minerals within the country.","provenance":{"source_id":"Prime Minister's Office, Government of India","source_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-critical-mineral-mission-to-build-a-resilient-value-chain-for-critical-mineral-resources-vital-to-green-technologies-with-an-outlay-of-rs-34300-crore-over-seven-years","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-01-29","licence":"Reproduction free of charge with acknowledgement of the source (pmindia.gov.in copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-eo-14241-mineral-production-2025","date":"2025-03-20","date_is":"signature","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":["copper"],"type":"finance","instrument":"loan_programme","scope_as_printed":"a critical mineral, as defined by 30 U.S.C. 1606(a)(3), as well as uranium, copper, potash, gold","summary":"Executive Order 14241 delegates Defense Production Act loan authority for domestic mineral production to the development finance corporation and orders a plan for a dedicated mineral production fund.","status":"in_force","primary_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","provenance":{"source_id":"Federal Register (Executive Office of the President)","source_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Federal Register (Executive Office of the President)","quote":"establish a dedicated mineral and mineral production fund for domestic investments executed by the DFC","provenance":{"source_id":"Federal Register (Executive Office of the President)","source_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"limit of the delegated loan authority","statement":{"publisher":"Federal Register (Executive Office of the President)","quote":"The loan authority delegated by this order is limited to loans that create, maintain, protect, expand, or restore domestic mineral production","provenance":{"source_id":"Federal Register (Executive Office of the President)","source_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"Export-Import Bank guidance on offtake financing","statement":{"publisher":"Federal Register (Executive Office of the President)","quote":"to secure United States offtake of global raw mineral feedstock for domestic minerals processing","provenance":{"source_id":"Federal Register (Executive Office of the President)","source_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"minerals covered (definition)","statement":{"publisher":"Federal Register (Executive Office of the President)","quote":"means a critical mineral, as defined by 30 U.S.C. 1606(a)(3), as well as uranium, copper, potash, gold","provenance":{"source_id":"Federal Register (Executive Office of the President)","source_url":"https://www.federalregister.gov/documents/full_text/text/2025/03/25/2025-05212.txt","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-20","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-crma-strategic-projects-2025","date":"2025-03-25","date_is":"announcement","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":["lithium","nickel","cobalt","manganese","graphite","magnesium","tungsten"],"type":"finance","instrument":"other","scope_as_printed":"47 Strategic Projects to boost domestic strategic raw material capacities (extraction, processing, recycling, substitution)","summary":"The Commission adopted the first list of Strategic Projects under the Critical Raw Materials Act; the status brings coordinated support on access to finance and offtakers, and capped permitting times.","status":"in_force","primary_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","provenance":{"source_id":"European Commission (press release IP/25/864)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"European Commission (press release IP/25/864)","quote":"The Commission has adopted, for the first time, a list of 47 Strategic Projects to boost domestic strategic raw material capacities","provenance":{"source_id":"European Commission (press release IP/25/864)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"expected capital investment of the 47 projects (the projects' own cost, not public money)","statement":{"publisher":"European Commission (press release IP/25/864)","quote":"the 47 Strategic Projects have an expected overall capital investment of €22.5 billion","provenance":{"source_id":"European Commission (press release IP/25/864)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"what the status brings","statement":{"publisher":"European Commission (press release IP/25/864)","quote":"coordinated support by the Commission, Member States and financial institutions to become operational, notably regarding access to finance and support to connect with relevant off-takers","provenance":{"source_id":"European Commission (press release IP/25/864)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"permitting time limits","statement":{"publisher":"European Commission (press release IP/25/864)","quote":"the permit-granting process will not exceed 27 months for extraction projects and 15 months for other projects","provenance":{"source_id":"European Commission (press release IP/25/864)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/864&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-03-25","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-fast41-critical-mineral-transparency-projects-2025","date":"2025-04-18","date_is":"announcement","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":[],"type":"finance","instrument":"other","scope_as_printed":"critical mineral production projects (transparency projects on the Federal Permitting Dashboard)","summary":"The Federal Permitting Improvement Steering Council began listing critical mineral production projects as FAST-41 transparency projects, which publishes their federal review and permitting schedules; this is a permitting status and carries no money.","status":"in_force","primary_url":"https://www.permitting.gov/newsroom/press-releases/trump-administration-advances-first-wave-critical-mineral-production","provenance":{"source_id":"Federal Permitting Improvement Steering Council (Permitting Council)","source_url":"https://www.permitting.gov/newsroom/press-releases/trump-administration-advances-first-wave-critical-mineral-production","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-04-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Federal Permitting Improvement Steering Council (Permitting Council)","quote":"Inclusion on the Permitting Dashboard as a transparency project makes the environmental review and authorizations schedule for these vital mineral production projects publicly available","provenance":{"source_id":"Federal Permitting Improvement Steering Council (Permitting Council)","source_url":"https://www.permitting.gov/newsroom/press-releases/trump-administration-advances-first-wave-critical-mineral-production","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-04-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"basis in the executive order on mineral production","statement":{"publisher":"Federal Permitting Improvement Steering Council (Permitting Council)","quote":"in response to President Trump’s Executive Order, Immediate Measures to Increase American Mineral Production","provenance":{"source_id":"Federal Permitting Improvement Steering Council (Permitting Council)","source_url":"https://www.permitting.gov/newsroom/press-releases/trump-administration-advances-first-wave-critical-mineral-production","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-04-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"number of projects by November 20, 2025","statement":{"publisher":"Federal Permitting Improvement Steering Council (Permitting Council)","quote":"50 critical mineral and mining projects are now receiving the benefits of FAST-41 traditional and transparency coverage","provenance":{"source_id":"Federal Permitting Improvement Steering Council (Permitting Council)","source_url":"https://www.permitting.gov/newsroom/press-releases/permitting-council-meets-agency-milestone-50-mining-infrastructure-projects","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-04-18","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-crma-strategic-projects-third-countries-2025","date":"2025-06-04","date_is":"announcement","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":["lithium","nickel","cobalt","manganese","graphite","rare-earths","copper","tungsten"],"type":"finance","instrument":"other","scope_as_printed":"13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories","summary":"The Commission adopted the first list of Strategic Projects in third countries under the Critical Raw Materials Act; the status brings coordinated support on access to finance and contacts with offtakers.","status":"in_force","primary_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","provenance":{"source_id":"European Commission (press release IP/25/1419)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"European Commission (press release IP/25/1419)","quote":"The Commission adopted the first list of 13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories.","provenance":{"source_id":"European Commission (press release IP/25/1419)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"capital investment the 13 projects need (the projects' own cost, not public money)","statement":{"publisher":"European Commission (press release IP/25/1419)","quote":"It is estimated that the 13 Strategic Projects outside of the EU need an overall capital investment of €5.5 billion to start operations.","provenance":{"source_id":"European Commission (press release