OpenOrebeta

Eurallumina

Refinery · Italy

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Eurallumina is a refinery in Italy on record for aluminium. The source lists a capacity of 1 085 000 metric tons per year (2019).

1 085 000metric tons per year

Largest recorded annual capacity: Alumina (2019). Capacity is not production.

STALE 2022

  • Type and status

    Refinery

    Status as listed: inactive

  • Largest recorded capacity

    1 085 000metric tons per year

    Alumina, 2019

  • Latest recorded production

    0 t

    Alumina, refinery output, 2019

  • Water stress of the sub-basin

    Extremely High (>80%)

    Modelled baseline of the place, 2023

Overview

Map

Basemap: Natural Earth (public domain)
  • Eurallumina: Refinery
  • Italy

The ring marks the coordinates the source gives.

Key facts

Type
Refinery
Location (lat, lon)
39.2094, 8.3997
Commodities and products, as listed
Alumina, Alumina hydrate
Status, as listed
inactive
Owner, as listed
Rusal Plc. (100%) (as of 2019)

On our 1:50m basemap this point lies just outside the stated country's outline, within the map's tolerance. Distance: 1.8 km

Supply chain

Where this site sits in the chain: what the record lists, and what else is on record nearby.

Materials on record

Kind of site
Refinery
Commodities and products, as listed
Alumina, Alumina hydrate

In Italy

The atlas has 3 sites on record in Italy.

Country profile: ItalyCompare with another site

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Money

Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.

Annual capacity

As stated by the source, in the source's own unit. Capacity is not production.

ProductCapacitySource
Alumina1 085 000metric tons per year

Rusal Plc. (2020) Annual Report 2019 ↗

Production by year

Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.

Alumina · refinery output 2001–2019, 18 years
YearTonnesSource
20190

Rusal Plc. (2020) Annual Report 2019 ↗

20180

Rusal Plc. (2020) Annual Report 2019 ↗

20170

Rusal Plc. (2018) Annual Report 2017 ↗

20160

Rusal Plc. (2018) Annual Report 2017 ↗

20150

Rusal Plc. (2016) Annual Report 2015 ↗

20140

Rusal Plc. (2016) Annual Report 2015 ↗

20130

Rusal Plc. (2014) Annual Report 2013 ↗

20120

Rusal Plc. (2014) Annual Report 2013 ↗

20110

Rusal Plc. (2012) Annual Report 2011 ↗

20100

Rusal Plc. (2012) Annual Report 2011 ↗

200992 000

Rusal Plc. (2010) Annual Report 2009 ↗

20081 045 000

Rusal Plc. (2010) Annual Report 2009 ↗

20061 096 800The data given in the report for this year reflect the Company’s 100% ownership up to 31.10.2006 and 0% ownership thereafter. Therefore, real production data are estimated by using available data and adjusting it to a full year by multiplying given data with (6/5).

Rio Tinto (2007) Annual Report 2006 ↗

20051 070 000

Rio Tinto (2007) Annual Report 2006 ↗

20041 064 000

Rio Tinto (2007) Annual Report 2006 ↗

20031 021 000

Rio Tinto (2004) Annual Report 2003 ↗

20021 010 000

Rio Tinto (2004) Annual Report 2003 ↗

2001993 000

Rio Tinto (2004) Annual Report 2003 ↗

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.

  • Carbon

    Emissions intensity of the electricity grid of Italy: the country's grid, not this site's.

    285gCO2e/kWh

    2025Reported

    Higher than 32% of the other 208 countries with a grid figure.

    • The atlas has no record of this site's own power supply or emissions.
  • Water

    Baseline water stress of the sub-basin the site lies in.

    Extremely High (>80%)

    2023Estimated

    This is a class, not a figure, so no percentile is given.

    • 86.8% of the available supply is withdrawn in the sub-basin.
    • A modelled property of the place, not a measure of the site's own water use.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per site: the atlas holds the mapped area per country only.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per site: the atlas has no recycling figure for single sites.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by Italy for the materials of this site.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What the atlas does not know about sites

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Add data

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

{n} record used

This record comes from

The database took it from: Rusal Plc. (2020) Annual Report 2019 ; Rusal Plc. Website (Eurallumina) ↗

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Report an error or suggest something

Type the name of a material, a country, a site or a company.