OpenOrebeta

Korba

Refinery · India

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Korba is a refinery in India on record for aluminium. The source lists a capacity of 570 000 metric tons per year (2019).

570 000metric tons per year

Largest recorded annual capacity: Aluminium (2019). Capacity is not production.

STALE 2022

  • Type and status

    Refinery

    Status not recorded in the source.

  • Largest recorded capacity

    570 000metric tons per year

    Aluminium, 2019

  • Latest recorded production

    321 kt

    Aluminium ingots, smelter output, 2019

  • Water stress of the sub-basin

    High (40-80%)

    Modelled baseline of the place, 2023

Overview

Map

Basemap: Natural Earth (public domain)
  • Korba: Refinery
  • India

The ring marks the coordinates the source gives.

Key facts

Type
Refinery (listed as: Refinery, Smelter)
Location (lat, lon)
22.3989, 82.7378
Commodities and products, as listed
Alumina, Aluminium, Aluminium ingot, wire rod, cold-rolled sheets, cold-rolled coils, hot-rolled sheets
Status, as listed
Not recorded in the source

Supply chain

Where this site sits in the chain: what the record lists, and what else is on record nearby.

Materials on record

Kind of site
Refinery
Commodities and products, as listed
Alumina, Aluminium, Aluminium ingot, wire rod, cold-rolled sheets, cold-rolled coils, hot-rolled sheets

In India

The atlas has 28 sites on record in India.

Country profile: IndiaCompare with another site

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Money

Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.

Annual capacity

As stated by the source, in the source's own unit. Capacity is not production.

ProductCapacitySource
Aluminium570 000metric tons per year

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

Alumina200 000metric tons per year

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

Production by year

Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.

Alumina · refinery output 2006–2010, 5 years
YearTonnesSource
201042 893Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2009197 947Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2008217 185Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2007222 395Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

2006219 485Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

Aluminium ingots · smelter output 2006–2019, 14 years
YearTonnesSource
2019320 979Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2018318 585Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2017202 769Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201693 442Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2015104 650Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201434 714Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

20138 416Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

20128 671Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201127 927Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201054 173Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2009172 263Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2008195 795Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2007182 921Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

200658 750Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

Aluminium rods · smelter output 2006–2019, 14 years
YearTonnesSource
2019224 133Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2018223 983Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2017205 277Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2016217 650Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2015172 464Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2014166 239Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2013179 987Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2012167 826Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2011160 665Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2010148 279Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2009127 120Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2008101 183Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200772 981Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

200664 602Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

Aluminium rolled products · smelter output 2006–2019, 14 years
YearTonnesSource
201926 119Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201826 483Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201719 033Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201620 526Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201546 807Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201451 083Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201358 587Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201269 157Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201166 706Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201065 973Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200957 399Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200861 693Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200757 287Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

200650 391Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.

  • Carbon

    Emissions intensity of the electricity grid of India: the country's grid, not this site's.

    671gCO2e/kWh

    2025Reported

    Higher than 90% of the other 208 countries with a grid figure.

    • The atlas has no record of this site's own power supply or emissions.
  • Water

    Baseline water stress of the sub-basin the site lies in.

    High (40-80%)

    2023Estimated

    This is a class, not a figure, so no percentile is given.

    • 59.5% of the available supply is withdrawn in the sub-basin.
    • A modelled property of the place, not a measure of the site's own water use.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per site: the atlas holds the mapped area per country only.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per site: the atlas has no recycling figure for single sites.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by India for the materials of this site.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What the atlas does not know about sites

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Add data

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

{n} record used

This record comes from

The database took it from: Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Report an error or suggest something

Type the name of a material, a country, a site or a company.