IP/25/1419)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"what the status brings","statement":{"publisher":"European Commission (press release IP/25/1419)","quote":"coordinated support by the Commission, Member States and financial institutions in the form of facilitating access to finance and contacts with relevant off-takers","provenance":{"source_id":"European Commission (press release IP/25/1419)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"where the projects are","statement":{"publisher":"European Commission (press release IP/25/1419)","quote":"seven are located in Canada, Greenland, Kazakhstan, Norway, Serbia, Ukraine, Zambia, with whom the EU has a strategic partnership on raw materials value chains","provenance":{"source_id":"European Commission (press release IP/25/1419)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/1419&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-04","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"g7-critical-minerals-action-plan-2025","date":"2025-06-17","date_is":"announcement","jurisdiction":"G7","jurisdictions_iso3":[],"materials":[],"type":"finance","instrument":"other","scope_as_printed":"critical minerals","summary":"G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.","status":"announced","primary_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","provenance":{"source_id":"Prime Minister of Canada (G7 Presidency 2025)","source_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Prime Minister of Canada (G7 Presidency 2025)","quote":"We will develop a roadmap to promote standards-based markets for critical minerals","provenance":{"source_id":"Prime Minister of Canada (G7 Presidency 2025)","source_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"launch of the plan","statement":{"publisher":"Prime Minister of Canada (G7 Presidency 2025)","quote":"We are launching a G7 Critical Minerals Action Plan","provenance":{"source_id":"Prime Minister of Canada (G7 Presidency 2025)","source_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"roadmap content","statement":{"publisher":"Prime Minister of Canada (G7 Presidency 2025)","quote":"The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets","provenance":{"source_id":"Prime Minister of Canada (G7 Presidency 2025)","source_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"capital mobilisation","statement":{"publisher":"Prime Minister of Canada (G7 Presidency 2025)","quote":"We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration","provenance":{"source_id":"Prime Minister of Canada (G7 Presidency 2025)","source_url":"https://www.pm.gc.ca/en/news/statements/2025/06/17/g7-critical-minerals-action-plan","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-06-17","licence":"Reproduction permitted with attribution (pm.gc.ca important notices)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-dod-mp-materials-price-floor-2025","date":"2025-07-01","date_is":"announcement","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":["rare-earths"],"type":"finance","instrument":"price_floor","scope_as_printed":"per kilogram of Nd-Pr","summary":"In a public-private partnership with MP Materials, the Department of Defense committed to a price floor for neodymium-praseodymium, with direct payments to the company when prices fall below it.","status":"announced","primary_url":"https://www.congress.gov/crs_external_products/IF/HTML/IF13171.html","provenance":{"source_id":"Congressional Research Service (In Focus IF13171, updated June 12, 2026)","source_url":"https://www.congress.gov/crs_external_products/IF/HTML/IF13171.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07","licence":"Not subject to copyright (CRS product, a work of the United States Government)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The source gives the month only (July 2025) and is a Congressional Research Service summary updated on June 12, 2026, not the Department's own release: war.gov refused automated reading, and the company's release is not used because its site terms forbid reuse."},"statement":{"publisher":"Congressional Research Service (In Focus IF13171, updated June 12, 2026)","quote":"commit to an REE price floor, offering direct payments to MP Materials if prices fall below $110 per kilogram of Nd-Pr","provenance":{"source_id":"Congressional Research Service (In Focus IF13171, updated June 12, 2026)","source_url":"https://www.congress.gov/crs_external_products/IF/HTML/IF13171.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-07","licence":"Not subject to copyright (CRS product, a work of the United States Government)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The source gives the month only (July 2025) and is a Congressional Research Service summary updated on June 12, 2026, not the Department's own release: war.gov refused automated reading, and the company's release is not used because its site terms forbid reuse."}},"date_precision":"month"},{"id":"us-doe-critical-minerals-funding-notices-2025","date":"2025-08-13","date_is":"announcement","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":["rare-earths","gallium","germanium","lithium","graphite","nickel","copper","aluminium"],"type":"finance","instrument":"fund","scope_as_printed":"mining, processing, and manufacturing technologies across key stages of the critical minerals and materials supply chains","summary":"The Department of Energy announced its intent to issue several funding notices for critical minerals and materials, covering rare-earth supply chains, battery-material processing and recycling, by-product recovery at industrial facilities, and gallium and germanium refining.","status":"announced","primary_url":"https://www.energy.gov/articles/energy-department-announces-actions-secure-american-critical-minerals-and-materials-supply","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-announces-actions-secure-american-critical-minerals-and-materials-supply","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-08-13","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"'Nearly $1 billion' is the publisher's rounded total of the planned notices; the amount field holds that round figure."},"statement":{"publisher":"U.S. Department of Energy","quote":"today announced its intent to issue notices of funding opportunities totaling nearly $1 billion to advance and scale mining, processing, and manufacturing technologies","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-announces-actions-secure-american-critical-minerals-and-materials-supply","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-08-13","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"'Nearly $1 billion' is the publisher's rounded total of the planned notices; the amount field holds that round figure."}},"amount":1000000000,"currency":"USD","amount_as_printed":"notices of funding opportunities totaling nearly $1 billion","more":[{"fact":"largest notice: processing, battery manufacturing and recycling","statement":{"publisher":"U.S. Department of Energy","quote":"MESC is announcing its intent to issue a NOFO of up to $500 million to expand U.S. critical mineral and materials processing and derivative battery manufacturing and recycling","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-announces-actions-secure-american-critical-minerals-and-materials-supply","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-08-13","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"rare earth notice","statement":{"publisher":"U.S. Department of Energy","quote":"its intent to issue a NOFO of up to $135 million to enhance domestic supply chains for rare earth elements (REEs)","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/articles/energy-department-announces-actions-secure-american-critical-minerals-and-materials-supply","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-08-13","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"a later notice issued under this announcement (by-product recovery, announced November 14, 2025)","statement":{"publisher":"U.S. Department of Energy","quote":"DOE expects to award up to $275 million in federal funding with a minimum of 20% cost-sharing from the awardees.","provenance":{"source_id":"U.S. Department of Energy","source_url":"https://www.energy.gov/cmei/mining/funding-notice-mines-metals-capacity-expansion-piloting-product-critical-minerals-and","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-08-13","licence":"Public domain (U.S. Department of Energy website)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-aus-critical-minerals-framework-2025","date":"2025-10-20","date_is":"signature","jurisdiction":"United States and Australia","jurisdictions_iso3":["USA","AUS"],"materials":["rare-earths"],"type":"finance","instrument":"fund","scope_as_printed":"critical minerals and rare earths","summary":"Bilateral, non-binding framework in which both governments commit financing for critical minerals and rare earths projects and name price floors as a possible pricing tool.","status":"announced","primary_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-australia-framework-for-securing-of-supply-in-the-mining-and-processing-of-critical-minerals-and-rare-earths","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-australia-framework-for-securing-of-supply-in-the-mining-and-processing-of-critical-minerals-and-rare-earths","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-20","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"The White House","quote":"the Participants are taking measures to provide at least $1 billion in financing to