OpenOrebeta

Tuticorin

Refinery · India

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Tuticorin is a refinery in India on record for copper. The source lists a capacity of 496 000 metric tons per year (2019).

496 000metric tons per year

Largest recorded annual capacity: Copper (2019). Capacity is not production.

STALE 2022

  • Type and status

    Refinery

    Status not recorded in the source.

  • Largest recorded capacity

    496 000metric tons per year

    Copper, 2019

  • Latest recorded production

    2.87 kt

    Copper cathode, refinery output, 2019

  • Water stress of the sub-basin

    Extremely High (>80%)

    Modelled baseline of the place, 2023

Overview

Map

Basemap: Natural Earth (public domain)
  • Tuticorin: Refinery
  • India

The ring marks the coordinates the source gives.

Key facts

Type
Refinery (listed as: Refinery, Smelter)
Location (lat, lon)
8.8210, 78.0802
Commodities and products, as listed
Copper rod, Copper anode, Copper cathode, Sulphuric acid, Phosphoric acid
Status, as listed
Not recorded in the source

Supply chain

Where this site sits in the chain: what the record lists, and what else is on record nearby.

Materials on record

Kind of site
Refinery
Commodities and products, as listed
Copper rod, Copper anode, Copper cathode, Sulphuric acid, Phosphoric acid

In India

The atlas has 4 sites on record in India.

Country profile: IndiaCompare with another site

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Money

Capacity and yearly production as the sources record them. The atlas has no revenue, cost or value figure for a single site.

Annual capacity

As stated by the source, in the source's own unit. Capacity is not production.

ProductCapacitySource
Copper496 000metric tons per year

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

Copper cathode246 000metric tons per year

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

Production by year

Tonnes, as the database took them from company and agency reports. Years without a reported figure are left out, not filled in.

Copper anode · smelter output 2006–2019, 14 years
YearTonnesSource
20194Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2018392 543Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2017400 620Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2016387 016Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2015361 839Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2014301 120Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2013349 845Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2012327 703Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2011304 964Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2010333 924Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2009313 284Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2008335 652Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2007313 117Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

2006273 049Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

Copper cathode · refinery output 2006–2019, 14 years
YearTonnesSource
20192 873Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2018216 749Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2017216 119Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

2016201 864Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2015194 019Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2014151 592Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

2013191 858Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2012169 448Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2011141 281Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

2010154 177Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2009139 706Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2008162 940Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

2007150 565Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

200698 796Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

Copper rods · refinery output 2006–2019, 14 years
YearTonnesSource
20192 282Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201867 207Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201771 178Reporting period: April-March

Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

201668 685Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201553 400Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201422 105Reporting period: April-March

Vedanta Limited (2016) Form 20-F Annual Report 2016 ↗

201352 404Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201244 961Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201154 006Reporting period: April-March

Sterlite Industries (India) Limited (2013) Form 20-F Annual Report 2013 ↗

201055 893Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200976 292Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200881 698Reporting period: April-March

Sterlite Industries (India) Limited (2010) Form 20-F Annual Report 2010 ↗

200753 660Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

200630 180Reporting period: April-March

Sterlite Industries (India) Limited (2008) Form 20-F Annual Report 2008 ↗

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. For a single site most of them are properties of the place or the country, and are labelled so.

  • Carbon

    Emissions intensity of the electricity grid of India: the country's grid, not this site's.

    671gCO2e/kWh

    2025Reported

    Higher than 90% of the other 208 countries with a grid figure.

    • The atlas has no record of this site's own power supply or emissions.
  • Water

    Baseline water stress of the sub-basin the site lies in.

    Extremely High (>80%)

    2023Estimated

    This is a class, not a figure, so no percentile is given.

    • 102.5% of the available supply is withdrawn in the sub-basin.
    • A modelled property of the place, not a measure of the site's own water use.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per site: the atlas holds the mapped area per country only.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per site: the atlas has no recycling figure for single sites.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by India for the materials of this site.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What the atlas does not know about sites

Sites come from a USGS compilation for Latin America and the Caribbean that describes 2014, the national surveys of Australia (plants, mines, critical-mineral deposits), Canada (mines, smelters, refineries, critical-mineral projects) and Sweden (mines in operation and significant prospects), a 2022 database of coal and metal mines, and mine areas mapped by OpenStreetMap volunteers (marked as estimated). A deposit or a project is not a mine and is never counted as one. Processing plants in Asia, Africa and Europe are mostly missing. A missing facility means it is not in these sources, not that it does not exist.

Add data

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

{n} record used

This record comes from

The database took it from: Vedanta Limited (2019) Form 20-F Annual Report 2019 ↗

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Type the name of a material, a country, a site or a company.