OpenOrebeta

Kansanshi

Mine · Zambia

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Kansanshi is a mine in Zambia on record for copper.

347 kt

Latest recorded output: Copper anodes, smelter output, 2018

STALE 2022

  • Type and status

    Mine

    Status not recorded in the source.

  • Latest recorded production

    347 kt

    Copper anodes, smelter output, 2018

  • Water stress of the sub-basin

    Low (<10%)

    Modelled baseline of the place, 2023

Overview

Company profiles for names printed here: First Quantum Minerals (matched by exact name, or through a subsidiary GLEIF lists; not verified ownership)

Map

Basemap: Natural Earth (public domain)
  • Kansanshi: Mine
  • Zambia

The ring marks the coordinates the source gives.

Key facts

Type
Mine (listed as: Mine, Smelter)
Location (lat, lon)
-12.0912, 26.4338
Commodities and products, as listed
Copper, Gold, Copper cathode
Status, as listed
Not recorded in the source
Owner, as listed
First Quantum Minerals Limited (80%) (as of 2018)

Supply chain

Where this site sits in the chain: what the record lists, and what else is on record nearby.

Materials on record

Kind of site
Mine
Commodities and products, as listed
Copper, Gold, Copper cathode

In Zambia

The atlas has 9 sites on record in Zambia.

Country profile: ZambiaCompare with another site

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Money

Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.

Production by year

Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.

Copper · contained in mine output 2005–2018, 38 years
YearTonnesSource
201871 153

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201888 635

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201892 118

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201771 373

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201790 855

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201788 520

First Quantum Minerals Ltd (2018) Annual Report 2018 ; Estimate (value) ↗

201666 805

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201699 772

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201688 232

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201586 716

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201581 540

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201560 395

First Quantum Minerals Ltd (2016) Annual Report 2016 ; Estimate (value) ↗

201475 586

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

2014119 176

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

201465 061

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

201365 408

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

2013126 045

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

201381 615

First Quantum Minerals Ltd (2014) Annual Report 2014 ; Estimate (value) ↗

201264 978

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

2012117 493

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

201286 062

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

201152 775

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

2011120 104

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

201156 406

First Quantum Minerals Ltd (2012) Annual Report 2012 ; Estimate (value) ↗

201047 574

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

2010107 352

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

201077 242

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

200932 651

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

2009103 370

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

2009111 544

First Quantum Minerals Ltd (2010) Annual Report 2010 ; Estimate (value) ↗

2008101 524

First Quantum Minerals Ltd (2008) Annual Report 2008 ; Estimate (value) ; Estimate (grade) ↗

2008103 990

First Quantum Minerals Ltd (2008) Annual Report 2008 ; Estimate (value) ↗

200798 005

First Quantum Minerals Ltd (2007) Annual Report 2007 ; Estimate (value) ; Estimate (grade) ↗

200765 428

First Quantum Minerals Ltd (2007) Annual Report 2007 ; Estimate (value) ↗

200671 565

First Quantum Minerals Ltd (2006) Annual Report 2006 ; Estimate (value) ; Estimate (grade) ↗

200657 330

First Quantum Minerals Ltd (2006) Annual Report 2006 ; Estimate (value) ; Estimate (grade) ↗

200548 402

First Quantum Minerals Ltd (2006) Annual Report 2006 ; Estimate (value) ; Estimate (grade) ↗

200528 899

First Quantum Minerals Ltd (2006) Annual Report 2006 ; Estimate (value) ; Estimate (grade) ↗

Copper anodes · smelter output 2015–2018, 4 years
YearTonnesSource
2018347 037inclusive of Sentinel and third-party concentrate processed

First Quantum Minerals Ltd (2018) Annual Report 2018 ↗

2017297 553inclusive of Sentinel and third-party concentrate processed

First Quantum Minerals Ltd (2018) Annual Report 2018 ↗

2016257 330inclusive of Sentinel and third-party concentrate processed

First Quantum Minerals Ltd (2016) Annual Report 2016 ↗

2015150 292inclusive of Sentinel and third-party concentrate processed

First Quantum Minerals Ltd (2016) Annual Report 2016 ↗

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.

  • Carbon

    Emissions intensity of the electricity grid of Zambia: the country's grid, not this site's.

    126gCO2e/kWh

    2024Reported

    Higher than 16% of the other 208 countries with a grid figure.

    • The atlas has no record of this site's own power supply or emissions.
  • Water

    Baseline water stress of the sub-basin the site lies in.

    Low (<10%)

    2023Estimated

    This is a class, not a figure, so no percentile is given.

    • 0.1% of the available supply is withdrawn in the sub-basin.
    • A modelled property of the place, not a measure of the site's own water use.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per site: the atlas holds the mapped area per country only.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per site: the atlas has no recycling figure for single sites.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by Zambia for the materials of this site.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What the atlas does not know about sites

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Add data

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

{n} record used

This record comes from

The database took it from: First Quantum Minerals Limited (2018) Annual Report 2018 ↗

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Type the name of a material, a country, a site or a company.