projects located in each of the United States and Australia","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-australia-framework-for-securing-of-supply-in-the-mining-and-processing-of-critical-minerals-and-rare-earths","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-20","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":1000000000,"currency":"USD","amount_as_printed":"at least $1 billion in financing to projects located in each of the United States and Australia","more":[{"fact":"price floors named","statement":{"publisher":"The White House","quote":"within a pricing framework including price floors or similar measures","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-australia-framework-for-securing-of-supply-in-the-mining-and-processing-of-critical-minerals-and-rare-earths","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-20","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"non-binding character","statement":{"publisher":"The White House","quote":"does not constitute or create any legally binding or enforceable obligations, express or implied","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-australia-framework-for-securing-of-supply-in-the-mining-and-processing-of-critical-minerals-and-rare-earths","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-20","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-dfc-orion-critical-mineral-consortium-2025","date":"2025-10-23","date_is":"announcement","jurisdiction":"United States (with ADQ of Abu Dhabi as a matching investor)","jurisdictions_iso3":["USA","ARE"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"strategic critical minerals projects in DFC-eligible markets","summary":"The U.S. development finance agency DFC committed an investment to the Orion Critical Mineral Consortium, an investment vehicle led by Orion Resource Partners and matched by Orion funds and the Abu Dhabi sovereign investor ADQ.","status":"announced","primary_url":"https://www.dfc.gov/media/press-releases/dfc-joins-18-billion-consortium-secure-critical-mineral-supply-chains-and","provenance":{"source_id":"U.S. International Development Finance Corporation (DFC)","source_url":"https://www.dfc.gov/media/press-releases/dfc-joins-18-billion-consortium-secure-critical-mineral-supply-chains-and","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The release names no single mineral and no country. The total is the consortium's size, of which DFC's share is one part; the Public Information Summary is undated, so the increase is not given a date here."},"statement":{"publisher":"U.S. International Development Finance Corporation (DFC)","quote":"brings the current size of the consortium to $1.8 billion","provenance":{"source_id":"U.S. International Development Finance Corporation (DFC)","source_url":"https://www.dfc.gov/media/press-releases/dfc-joins-18-billion-consortium-secure-critical-mineral-supply-chains-and","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The release names no single mineral and no country. The total is the consortium's size, of which DFC's share is one part; the Public Information Summary is undated, so the increase is not given a date here."}},"amount":1800000000,"currency":"USD","amount_as_printed":"brings the current size of the consortium to $1.8 billion","more":[{"fact":"purpose of the consortium","statement":{"publisher":"U.S. International Development Finance Corporation (DFC)","quote":"has created Orion Critical Mineral Consortium (Orion CMC) to invest in strategic critical minerals projects in DFC-eligible markets","provenance":{"source_id":"U.S. International Development Finance Corporation (DFC)","source_url":"https://www.dfc.gov/media/press-releases/dfc-joins-18-billion-consortium-secure-critical-mineral-supply-chains-and","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"who matched the commitment","statement":{"publisher":"U.S. International Development Finance Corporation (DFC)","quote":"This commitment, which has been matched by both funds managed by Orion Resource Partners and ADQ, an active sovereign investor","provenance":{"source_id":"U.S. International Development Finance Corporation (DFC)","source_url":"https://www.dfc.gov/media/press-releases/dfc-joins-18-billion-consortium-secure-critical-mineral-supply-chains-and","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"DFC's own share, from its undated Public Information Summary for the board: a further $900 million on top of $600 million","statement":{"publisher":"U.S. International Development Finance Corporation (DFC)","quote":"$900 million in addition to the $600 million already approved","provenance":{"source_id":"U.S. International Development Finance Corporation (DFC)","source_url":"https://www.dfc.gov/sites/default/files/media/documents/Board%20PIS%20-%20CMC_508.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-23","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-jpn-critical-minerals-framework-2025","date":"2025-10-28","date_is":"signature","jurisdiction":"United States and Japan","jurisdictions_iso3":["USA","JPN"],"materials":["rare-earths"],"type":"finance","instrument":"other","scope_as_printed":"critical minerals and rare earths","summary":"Bilateral, non-binding framework on financial support, pricing measures and a possible complementary stockpiling arrangement for critical minerals and rare earths.","status":"announced","primary_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-japan-framework-for-securing-the-supply-of-critical-minerals-and-rare-earths-through-mining-and-processing/","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-japan-framework-for-securing-the-supply-of-critical-minerals-and-rare-earths-through-mining-and-processing/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-28","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"The White House","quote":"The Participants intend to work together to consider a mutually complementary stockpiling arrangement, utilizing existing national systems","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-japan-framework-for-securing-the-supply-of-critical-minerals-and-rare-earths-through-mining-and-processing/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-28","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"pricing measures","statement":{"publisher":"The White House","quote":"pricing measures to support alternative projects and such high-standard markets","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-japan-framework-for-securing-the-supply-of-critical-minerals-and-rare-earths-through-mining-and-processing/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-28","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"financial support within six months","statement":{"publisher":"The White House","quote":"the Participants intend to take measures to provide financial support to selected projects","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/briefings-statements/2025/10/united-states-japan-framework-for-securing-the-supply-of-critical-minerals-and-rare-earths-through-mining-and-processing/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-28","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"kor-critical-minerals-energy-supply-chain-fund-2025","date":"2025-10-31","date_is":"announcement","jurisdiction":"South Korea","jurisdictions_iso3":["KOR"],"materials":["rare-earths"],"type":"finance","instrument":"fund","scope_as_printed":"Critical Minerals and Energy Supply Chain Stabilization Fund; measures to stabilize rare earth supply chains","summary":"Korea's Supply Chain Stabilization Committee said the government will set up a Critical Minerals and Energy Supply Chain Stabilization Fund within the Supply Chain Stabilization Fund, and will increase public stockpiling of rare earths.","status":"announced","primary_url":"https://english.motir.go.kr/eng/article/EATCLdfa319ada/2382/view","provenance":{"source_id":"Ministry of Trade, Industry and Resources, Republic of Korea","source_url":"https://english.motir.go.kr/eng/article/EATCLdfa319ada/2382/view","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The Ministry of Economy and Finance address answers from english.mofe.go.kr. Only rare earths are named as a material; the fund itself is for critical minerals and energy in general."},"statement":{"publisher":"Ministry of Trade, Industry and Resources, Republic of Korea","quote":"the government will establish a KRW 250 billion Critical Minerals and Energy Supply Chain Stabilization Fund to boost direct and indirect investments","provenance":{"source_id":"Ministry of Trade, Industry and Resources, Republic of Korea","source_url":"https://english.motir.go.kr/eng/article/EATCLdfa319ada/2382/view","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The Ministry of Economy and Finance address answers from english.mofe.go.kr. Only rare earths are named as a material; the fund itself is for critical minerals and energy in general."