Jharsuguda Aluminium Smelter
Smelter · India
Watch and Edit are coming soon.
Jharsuguda Aluminium Smelter is a smelter in India on record for aluminium. The source lists a capacity of 500 000 metric tons per year (2019).
500 000metric tons per year
Largest recorded annual capacity: Aluminium (2019). Capacity is not production.
STALE 2022
Type and status
Smelter
Status not recorded in the source.
Largest recorded capacity
500 000metric tons per year
Aluminium, 2019
Latest recorded production
786 kt
Aluminium ingot, smelter output, 2019
Water stress of the sub-basin
Low (<10%)
Modelled baseline of the place, 2023
Overview
Company profiles for names printed here: Vedanta Limited (matched by exact name, or through a subsidiary GLEIF lists; not verified ownership)
Map
- Jharsuguda Aluminium Smelter: Smelter
- India
The ring marks the coordinates the source gives.
Key facts
- Type
- Smelter
- Country
- India (IND)
- Location (lat, lon)
- 21.8061, 84.0396
- Commodities and products, as listed
- Aluminium, Aluminium ingot, Aluminium billet, Aluminium wire rod, Aluminium slab
- Status, as listed
- Not recorded in the source
- Owner, as listed
- Vedanta Limited (51%) (as of 2019)
Supply chain
Where this site sits in the chain: what the record lists, and what else is on record nearby.
Materials on record
- Kind of site
- Smelter
- Commodities and products, as listed
- Aluminium, Aluminium ingot, Aluminium billet, Aluminium wire rod, Aluminium slab
In India
The atlas has 28 sites on record in India.
Country profile: IndiaCompare with another site
Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.
Money
Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.
Annual capacity
As stated by the source, in the source's own unit. Capacity is not production.
| Product | Capacity | Source |
|---|---|---|
| Aluminium | 500 000metric tons per year |
Production by year
Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.
Aluminium billet · smelter output 2012–2019, 8 years
| Year | Tonnes | Source |
|---|---|---|
| 2019 | 414 119Reporting period: April-March | |
| 2018 | 315 537Reporting period: April-March | |
| 2017 | 146 023Reporting period: April-March | |
| 2016 | 110 400Reporting period: April-March | |
| 2015 | 115 979Reporting period: April-March | |
| 2014 | 121 232Reporting period: April-March | |
| 2013 | 98 299Reporting period: April-March | |
| 2012 | 65 853Reporting period: April-March |
Aluminium hot metal · smelter output 2012–2019, 8 years
| Year | Tonnes | Source |
|---|---|---|
| 2019 | 33 924Reporting period: April-March | |
| 2018 | 44 257Reporting period: April-March | |
| 2017 | 46 541Reporting period: April-March | |
| 2016 | 8 892Reporting period: April-March | |
| 2015 | 0Reporting period: April-March | |
| 2014 | 0Reporting period: April-March | |
| 2013 | 7 396Reporting period: April-March | |
| 2012 | 9 164Reporting period: April-March |
Aluminium ingot · smelter output 2012–2019, 8 years
| Year | Tonnes | Source |
|---|---|---|
| 2019 | 785 988Reporting period: April-March | |
| 2018 | 590 375Reporting period: April-March | |
| 2017 | 474 288Reporting period: April-March | |
| 2016 | 333 249Reporting period: April-March | |
| 2015 | 303 756Reporting period: April-March | |
| 2014 | 301 008Reporting period: April-March | |
| 2013 | 305 878Reporting period: April-March | |
| 2012 | 255 212Reporting period: April-March |
Aluminium slab · smelter output 2019–2019, 1 years
| Year | Tonnes | Source |
|---|---|---|
| 2019 | 10 388Reporting period: April-March |
Aluminium wire rod · smelter output 2012–2019, 8 years
| Year | Tonnes | Source |
|---|---|---|
| 2019 | 143 364Reporting period: April-March | |
| 2018 | 155 865Reporting period: April-March | |
| 2017 | 119 471Reporting period: April-March | |
| 2016 | 139 184Reporting period: April-March | |
| 2015 | 133 603Reporting period: April-March | |
| 2014 | 120 013Reporting period: April-March | |
| 2013 | 115 464Reporting period: April-March | |
| 2012 | 99 493Reporting period: April-March |
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.
Carbon
Emissions intensity of the electricity grid of India: the country's grid, not this site's.
671gCO2e/kWh
Higher than 90% of the other 208 countries with a grid figure.
- The atlas has no record of this site's own power supply or emissions.
Water
Baseline water stress of the sub-basin the site lies in.
Low (<10%)
This is a class, not a figure, so no percentile is given.
- 3.5% of the available supply is withdrawn in the sub-basin.
- A modelled property of the place, not a measure of the site's own water use.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining.
Not available per site: the atlas holds the mapped area per country only.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of demand.
Not available per site: the atlas has no recycling figure for single sites.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
USGS Table 4 lists no export control by India for the materials of this site.
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
What the atlas does not know about sites
Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- WU Vienna mine database v1.0.3 ↗35 records used
- Licence
- CC-BY-4.0
- As of
- 2012–2022
- Confidence
- Reported
- Ember Yearly Electricity Data ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2025
- Confidence
- Reported
- WRI Aqueduct 4.0 ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2023
- Confidence
- Estimated
{n} record used
This record comes from
The database took it from: Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.