Odda
Smelter · Norway
Watch and Edit are coming soon.
Odda is a smelter in Norway on record for zinc.
191 kt
Latest recorded output: Zinc, smelter output, 2018
STALE 2022
Type and status
Smelter
Status not recorded in the source.
Latest recorded production
191 kt
Zinc, smelter output, 2018
Water stress of the sub-basin
Low (<10%)
Modelled baseline of the place, 2023
Overview
Map
- Odda: Smelter
- Norway
The ring marks the coordinates the source gives.
Key facts
- Type
- Smelter
- Country
- Norway (NOR)
- Location (lat, lon)
- 60.0930, 6.5325
- Commodities and products, as listed
- Zinc, Zinc alloys
- Status, as listed
- Not recorded in the source
Supply chain
Where this site sits in the chain: what the record lists, and what else is on record nearby.
Materials on record
- Kind of site
- Smelter
- Commodities and products, as listed
- Zinc, Zinc alloys
In Norway
The atlas has 5 sites on record in Norway.
Country profile: NorwayCompare with another site
Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.
Money
Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.
Production by year
Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.
Aluminium fluoride · smelter output 2000–2016, 17 years
| Year | Tonnes | Source |
|---|---|---|
| 2016 | 32 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2015 | 31 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2014 | 35 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2013 | 34 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2012 | 36 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2011 | 35 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2010 | 22 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2009 | 33 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2008 | 34 611 | |
| 2007 | 34 833 | |
| 2006 | 28 762 | |
| 2005 | 30 484 | |
| 2004 | 29 740 | |
| 2003 | 27 500 | |
| 2002 | 28 976 | |
| 2001 | 29 266 | |
| 2000 | 28 372 |
Zinc · smelter output 2000–2018, 19 years
| Year | Tonnes | Source |
|---|---|---|
| 2018 | 191 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2017 | 172 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2016 | 171 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2015 | 163 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2014 | 166 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2013 | 143 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2012 | 153 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2011 | 153 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2010 | 149 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2009 | 139 000 | Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗ |
| 2008 | 145 469 | |
| 2007 | 157 027 | |
| 2006 | 160 670 | |
| 2005 | 151 285 | |
| 2004 | 140 901 | |
| 2003 | 143 627 | |
| 2002 | 144 538 | |
| 2001 | 144 694 | |
| 2000 | 138 390 |
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.
Carbon
Emissions intensity of the electricity grid of Norway: the country's grid, not this site's.
28gCO2e/kWh
Higher than 5% of the other 208 countries with a grid figure.
- The atlas has no record of this site's own power supply or emissions.
Water
Baseline water stress of the sub-basin the site lies in.
Low (<10%)
This is a class, not a figure, so no percentile is given.
- 0.5% of the available supply is withdrawn in the sub-basin.
- A modelled property of the place, not a measure of the site's own water use.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining.
Not available per site: the atlas holds the mapped area per country only.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of demand.
Not available per site: the atlas has no recycling figure for single sites.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
USGS Table 4 lists no export control by Norway for the materials of this site.
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
What the atlas does not know about sites
Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- WU Vienna mine database v1.0.3 ↗37 records used
- Licence
- CC-BY-4.0
- As of
- 2000–2022
- Confidence
- Reported
- Ember Yearly Electricity Data ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2025
- Confidence
- Reported
- WRI Aqueduct 4.0 ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2023
- Confidence
- Estimated
{n} record used
This record comes from
The database took it from: Boliden Group (2019) Boliden 2018 Annual and Sustainability Report ↗
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.
What we don't know yet
No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.
- Largest recorded capacity: No capacity recorded.Add data: Largest recorded capacity: No capacity recorded.