}},"amount":250000000000,"currency":"KRW","more":[{"fact":"rare earths, investment in overseas resource development, recycling and public stockpiling","statement":{"publisher":"Ministry of Trade, Industry and Resources, Republic of Korea","quote":"promote technologies that reduce reliance on rare earth materials and the recycling of rare earth permanent magnets, and increase public stockpiling","provenance":{"source_id":"Ministry of Trade, Industry and Resources, Republic of Korea","source_url":"https://english.motir.go.kr/eng/article/EATCLdfa319ada/2382/view","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"recycling target for strategic critical minerals","statement":{"publisher":"Ministry of Trade, Industry and Resources, Republic of Korea","quote":"Aiming to achieve a 20 percent recycling rate for ten strategic critical minerals by 2030","provenance":{"source_id":"Ministry of Trade, Industry and Resources, Republic of Korea","source_url":"https://english.motir.go.kr/eng/article/EATCLdfa319ada/2382/view","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-10-31","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"can-clean-technology-manufacturing-itc-minerals-expansion-2025","date":"2025-11-04","date_is":"publication","jurisdiction":"Canada","jurisdictions_iso3":["CAN"],"materials":["antimony","gallium","germanium"],"type":"finance","instrument":"other","scope_as_printed":"list of critical minerals eligible for the Clean Technology Manufacturing investment tax credit, to include antimony, indium, gallium, germanium, and scandium","summary":"Budget 2025 proposes to add antimony, indium, gallium, germanium and scandium to the critical minerals whose extraction, processing and recycling equipment qualifies for the refundable Clean Technology Manufacturing investment tax credit.","status":"announced","primary_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A budget proposal on its date, hence 'announced'; whether it has been legislated since was not read. The page prints only its 'Date modified', used as publication date. `materials` lists the newly added minerals that are in the atlas."},"statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"Budget 2025 proposes to expand the list of critical minerals eligible for the Clean Technology Manufacturing investment tax credit to include antimony, indium, gallium, germanium, and scandium.","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A budget proposal on its date, hence 'announced'; whether it has been legislated since was not read. The page prints only its 'Date modified', used as publication date. `materials` lists the newly added minerals that are in the atlas."}},"more":[{"fact":"what the credit is","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"is a refundable tax credit equal to 30 per cent of the cost of investments in new machinery and equipment used to manufacture or process key clean technologies","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"minerals already covered before the proposal","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"or to extract, process, or recycle critical minerals essential for clean technology supply chains (i.e., lithium, cobalt, nickel, graphite, copper, and rare earth elements)","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"purpose given in the budget chapter","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"in order to support investments in the extraction, processing, and recycling of co-product and by-product critical minerals","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"can-critical-mineral-exploration-tax-credit-expansion-2025","date":"2025-11-04","date_is":"publication","jurisdiction":"Canada","jurisdictions_iso3":["CAN"],"materials":["chromium","germanium","manganese","molybdenum","niobium","tantalum","tin","tungsten"],"type":"finance","instrument":"other","scope_as_printed":"additional critical minerals: bismuth, cesium, chromium, fluorspar, germanium, indium, manganese, molybdenum, niobium, tantalum, tin, and tungsten","summary":"Budget 2025 proposes to widen the Critical Mineral Exploration Tax Credit, a tax credit for investors in flow-through shares of exploration companies, to twelve more critical minerals for agreements made until the end of March 2027.","status":"announced","primary_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A budget proposal on its date, hence 'announced'; whether it has been legislated since was not read. The page prints only its 'Date modified', used as publication date. `materials` lists the newly added minerals that are in the atlas; the minerals already eligible are in the last quote."},"statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"Budget 2025 proposes to expand the eligibility of the CMETC to include the following additional critical minerals: bismuth, cesium, chromium, fluorspar, germanium, indium, manganese, molybdenum, niobium, tantalum, tin, and tungsten.","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A budget proposal on its date, hence 'announced'; whether it has been legislated since was not read. The page prints only its 'Date modified', used as publication date. `materials` lists the newly added minerals that are in the atlas; the minerals already eligible are in the last quote."}},"more":[{"fact":"what the credit is","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"The CMETC is equal to 30 per cent of specified mineral exploration expenses incurred in Canada and renounced to flow-through share investors.","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"period of the measure","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"This measure would apply to expenditures renounced under eligible flow-through share agreements entered into after Budget Day and on or before March 31, 2027.","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"minerals already eligible before the proposal","statement":{"publisher":"Department of Finance Canada (Budget 2025, Tax Measures)","quote":"nickel, cobalt, graphite, copper, rare earth elements, vanadium, tellurium, gallium, scandium, titanium, magnesium, zinc, platinum group metals, uranium, and lithium (including lithium from brines)","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Tax Measures)","source_url":"https://budget.canada.ca/2025/report-rapport/tm-mf-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"can-critical-minerals-sovereign-fund-2025","date":"2025-11-04","date_is":"publication","jurisdiction":"Canada","jurisdictions_iso3":["CAN"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"critical minerals projects and companies","summary":"Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.","status":"announced","primary_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Chapter 1)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The chapter page prints only its 'Date modified'; that date is used as publication date. The source prints '$' without a currency code; CAD is inferred from the publisher (Government of Canada budget)."},"statement":{"publisher":"Department of Finance Canada (Budget 2025, Chapter 1)","quote":"provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Chapter 1)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The chapter page prints only its 'Date modified'; that date is used as publication date. The source prints '$' without a currency code; CAD is inferred from the publisher (Government of Canada budget)."}},"amount":2000000000,"currency":"CAD","amount_as_printed":"$2 billion over five years, on a cash basis, starting in 2026-27","more":[{"fact":"tools of the fund","statement":{"publisher":"Department of Finance Canada (Budget 2025, Chapter 1)","quote":"including equity investments, loan guarantees, and offtake agreements","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Chapter 1)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"First and Last Mile Fund","statement":{"publisher":"Department of Finance Canada (Budget 2025, Chapter 1)","quote":"provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Chapter 1)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"absorbs the Critical Minerals Infrastructure Fund","statement":{"publisher":"Department of Finance Canada (Budget 2025, Chapter 1)","quote":"would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30","provenance":{"source_id":"Department of Finance Canada (Budget 2025, Chapter 1)","source_url":"https://budget.canada.ca/2025/report-rapport/chap1-en.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-04","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-raw-materials-mechanism-2025","date":"2025-11-18","date_is":"announcement","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":[],"type":"finance","instrument":"joint_purchasing","scope_as_printed":"buyers and sellers of strategic raw materials (Raw Materials Mechanism under the EU Energy and Raw Materials Platform)","summary":"The Commission opened registrations for the Raw Materials Mechanism, which links buyers and sellers of strategic raw materials and enables demand aggregation, joint purchasing and investment consortia.","status":"in_force","primary_url":"https://single-market-economy.ec.europa.eu/news/registration-opens-raw-materials-mechanism-under-eu-energy-and-raw-materials-platform-2025-11-18_en","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/news/registration-opens-raw-materials-mechanism-under-eu-energy-and-raw-materials-platform-2025-11-18_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-18","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"the European Commission opened registrations for the new Raw Materials Mechanism under the EU Energy and Raw Materials Platform","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/news/registration-opens-raw-materials-mechanism-under-eu-energy-and-raw-materials-platform-2025-11-18_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-18","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"what the mechanism enables","statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"enable cooperation between companies, such as demand aggregation, joint purchasing, and investment