Helium
Industrial gases
Watch and Edit are coming soon.
United States mined 43% (USGS) of the world's helium in 2025 (estimated).
43%
of the world's helium was mined in United States in 2025 (estimated), according to USGS · about 2 in 5
ANNUAL 2025
Leading mining country
43%
United States, 2025 (estimated), USGS
Sites on record
10
Mines and plants in the open sources. Coverage is partial. Also on record: 1 deposit or project, which is not counted.
Overview
Helium is not mined. It is separated from natural gas at a small number of plants and shipped as a liquid, for cooling MRI magnets, making chips and optical fibre, and leak testing.
Map
- Share of world mine output
- Mine or brine operation
- Processing site
- Deposit or project (not a mine or a plant yet)
Sites are those in the open sources. A site missing here is missing from the sources, not from the world.
2025
Key facts
- Group
- Industrial gases
- Stages in the atlas
- Reserves · Mine
- World mine production, 2025
- 190 million cubic meters (estimated)
- Open price series
- None
Leading countries
Mine · USGS, 2025 (estimated)
- United Statesabout 2 in 543%
- Qatarabout 1 in 333%
- Russiaabout 1 in 109.5%
- Algeriaabout 1 in 205.8%
- Canadaabout 1 in 203.2%
The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.
What the source does not cover
- No open price series for helium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
Supply chain
Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.
Reserves
Concentration
ANNUAL 2025United States holds about 2 in 3 (68 %) of the world's helium helium reserves recorded here.
Helium Reserves · 2025
(Data in million cubic meters unless otherwise specified)
- Top 3 countries
- 96.6 %
- United States, Algeria, Russia
Who holds what
- United States8 500 million cubic meters68.4 %
- Algeria1 800 million cubic meters14.5 %
- Russia1 700 million cubic meters13.7 %
- South Africa400 million cubic meters3.2 %
- Poland24 million cubic meters0.2 %
- CanadaNot available
- ChinaNot available
- QatarLarge
- World totalNot available
Mine
Concentration
ANNUAL 2025United States mines about 2 in 5 (43 %) of the world's helium recorded here.
Helium Production · 2025 (estimated)
(Data in million cubic meters unless otherwise specified)
- Top 3 countries
- 85.3 %
- United States, Qatar, Russia
Who holds what
- United States81 million cubic meters42.6 %
- Qatar63 million cubic meters33.2 %
- Russia18 million cubic meters9.5 %
- Algeria11 million cubic meters5.8 %
- Canada6 million cubic meters3.2 %
- China3 million cubic meters1.6 %
- Poland3 million cubic meters1.6 %
- South AfricaLess than half a unit
- World total190 million cubic meters
Flow through the stages
Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.
The diagram is wider than this screen. Swipe it sideways to see every stage.
- Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025
- No trade bands: No HS6 code isolates this material, so trade flows cannot be shown from HS6 data.
- Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
Table of what is drawn (8 country marks, 0 trade flows)
| Stage | Country | Share | Amount | Source |
|---|---|---|---|---|
| Mine 2025 | United States | 42.6 % | 81 million cubic meters | |
| Mine 2025 | Qatar | 33.2 % | 63 million cubic meters | |
| Mine 2025 | Russia | 9.5 % | 18 million cubic meters | |
| Mine 2025 | Algeria | 5.8 % | 11 million cubic meters | |
| Mine 2025 | Canada | 3.2 % | 6 million cubic meters | |
| Mine 2025 | China | 1.6 % | 3 million cubic meters | |
| Mine 2025 | Poland | 1.6 % | 3 million cubic meters | |
| Mine 2025 | Other / not attributed | 2.6 % | – |
Largest trade flows
No HS6 code isolates this material, so trade flows cannot be shown from HS6 data.
Sites on record · 10 and 1 deposit or project
11 of 11 shown
- Antelope LakeMine · Canada
- Battle CreekMine · Canada
- Battle Creek SMine · Canada
- Battle Creek-CypressMine · Canada
- CadillacMine · Canada
- EastendMine · Canada
- KnappenMine · Canada
- MankotaMine · Canada
- StevevilleMine · Canada
- WilhelmMine · Canada
- WorsleyProject (not producing yet) · Canada
One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.
Money
The open price series where one exists, and one estimate with its formula. No licensed market data is shown.
Price
There is no open price series for helium, so the atlas shows no price and no estimated value.
- No open price series for helium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
An estimated production value is computed only where an open price exists for the same product the mine figure counts (copper, nickel, zinc, tin and phosphate rock). Why prices are missing
Investment pipeline
announced figuresPlanned and under-construction helium projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.
No data yet. The atlas has read no announcement of this kind for a helium project. The list is short and hand-read; a missing project is missing from the list, not from the world.
A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.
Public support instruments
Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names helium, and general critical-minerals instruments (marked). Each is one statement by its publisher.
