OpenOrebeta

Hillside

Smelter · South Africa

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Hillside is a smelter in South Africa on record for aluminium.

715 kt

Latest recorded output: Aluminium, smelter output, 2019

STALE 2022

  • Type and status

    Smelter

    Status not recorded in the source.

  • Latest recorded production

    715 kt

    Aluminium, smelter output, 2019

  • Water stress of the sub-basin

    Low - Medium (10-20%)

    Modelled baseline of the place, 2023

Overview

Company profiles for names printed here: South32 (matched by exact name, or through a subsidiary GLEIF lists; not verified ownership)

Map

Basemap: Natural Earth (public domain)
  • Hillside: Smelter
  • South Africa

The ring marks the coordinates the source gives.

Key facts

Type
Smelter
Location (lat, lon)
-28.7661, 32.0352
Commodities and products, as listed
Aluminium
Status, as listed
Not recorded in the source
Owner, as listed
South32 (100%) (as of 2019)

Supply chain

Where this site sits in the chain: what the record lists, and what else is on record nearby.

Materials on record

Kind of site
Smelter
Commodities and products, as listed
Aluminium

In South Africa

The atlas has 35 sites on record in South Africa.

Country profile: South AfricaCompare with another site

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Money

Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.

Production by year

Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.

Aluminium · smelter output 2001–2019, 33 years
YearTonnesSource
2019715 000Reporting period: July-June

South32 Limited (2019) Quarterly Report June 2019 ↗

2018712 000Reporting period: July-June

South32 Limited (2019) Quarterly Report June 2019 ↗

2017714 000Reporting period: July-June

South32 Limited (2017) Quarterly Report June 2017 ↗

2016697 000Reporting period: July-June

South32 Limited (2017) Quarterly Report June 2017 ↗

2015697 200Reporting period: July-June. The data given in the report for this year reflect the Company’s 100% ownership up to 31.04.2015 and 0% ownership thereafter. Therefore, real production data are estimated by using available data and adjusting it to a full year by multiplying given data with (12/10).

BHP Billiton (2015) Operational Review for the year ended 30 June 2015 ↗

2014715 000Reporting period: July-June

BHP Billiton (2015) Operational Review for the year ended 30 June 2015 ↗

201489 000Reporting period: July-June

BHP Billiton (2015) Operational Review for the year ended 30 June 2015 ↗

2013665 000Reporting period: July-June

BHP Billiton (2013) Production Report for the year ended 30 June 2013 ↗

201396 000Reporting period: July-June

BHP Billiton (2013) Production Report for the year ended 30 June 2013 ↗

2012621 000Reporting period: July-June

BHP Billiton (2013) Production Report for the year ended 30 June 2013 ↗

201298 000Reporting period: July-June

BHP Billiton (2013) Production Report for the year ended 30 June 2013 ↗

2011711 000Reporting period: July-June

BHP Billiton (2011) Production Report for the year ended 30 June 2011 ↗

201197 000Reporting period: July-June

BHP Billiton (2011) Production Report for the year ended 30 June 2011 ↗

2010710 000Reporting period: July-June

BHP Billiton (2011) Production Report for the year ended 30 June 2011 ↗

201098 000Reporting period: July-June

BHP Billiton (2011) Production Report for the year ended 30 June 2011 ↗

2009702 000Reporting period: July-June

BHP Billiton (2009) Quarterly Production Report - June 2009 ↗

200999 000Reporting period: July-June

BHP Billiton (2009) Quarterly Production Report - June 2009 ↗

2008695 000Reporting period: July-June

BHP Billiton (2009) Quarterly Production Report - June 2009 ↗

2008168 000Reporting period: July-June

BHP Billiton (2009) Quarterly Production Report - June 2009 ↗

2007704 000Reporting period: July-June

BHP Billiton (2007) Quarterly Production Report - June 2007 ↗

2007194 000Reporting period: July-June

BHP Billiton (2007) Quarterly Production Report - June 2007 ↗

2006700 000Reporting period: July-June

BHP Billiton (2007) Quarterly Production Report - June 2007 ↗

2006179 000Reporting period: July-June

BHP Billiton (2007) Quarterly Production Report - June 2007 ↗

2005685 000Reporting period: July-June

BHP Billiton (2005) Quarterly Production Report - June 2005 ↗

2005166 000Reporting period: July-June

BHP Billiton (2005) Quarterly Production Report - June 2005 ↗

2004622 000Reporting period: July-June

BHP Billiton (2005) Quarterly Production Report - June 2005 ↗

2004184 000Reporting period: July-June

BHP Billiton (2005) Quarterly Production Report - June 2005 ↗

2003534 000Reporting period: July-June

BHP Billiton (2003) Quarterly Production Report - June 2003 ↗

2003185 000Reporting period: July-June

BHP Billiton (2003) Quarterly Production Report - June 2003 ↗

2002501 000Reporting period: July-June

BHP Billiton (2003) Quarterly Production Report - June 2003 ↗

2002175 000Reporting period: July-June

BHP Billiton (2003) Quarterly Production Report - June 2003 ↗

2001498 000Reporting period: July-June

BHP Billiton (2001) Quarterly Production Report - June 2001 ↗

2001178 000Reporting period: July-June

BHP Billiton (2001) Quarterly Production Report - June 2001 ↗

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.

  • Carbon

    Emissions intensity of the electricity grid of South Africa: the country's grid, not this site's.

    699gCO2e/kWh

    2025Reported

    Higher than 93% of the other 208 countries with a grid figure.

    • The atlas has no record of this site's own power supply or emissions.
  • Water

    Baseline water stress of the sub-basin the site lies in.

    Low - Medium (10-20%)

    2023Estimated

    This is a class, not a figure, so no percentile is given.

    • 11.5% of the available supply is withdrawn in the sub-basin.
    • A modelled property of the place, not a measure of the site's own water use.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per site: the atlas holds the mapped area per country only.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per site: the atlas has no recycling figure for single sites.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by South Africa for the materials of this site.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What the atlas does not know about sites

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Add data

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

{n} record used

This record comes from

The database took it from: South32 Limited (2019) Annual Report 2019 ↗

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Report an error or suggest something

Type the name of a material, a country, a site or a company.