consortia","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/news/registration-opens-raw-materials-mechanism-under-eu-energy-and-raw-materials-platform-2025-11-18_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-18","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"first matchmaking round","statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"The first matchmaking round will launch in Q1 2026.","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/news/registration-opens-raw-materials-mechanism-under-eu-energy-and-raw-materials-platform-2025-11-18_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-18","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"later result (press release of 9 October 2026)","statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"the Raw Materials Mechanism, established to aggregate demand and supply and identify potential offtakers, has generated more than 30 matches for 10 materials","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-18","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"gbr-critical-minerals-strategy-fund-2025","date":"2025-11-22","date_is":"publication","jurisdiction":"United Kingdom","jurisdictions_iso3":["GBR"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"critical mineral projects in the UK","summary":"The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.","status":"announced","primary_url":"https://www.gov.uk/government/publications/uk-critical-minerals-strategy/vision-2035-critical-minerals-strategy","provenance":{"source_id":"Department for Business and Trade (GOV.UK)","source_url":"https://www.gov.uk/government/publications/uk-critical-minerals-strategy/vision-2035-critical-minerals-strategy","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-22","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Department for Business and Trade (GOV.UK)","quote":"funding of up to £50 million will be made available by DBT to support critical mineral projects","provenance":{"source_id":"Department for Business and Trade (GOV.UK)","source_url":"https://www.gov.uk/government/publications/uk-critical-minerals-strategy/vision-2035-critical-minerals-strategy","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-22","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":50000000,"currency":"GBP","amount_as_printed":"up to £50 million","more":[{"fact":"stockpiling under consideration","statement":{"publisher":"Department for Business and Trade (GOV.UK)","quote":"Measures could include stockpiling, including through procurement mechanisms","provenance":{"source_id":"Department for Business and Trade (GOV.UK)","source_url":"https://www.gov.uk/government/publications/uk-critical-minerals-strategy/vision-2035-critical-minerals-strategy","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-22","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"later programme page (published 22 June 2026): grant share","statement":{"publisher":"Department for Business and Trade (GOV.UK)","quote":"with £45 million of this available as grant funding","provenance":{"source_id":"Department for Business and Trade (GOV.UK)","source_url":"https://www.gov.uk/government/collections/funding-for-uk-critical-minerals-projects","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-22","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"gbr-ukef-critical-goods-edg-2025","date":"2025-11-24","date_is":"publication","jurisdiction":"United Kingdom","jurisdictions_iso3":["GBR"],"materials":[],"type":"finance","instrument":"loan_programme","scope_as_printed":"UK-based businesses that supply critical mineral products to UK exporters (minerals of the UK Criticality Assessment 2024 and growth minerals)","summary":"UK Export Finance opened the Critical Goods Export Development Guarantee, a partial state guarantee on commercial loans to UK-based suppliers of critical mineral products, alongside its existing Critical Minerals Supply Finance.","status":"in_force","primary_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","provenance":{"source_id":"UK Export Finance (GOV.UK)","source_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The page prints 'Published 24 November 2025' on separate lines; no ceiling of the programme is printed."},"statement":{"publisher":"UK Export Finance (GOV.UK)","quote":"The Critical Goods Export Development Guarantee (Critical Goods EDG) is now available for UK-based businesses that supply critical mineral products to UK exporters.","provenance":{"source_id":"UK Export Finance (GOV.UK)","source_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The page prints 'Published 24 November 2025' on separate lines; no ceiling of the programme is printed."}},"more":[{"fact":"share guaranteed (the page's worked example)","statement":{"publisher":"UK Export Finance (GOV.UK)","quote":"UKEF provides an 80% guarantee, reducing the lender’s risk and enabling them to provide the loan to the UK manufacturer","provenance":{"source_id":"UK Export Finance (GOV.UK)","source_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"existing product for overseas suppliers","statement":{"publisher":"UK Export Finance (GOV.UK)","quote":"UKEF’s existing Critical Minerals Supply Finance, which provides finance for overseas companies that have agreements in place to supply critical minerals products to UK exporters","provenance":{"source_id":"UK Export Finance (GOV.UK)","source_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"minerals covered","statement":{"publisher":"UK Export Finance (GOV.UK)","quote":"minerals listed in the UK Criticality Assessment 2024 as well as growth minerals such as beryllium, chromium, copper and uranium","provenance":{"source_id":"UK Export Finance (GOV.UK)","source_url":"https://www.gov.uk/government/news/new-government-guarantee-to-strengthen-uk-critical-minerals-supply-chains","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-11-24","licence":"Open Government Licence v3.0","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-resourceeu-action-plan-2025","date":"2025-12-03","date_is":"announcement","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":["rare-earths","cobalt","lithium"],"type":"finance","instrument":"fund","scope_as_printed":"critical raw materials, such as rare earth elements, cobalt or lithium","summary":"The Commission adopted the RESourceEU Action Plan: project financing, a European Critical Raw Materials Centre, joint purchasing through the Raw Materials Platform and a stockpiling pilot.","status":"announced","primary_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"The EU will mobilise up to €3 billion over the next 12 months to support concrete projects","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":3000000000,"currency":"EUR","amount_as_printed":"up to €3 billion over the next 12 months","more":[{"fact":"adoption","statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"The European Commission has adopted today the RESourceEU Action Plan","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"European Critical Raw Materials Centre planned","statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"In early 2026, the Commission will set up a European Critical Raw Materials Centre","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"joint purchasing and offtake via the Raw Materials Platform","statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"the Raw Materials Platform will facilitate the efforts of the companies to aggregate demand, jointly purchase strategic raw materials and secure offtake agreements","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"stockpiling pilot","statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"with a pilot scheme set to become operational in early 2026","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"materials named","statement":{"publisher":"European Commission (press release IP/25/2891)","quote":"secure the EU's supply of critical raw materials, such as rare earth elements, cobalt or lithium","provenance":{"source_id":"European Commission (press release IP/25/2891)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/25/2891&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-03","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"chl-corfo-codelco-sqm-salar-de-atacama-2025","date":"2025-12-19","date_is":"announcement","jurisdiction":"Chile","jurisdictions_iso3":["CHL"],"materials":["lithium"],"type":"finance","instrument":"equity","scope_as_printed":"Contratos de Arrendamiento y Proyecto en el Salar de Atacama (Corfo, SQM Salar SpA, Codelco y su filial Minera Tarar SpA); Estrategia Nacional del Litio","summary":"Chile's Comptroller registered Corfo's lithium contracts for the Salar de Atacama, clearing the public-private partnership of state-owned Codelco with SQM, in which the State is to hold a majority strategic stake.","status":"announced","primary_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Status kept as announced: on the cited date the joint company had not yet been formed (Codelco: only the final legal and administrative steps of the merger remained) and the new Codelco contracts take effect from 2031."},"statement":{"publisher":"Ministerio de Economía, Fomento y Turismo de Chile","quote":"asociación público-privada entre Codelco y SQM, en la que el Estado tendrá una participación estratégica mayoritaria","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"Status kept as announced: on the cited date the joint company had not yet been formed (Codelco: only the final legal and administrative steps of the merger remained) and the new Codelco contracts take effect from 2031."