2025-06-17announced · G7Other supportannounced
G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.
Covers: “critical minerals”
critical minerals in general; the source does not name helium
The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
3 further statements from the source
launch of the plan
The publisher's words: “We are launching a G7 Critical Minerals Action Plan”
roadmap content
The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”
capital mobilisation
The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
2025-11-04published · CanadaFundannounced
Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.
CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”
Covers: “critical minerals projects and companies”
critical minerals in general; the source does not name helium
The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
3 further statements from the source
tools of the fund
The publisher's words: “including equity investments, loan guarantees, and offtake agreements”
First and Last Mile Fund
The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”
absorbs the Critical Minerals Infrastructure Fund
The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
2025-11-22published · United KingdomFundannounced
The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.
GBP 50 M · “up to £50 million”
Covers: “critical mineral projects in the UK”
critical minerals in general; the source does not name helium
The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
2 further statements from the source
stockpiling under consideration
The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”
later programme page (published 22 June 2026): grant share
The publisher's words: “with £45 million of this available as grant funding”
2026-01-14signed · United StatesPrice floorannounced
Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.
Covers: “processed critical minerals and their derivative products (PCMDPs)”
critical minerals in general; the source does not name helium
The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
2026-02-02announced · United StatesStockpileannounced
The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.
USD 10 bn · “a Direct Loan of up to $10 billion”
Covers: “essential raw materials”
critical minerals in general; the source does not name helium
The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
4 further statements from the source
what it establishes
The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”
storage
The publisher's words: “that will store essential raw materials in facilities across the United States”
borrower structure
The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”
later EXIM release of May 4, 2026 restating the loan
The publisher's words: “The transaction includes a direct loan of up to $10 billion”
There is no open price series for helium, so these instruments are listed without a chart.
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.
Carbon
Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.
Not computed: No open refining series by country
- Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water
Share of the material's mine sites on record that lie in high or extremely high baseline water stress.
0%of mine sites on record
None of the other 25 materials with rated mine sites has a lower figure.
- 0 of 10 sites with a class (10 mine and brine sites on record).
- Counted by site, not by tonnage: it is not a share of production.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining.
Not available per material: the area is mapped per country for all commodities together.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate).
No published rate for this material.
- Eurostat publishes no end-of-life recycling input rate for helium.
- No EU target in these two laws names this material.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
The figures behind the indicators
Grid-carbon proxy for refining
estimated · proxyNot computed: No open refining series by country
Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water stress where the mines are
estimated · by site0%of mine sites on record lie in high or extremely high water stress (0 of 10)
- Low - Medium (10-20%)3 sites
- Arid and Low Water Use7 sites
Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate)
Eurostat publishes no end-of-life recycling input rate for helium.
EU targets that apply
No EU target in these two laws names this material.
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
USGS Table 4 lists no export control for this material.
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
What if?
Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.
What the atlas does not know about helium
How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.
Data coverage
Mines on record: 3.2% (1/7)
Plants on record: no open refining series by country
Owner or operator known: 3.2% (1/7)
Assurance known: no public assurance list is ingested yet
Mines:3.2% of world output lies in countries with a record (1 of 7 countries)(Helium Production, 2025)
Producer countries without a record: United States 43%, Qatar 33%, Russia 9.5%, Algeria 5.8%, China 1.6%, Poland 1.6%
- Processing plants: No open refining series by country
Owners and operators:3.2% of world output lies in countries with a record (1 of 7 countries)(Helium Production, 2025)
Producer countries without a record: United States 43%, Qatar 33%, Russia 9.5%, Algeria 5.8%, China 1.6%, Poland 1.6%
- Assurance: No public assurance list is ingested yet
A country in these lists marks missing data, not missing industry.
Mining and refining: who leads
USGS MCS 2026, 2025 (estimated)
- Mining:United States 43% (about 2 in 5), 2025
No open refining series by country
Price transparency
No open price series for helium: the services that publish one are licensed, so no price is shown.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- NRCan critical minerals 2026 ↗11 records used
- Licence
- OGL-Canada-2.0
- As of
- 2026
- Confidence
- Reported
- USGS MCS 2026 ↗5 records used
- Licence
- CC0-1.0
- As of
- 2024–2025
- Confidence
- Reported · Estimated
- WRI Aqueduct 4.0 ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2023
- Confidence
- Estimated
Source registry for this material
- Mineral Commodity Summaries 2026 Data Release ↗, U.S. Geological Survey, National Minerals Information Center. Licence: CC0-1.0. annual (February).
- BACI bilateral trade flows at HS6 (version 202601) ↗, CEPII. Licence: Etalab Open Licence 2.0. annual.
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.
What we don't know yet
No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.
- Leading refining country: No open refining table by country.Add data: Leading refining country: No open refining table by country.
- Recycling's share of EU demand: No published rate.Add data: Recycling's share of EU demand: No published rate.