}},"more":[{"fact":"term of the contracts","statement":{"publisher":"Ministerio de Economía, Fomento y Turismo de Chile","quote":"suscritos con Codelco y su filial Minera Tarar SpA, que tendrán efecto desde 2031 hasta 2060","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"frame: the National Lithium Strategy of April 2023","statement":{"publisher":"Ministerio de Economía, Fomento y Turismo de Chile","quote":"se enmarcan en la Estrategia Nacional del Litio (ENL), presentada por el Presidente Gabriel Boric en abril de 2023","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"preferential-price quota of lithium products for value-added producers chosen by Corfo","statement":{"publisher":"Ministerio de Economía, Fomento y Turismo de Chile","quote":"venta a precio preferente de una cuota de productos de litio a empresas que seleccione Corfo","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.economia.gob.cl/2025/12/19/contraloria-toma-razon-de-los-contratos-entre-corfo-sqm-y-codelco-que-permiten-dar-continuidad-a-operaciones-de-litio-en-el-salar-de-atacama.htm","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"what remained open on that date, as printed by Codelco","statement":{"publisher":"Ministerio de Economía, Fomento y Turismo de Chile","quote":"restando únicamente los pasos legales y administrativos finales para la materialización de la fusión de las filiales de Codelco y SQM que conformará la sociedad conjunta","provenance":{"source_id":"Ministerio de Economía, Fomento y Turismo de Chile","source_url":"https://www.codelco.com/contraloria-toma-razon-de-los-contratos-entre-corfo-y-filial-de-codelco","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2025-12-19","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"aus-critical-minerals-strategic-reserve-2026","date":"2026-01-12","date_is":"announcement","jurisdiction":"Australia","jurisdictions_iso3":["AUS"],"materials":["antimony","gallium","rare-earths"],"type":"finance","instrument":"stockpile","scope_as_printed":"antimony, gallium and rare earth elements","summary":"The Australian Government announced the design of its Critical Minerals Strategic Reserve, which secures rights to minerals produced in Australia and on-sells them, with some selective stockpiling.","status":"announced","primary_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The source prints '$' without a currency code; AUD is inferred from the publisher (Australian Government agency)."},"statement":{"publisher":"Export Finance Australia (Australian Government media release)","quote":"The first minerals to be the focus of the Strategic Reserve will be antimony, gallium and rare earth elements","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The source prints '$' without a currency code; AUD is inferred from the publisher (Australian Government agency)."}},"amount":1200000000,"currency":"AUD","amount_as_printed":"$1.2 billion","more":[{"fact":"size of the reserve","statement":{"publisher":"Export Finance Australia (Australian Government media release)","quote":"new details of its $1.2 billion Critical Minerals Strategic Reserve","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"how it operates","statement":{"publisher":"Export Finance Australia (Australian Government media release)","quote":"The Reserve will operate by securing rights to minerals produced in Australia and on-selling those rights to meet demand","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"transactions drawn from the Critical Minerals Facility","statement":{"publisher":"Export Finance Australia (Australian Government media release)","quote":"The Reserve includes $1 billion for transactions to be drawn from the expanded $5 billion Critical Minerals Facility","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"stockpiling share","statement":{"publisher":"Export Finance Australia (Australian Government media release)","quote":"A further $185 million has been allocated for selective stockpiling of minerals","provenance":{"source_id":"Export Finance Australia (Australian Government media release)","source_url":"https://exportfinance.gov.au/newsroom/delivering-australia-s-critical-minerals-supply/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-12","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"us-section-232-processed-critical-minerals-2026","date":"2026-01-14","date_is":"signature","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":[],"type":"finance","instrument":"price_floor","scope_as_printed":"processed critical minerals and their derivative products (PCMDPs)","summary":"Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.","status":"announced","primary_url":"https://www.whitehouse.gov/presidential-actions/2026/01/adjusting-imports-of-processed-critical-minerals-and-their-derivative-products-into-the-united-states/","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/presidential-actions/2026/01/adjusting-imports-of-processed-critical-minerals-and-their-derivative-products-into-the-united-states/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-14","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"The White House","quote":"the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures","provenance":{"source_id":"The White House","source_url":"https://www.whitehouse.gov/presidential-actions/2026/01/adjusting-imports-of-processed-critical-minerals-and-their-derivative-products-into-the-united-states/","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-01-14","licence":"Not copyright protected (U.S. Government material, whitehouse.gov copyright policy)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"id":"us-project-vault-2026","date":"2026-02-02","date_is":"announcement","jurisdiction":"United States","jurisdictions_iso3":["USA"],"materials":[],"type":"finance","instrument":"stockpile","scope_as_printed":"essential raw materials","summary":"The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.","status":"announced","primary_url":"https://www.exim.gov/news/project-vault","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/project-vault","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/project-vault","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":10000000000,"currency":"USD","amount_as_printed":"a Direct Loan of up to $10 billion","more":[{"fact":"what it establishes","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/project-vault","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"storage","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"that will store essential raw materials in facilities across the United States","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/project-vault","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"borrower structure","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/project-vault","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"later EXIM release of May 4, 2026 restating the loan","statement":{"publisher":"Export-Import Bank of the United States (EXIM)","quote":"The transaction includes a direct loan of up to $10 billion","provenance":{"source_id":"Export-Import Bank of the United States (EXIM)","source_url":"https://www.exim.gov/news/exim-announces-project-vault-deal-year-advancing-critical-minerals-security-and-industrial","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-02-02","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"fra-rare-earths-resilience-plan-2026","date":"2026-05-05","date_is":"announcement","jurisdiction":"France","jurisdictions_iso3":["FRA"],"materials":["rare-earths"],"type":"finance","instrument":"other","scope_as_printed":"plan national de résilience consacré aux terres rares et aux aimants permanents","summary":"France presented a national resilience plan for rare earths and permanent magnets, with state support for projects at Lacq, La Rochelle and Grenoble, a state-backed investment fund, project guarantees and a prolonged call for critical-metals projects.","status":"announced","primary_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"Licence Ouverte / Open Licence 2.0 (etalab-2.0), stated in the site footer","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The amount is the state support the release attributes to the existing projects at Lacq, La Rochelle and Grenoble, not a new budget line of the plan. The release is dated 6 May 2026 and says the plan was presented 'Ce mardi 5 mai 2026'."},"statement":{"publisher":"Direction générale des Entreprises (ministère de l’Économie, France)","quote":"des projets concrets émergent et montent en puissance, soutenus à hauteur de 180 millions d’euros par l’État, pour près de 600 millions d’euros d’investissements","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"Licence Ouverte / Open Licence 2.0 (etalab-2.0), stated in the site footer","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The amount is the state support the release attributes to the existing projects at Lacq, La Rochelle and Grenoble, not a new budget line of the plan. The release is dated 6 May 2026 and says the plan was presented 'Ce mardi 5 mai 2026'."}},"amount":180000000,"currency":"EUR","amount_as_printed":"soutenus à hauteur de 180 millions d’euros par l’État","more":[{"fact":"state-backed critical metals fund (InfraVia)","statement":{"publisher":"Direction générale des Entreprises (ministère de l’Économie, France)","quote":"La mobilisation du fonds InfraVia, soutenu par l’État, avec déjà deux premiers investissements réalisés dans Core Lithium en Australie et Carester à Lacq.","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"Licence Ouverte / Open Licence 2.0 (etalab-2.0), stated in the site footer","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"guarantee for strategic projects","statement":{"publisher":"Direction générale des Entreprises (ministère de l’Économie, France)","quote":"L’assouplissement de la garantie des projets stratégiques pour les projets d’extraction de terres rares, pour favoriser les approvisionnements des entreprises françaises.","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"Licence Ouverte / Open Licence 2.0 (etalab-2.0), stated in the site footer","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"France 2030 call for critical-metals projects prolonged","statement":{"publisher":"Direction générale des Entreprises (ministère de l’Économie, France)","quote":"La prolongation de l’appel à projets « métaux critiques » dans le cadre de France 2030, afin de soutenir une dizaine de nouveaux projets industriels d’ici 2027.","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://www.entreprises.gouv.fr/espace-presse/la-france-engage-la-reconquete-de-la-souverainete-industrielle-sur-les-terres-rares","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"Licence Ouverte / Open Licence 2.0 (etalab-2.0), stated in the site footer","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"the fund's investment in Carester (fund manager's release of 9 April 2026)","statement":{"publisher":"Direction générale des Entreprises (ministère de l’Économie, France)","quote":"Cet investissement minoritaire du fonds Métaux Critiques d’InfraVia serait réalisé aux côtés de USA Rare Earth","provenance":{"source_id":"Direction générale des Entreprises (ministère de l’Économie, France)","source_url":"https://infraviacapital.com/wp-content/uploads/2026/04/CP-InfraVia-Metaux-Critiques-Carester-090426.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-05","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"aus-strategic-reserve-arafura-offtake-2026","date":"2026-05-21","date_is":"announcement","jurisdiction":"Australia","jurisdictions_iso3":["AUS"],"materials":["rare-earths"],"type":"finance","instrument":"offtake","scope_as_printed":"500 tonnes of rare earths","summary":"Through the Critical Minerals Strategic Reserve the Australian Government gave a non-binding commitment to secure rare earths from the Nolans project of Arafura Rare Earths.","status":"announced","primary_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/strategic-reserve-supporting-arafura-final-investment","provenance":{"source_id":"Treasury Ministers, Australian Government (joint media release)","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/strategic-reserve-supporting-arafura-final-investment","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"Treasury Ministers, Australian Government (joint media release)","quote":"The Government has provided a non-binding commitment to secure 500 tonnes of rare earths from the project, through the Reserve","provenance":{"source_id":"Treasury Ministers, Australian Government (joint media release)","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/strategic-reserve-supporting-arafura-final-investment","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"funding committed to the reserve","statement":{"publisher":"Treasury Ministers, Australian Government (joint media release)","quote":"The Government has committed $1.2 billion to establish","provenance":{"source_id":"Treasury Ministers, Australian Government (joint media release)","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/strategic-reserve-supporting-arafura-final-investment","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"product","statement":{"publisher":"Treasury Ministers, Australian Government (joint media release)","quote":"The Nolans project will produce neodymium-praseodymium oxide, or NdPr","provenance":{"source_id":"Treasury Ministers, Australian Government (joint media release)","source_url":"https://ministers.treasury.gov.au/ministers/jim-chalmers-2022/media-releases/strategic-reserve-supporting-arafura-final-investment","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-05-21","licence":"CC BY 4.0 (Australian Treasury copyright notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"arg-rigi-large-investment-regime-2026","date":"2026-06-11","date_is":"publication","jurisdiction":"Argentina","jurisdictions_iso3":["ARG"],"materials":[],"type":"finance","instrument":"other","scope_as_printed":"Régimen de Incentivo para Grandes Inversiones (RIGI); sectores estratégicos como energía, petróleo y gas, minería, infraestructura y energías renovables","summary":"Argentina's large-investment incentive regime (RIGI), created by law 27.742, grants approved single-project vehicles tax, customs and foreign-exchange incentives; the Economy Ministry published an official register of approved and pending projects, mining among the sectors.","status":"in_force","primary_url":"https://www.argentina.gob.ar/noticias/el-ministerio-de-economia-lanzo-una-web-oficial-con-la-informacion-de-los-proyectos-del","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.argentina.gob.ar/noticias/el-ministerio-de-economia-lanzo-una-web-oficial-con-la-informacion-de-los-proyectos-del","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A general regime, not specific to minerals. The law itself (27.742, 2024) was not read: the official text page answered with an error; the date here is that of the ministry's notice, not of the regime's start."},"statement":{"publisher":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","quote":"El Ministerio de Economía puso a disposición del público una nueva página web con la información oficial y actualizada sobre el Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.argentina.gob.ar/noticias/el-ministerio-de-economia-lanzo-una-web-oficial-con-la-informacion-de-los-proyectos-del","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"A general regime, not specific to minerals. The law itself (27.742, 2024) was not read: the official text page answered with an error; the date here is that of the ministry's notice, not of the regime's start."}},"more":[{"fact":"projects approved by resolution on that date (all sectors)","statement":{"publisher":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","quote":"16 proyectos US$ 29.892 millones de inversión","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.argentina.gob.ar/noticias/el-ministerio-de-economia-lanzo-una-web-oficial-con-la-informacion-de-los-proyectos-del","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"legal basis, as recited in a mining approval (Resolución 801/2026)","statement":{"publisher":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","quote":"Que por la ley 27.742 se creó el Régimen de Incentivo para Grandes Inversiones (RIGI)","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"tax and customs incentives applied to an approved mining project (Resolución 801/2026)","statement":{"publisher":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","quote":"aplicación de los incentivos tributarios y aduaneros establecidos por el capítulo IV del título VII de la ley 27.742","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"foreign-exchange incentives applied to an approved mining project (Resolución 801/2026)","statement":{"publisher":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","quote":"los incentivos cambiarios previstos en el capítulo V del título VII de la ley 27.742","provenance":{"source_id":"Ministerio de Economía de la República Argentina (argentina.gob.ar)","source_url":"https://www.boletinoficial.gob.ar/pdf/aviso/primera/342483/20260528","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-06-11","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"deu-rohstofffonds-increase-2026","date":"2026-07-15","date_is":"announcement","jurisdiction":"Germany","jurisdictions_iso3":["DEU"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen","summary":"Germany's raw materials fund, through which KfW takes equity stakes in mining, processing and recycling companies on behalf of the federal government, is to be enlarged; the increase is subject to the budget procedure in parliament.","status":"announced","primary_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/Pressemitteilungen-Details_901185.html","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/Pressemitteilungen-Details_901185.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"KfW","quote":"Es ist beabsichtigt, die Mittel für Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen auf insgesamt 1,5 Milliarden Euro aufzustocken.","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/Pressemitteilungen-Details_901185.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"amount":1500000000,"currency":"EUR","amount_as_printed":"auf insgesamt 1,5 Milliarden Euro","more":[{"fact":"the increase is not yet legislated","statement":{"publisher":"KfW","quote":"Die Aufstockung des Rohstofffonds ist Gegenstand des anstehenden parlamentarischen Haushaltsverfahrens.","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/Pressemitteilungen-Details_901185.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"the two investments made so far","statement":{"publisher":"KfW","quote":"150 Millionen Euro Eigenkapital für die klimaneutrale Lithiumförderung von Vulcan Energy Resources sowie 50 Millionen Euro für ein Projekt zur Förderung von Seltenen Erden des Unternehmens Arafura Rare Earths","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/Pressemitteilungen-Details_901185.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"original mandate of the fund (undated KfW factsheet)","statement":{"publisher":"KfW","quote":"beauftragt, bis zu 1 Mrd. EUR in das Eigenkapital von Bergbau-, Verarbeitungs- und Recyclingunternehmen zu investieren","provenance":{"source_id":"KfW","source_url":"https://kfw.de/PDF/Download-Center/Konzernthemen/Rohstofffonds/KfW_Factsheet-Rohstofffonds_DE.pdf","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"who decides (KfW notice of 1 April 2026 on the second investment)","statement":{"publisher":"KfW","quote":"Die Entscheidung, ob in ein Projekt investiert wird, trifft indes der Bund.","provenance":{"source_id":"KfW","source_url":"https://www.kfw.de/%C3%9Cber-die-KfW/Newsroom/Aktuelles/News-Details_888512.html","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-15","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"ita-fondo-nazionale-made-in-italy-2026","date":"2026-07-22","date_is":"announcement","jurisdiction":"Italy","jurisdictions_iso3":["ITA"],"materials":[],"type":"finance","instrument":"fund","scope_as_printed":"filiere strategiche nazionali e sicurezza degli approvvigionamenti di materie prime critiche (dall’estrazione fino al riciclo e al riuso)","summary":"Italy's National Made in Italy Fund became operational with the appointment of its two managers; its companies arm takes equity stakes with particular attention to the whole value chain of critical raw materials.","status":"in_force","primary_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","provenance":{"source_id":"Ministero delle Imprese e del Made in Italy","source_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-22","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The fund serves national strategic supply chains in general; critical raw materials are its stated priority, not its only field."},"statement":{"publisher":"Ministero delle Imprese e del Made in Italy","quote":"il Fondo dispone di una dotazione complessiva di 900 milioni di euro per rafforzare le filiere strategiche nazionali e garantire la sicurezza degli approvvigionamenti di materie prime critiche","provenance":{"source_id":"Ministero delle Imprese e del Made in Italy","source_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-22","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The fund serves national strategic supply chains in general; critical raw materials are its stated priority, not its only field."}},"amount":900000000,"currency":"EUR","amount_as_printed":"dotazione complessiva di 900 milioni di euro","more":[{"fact":"the fund enters its operational phase","statement":{"publisher":"Ministero delle Imprese e del Made in Italy","quote":"il Fondo Nazionale del Made in Italy (FNMI) entra nella fase operativa","provenance":{"source_id":"Ministero delle Imprese e del Made in Italy","source_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-22","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"companies arm (equity)","statement":{"publisher":"Ministero delle Imprese e del Made in Italy","quote":"Il Fondo Imprese, con una dotazione di 600 milioni di euro, realizzerà invece investimenti diretti e indiretti, a condizioni di mercato, nel capitale delle imprese operanti nelle filiere strategiche.","provenance":{"source_id":"Ministero delle Imprese e del Made in Italy","source_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-22","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"critical raw materials value chain","statement":{"publisher":"Ministero delle Imprese e del Made in Italy","quote":"Particolare attenzione sarà riservata all’intera catena del valore delle materie prime critiche: dall’estrazione alla lavorazione e alla trasformazione, dall’approvvigionamento alla distribuzione, fino al riciclo e al riuso.","provenance":{"source_id":"Ministero delle Imprese e del Made in Italy","source_url":"https://www.mimit.gov.it/it/notizie-stampa/materie-prime-critiche-al-via-il-fondo-nazionale-del-made-in-italy-da-900-milioni","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-07-22","licence":"No reuse statement read on the publisher's site. A fact and a quotation of at most 30 words, attributed and linked; the text remains the publisher's","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-crm-stockpiling-pilot-call-2026","date":"2026-09-15","date_is":"publication","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":[],"type":"finance","instrument":"stockpile","scope_as_printed":"pilot stockpiling mechanism for critical raw materials","summary":"The Commission called for expressions of interest to select the entity that will design, set up and run a pilot stockpiling mechanism for critical raw materials.","status":"announced","primary_url":"https://single-market-economy.ec.europa.eu/calls-expression-interest/selection-implementing-entity-pilot-project-stockpiling-critical-raw-materials_en","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/calls-expression-interest/selection-implementing-entity-pilot-project-stockpiling-critical-raw-materials_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-15","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The page gives no date of its own; 15 September 2026 is the date printed beside the call document. The materials of the pilot are not named on the page."},"statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"The purpose of this call is to determine the entity that will be designated to carry out the stockpiling pilot project.","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/calls-expression-interest/selection-implementing-entity-pilot-project-stockpiling-critical-raw-materials_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-15","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record","note":"The page gives no date of its own; 15 September 2026 is the date printed beside the call document. The materials of the pilot are not named on the page."}},"more":[{"fact":"what the entity is to do","statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"supporting the design, set-up, procurement, storage, management, release and operational testing of a pilot stockpiling mechanism for critical raw materials","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/calls-expression-interest/selection-implementing-entity-pilot-project-stockpiling-critical-raw-materials_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-15","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"deadline","statement":{"publisher":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","quote":"Deadline for submitting applications 09/10/2026","provenance":{"source_id":"European Commission (Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs)","source_url":"https://single-market-economy.ec.europa.eu/calls-expression-interest/selection-implementing-entity-pilot-project-stockpiling-critical-raw-materials_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-09-15","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]},{"id":"eu-crma-strategic-projects-2026","date":"2026-10-09","date_is":"announcement","jurisdiction":"European Union","jurisdictions_iso3":["EUU"],"materials":["lithium","nickel","cobalt","manganese","graphite","magnesium","tungsten","rare-earths"],"type":"finance","instrument":"other","scope_as_printed":"46 new Strategic Projects across 16 Member States (extraction, processing, recycling), covering 15 of the 17 strategic raw materials","summary":"The Commission selected a second list of Strategic Projects in the EU under the Critical Raw Materials Act and reported on financing mobilised since the RESourceEU plan.","status":"in_force","primary_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","provenance":{"source_id":"European Commission (press release IP/26/2113)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"},"statement":{"publisher":"European Commission (press release IP/26/2113)","quote":"the European Commission today announced that it has selected 46 new Strategic Projects across 16 Member States","provenance":{"source_id":"European Commission (press release IP/26/2113)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}},"more":[{"fact":"financial support mobilised since RESourceEU","statement":{"publisher":"European Commission (press release IP/26/2113)","quote":"Team Europe has mobilised more than €2 billion in financial support that has been committed through the Innovation Fund, State aid, and the European Investment Bank","provenance":{"source_id":"European Commission (press release IP/26/2113)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"progress of the 2025 list","statement":{"publisher":"European Commission (press release IP/26/2113)","quote":"To date, 25 Strategic Projects have completed their environmental impact assessment and 17 have obtained a construction permit","provenance":{"source_id":"European Commission (press release IP/26/2113)","source_url":"https://ec.europa.eu/commission/presscorner/api/documents?reference=IP/26/2113&language=en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}},{"fact":"total number of Strategic Projects designated","statement":{"publisher":"European Commission (press release IP/26/2113)","quote":"The Commission has designated 106 strategic projects under the Critical Raw Materials Act (CRMA) overall.","provenance":{"source_id":"European Commission (press release IP/26/2113)","source_url":"https://single-market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/critical-raw-materials/strategic-projects-under-crma/selected-projects_en","retrieved_at":"2026-11-16T10:51:38Z","as_of":"2026-10-09","licence":"CC BY 4.0 (European Commission reuse notice)","confidence":"reported","locator":"The publisher's statement on the page, quoted on the record"}}}]}]}
