OpenOrebeta

Togo

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Togo mined 0.6% (USGS) of the world's phosphate rock in 2025 (estimated).

0.6%

of the world's phosphate rock mining in 2025 (estimated), according to USGS

#18 in phosphate rock miningANNUAL 2025

  • Materials with a production share

    1

    with a mining or refining share on record

  • Exports of the atlas's materials

    $394M

    2024; most of it phosphate rock; 16 partner countries

  • Grid emissions intensity

    421gCO2e/kWh

    2024

  • Imports of the atlas's materials

    $4.9M

    2024; most of it aluminium; 13 partner countries

Overview

What it produces

Share of world output, per material and stage. Each bar is one source's figure; where two sources report the same stage, both are shown and never blended. A full-width bar would be 100%.

  • Phosphate rock· Mine

    • 0.6%#18 in phosphate rock miningUSGS, 2025 (estimated) · 1 600 kt

      Rank 18 of the 24 countries with a figure in this USGS table.

Key facts

Country code
TGO
GDP
$12bn (2025)
Mineral rents, share of GDP
4.9% (2021)
Ores and metals, share of goods exports
26% (2025)
Mining area, all commodities
5 km² (2019; rank 118 of 144)

Money →Sustainability →Risks & policy →

Map

Basemap: Natural Earth (public domain)
  • Togo

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

Country in context

Phosphate rock: Mine production, 2025 (estimated). All rows come from the same table.

Country in context: Phosphate rock, Mine production, 2025
Countrythousand metric tonsShare of worldSource
TogoThis country1 6000.6 %
ChinaLargest producer in the table110 00044.0 %
World totalWorld total as the source gives it250 000–

Supply chain

Every figure the sources give for this country, its trade partners per material, and where its sites are.

Production, refining and reserves

The latest year of each series. Share is of the series total: the larger of the source world total and the sum of its rows. Rank counts only the countries that have a number in that series.

Production, refining and reserves: Togo
SeriesAmountShare of worldSource
Phosphate rock: Mine production2025 (estimated) · USGS MCS 2026 · rank 18 of 241 600 kt0.6 %
Phosphate rock: Reserves2025 · USGS MCS 2026 · rank 22 of 2430 000 kt0.0 %

Trade partners

2 recorded flows, 2024

Basemap: Natural Earth (public domain)
  • Recorded trade flow; a thicker line is a larger value
  • Togo

Lines join the middle of each country. They are not shipping routes.

Recorded trade flows of Togo: Phosphate rock
PartnerMaterialYearValue, US$Source
Export toIndiaPhosphate rockMine2024$153M
Export toIndiaPhosphate rockMine2024$131M

Reconciled customs data (CEPII BACI), by value. The data holds only the largest flows of each material, so this is not the country’s full trade.

0 sites, deposits and projects on record are listed with the map in the Overview →

Money

What the trade data and the World Bank record in money terms. Every value is a reported figure with its own year.

All recorded trade flows of 2024 under the customs codes that isolate one of the atlas's materials, by value (CEPII BACI, reconciled estimates, current US dollars). Codes that mix several materials are left out, so trade in those materials is understated; gallium, germanium and helium have no usable code at all. Each material lists its five largest partners. Why trade data blurs some materials

Exports of the atlas's materials

$394Min 2024, with 16 partner countries

Imports of the atlas's materials

$4.9Min 2024, with 13 partner countries

The economy around mining

World Bank indicators. Each has its own latest year, shown next to the value; mineral rents are often several years old.

  • GDP (current US$)

    $12bn

    Year 2025

  • Mineral rents (% of GDP)

    4.9%

    Year 2021

  • Ores and metals exports (% of merchandise exports)

    26%

    Year 2025

Government revenue from extractives

EITI, reported

What government agencies reported receiving from extractive companies, per fiscal year, as the Extractive Industries Transparency Initiative (EITI) publishes it in US dollars. A total covers every sector the country's report covers and is not split by mineral.

$31Mlatest reported fiscal year, 2021

Sectors in the report: mining, oil, gas · Period: 2021-01-01 – 2021-12-31

All 12 reported years
Fiscal yearGovernment revenue (US$)Sectors in the reportCountry fileSource
20212021-01-01 – 2021-12-3130 714 353mining, oil, gassummary file
20202020-01-01 – 2020-12-3126 760 467mining, oil, gassummary file
20192019-01-01 – 2019-12-3123 979 673mining, oil, gassummary file
20182018-01-01 – 2018-12-3121 027 726mining, oil, gassummary file
20172017-01-01 – 2017-12-3124 340 927mining, oil, gas—
20162016-01-01 – 2016-12-3121 396 522mining, oil, gassummary file
20152015-01-01 – 2015-12-3128 370 057mining, oil, gassummary file
20142014-01-01 – 2014-12-3130 084 968mining, oil, gassummary file
20132013-01-01 – 2013-12-3143 058 025not statedsummary file
20122012-01-01 – 2012-12-3129 273 716mining, oilsummary file
20112011-01-01 – 2011-12-3131 743 818mining, oilsummary file
20102010-01-01 – 2010-12-3156 755 859mining, oilsummary file

EITI reports lag by two to four years. The figure is the report's own total and is not adjusted for inflation. Republished under EITI's Content Use Policy with credit to the EITI International Secretariat, eiti.org. These figures are kept in a file of their own and are not part of the atlas's ODbL data. EITI open data

Investment pipeline

announced figures

Planned and under-construction projects in Togo with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

No data yet. The atlas has read no announcement of this kind for a project in Togo. The list is short and hand-read; a missing project is missing from the list, not from the world.

A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds of Togo's government, as dated policy events of the type "public support". Each is one statement by its publisher.

No data yet. The atlas has read no public support instrument of Togo's government. The list is short and hand-read.

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Emissions intensity of the country's electricity grid.

    421gCO2e/kWh

    2024Reported

    Higher than 46% of the other 208 countries with a grid figure.

    • It describes the national grid, not mining or refining. Sites may run on their own power.
  • Water

    Share of the country's mine sites on record that lie in high or extremely high baseline water stress.

    No mine or brine site with a water-stress class is on record in this country.

    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining in the country, every commodity together.

    5km²

    2019Estimated

    Higher than 18% of the other 143 countries with a mapped mining area.

    • Rank 118 of 144 countries by area.
    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per country: recycling rates in the atlas are published per material, for the EU as a whole.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by this country for the materials in the atlas.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

Gaps

What the atlas is missing for Togo

Computed from the data. Each line names a record that exists and one that does not. It marks missing data, not missing industry.

  • Listed as a phosphate rock producer (0.6% of world output; Mine production, 2025), but no mine is on record.
  • A phosphate rock producer (0.6% of world output; Mine production, 2025), but no site record names an owner or operator.
  • Trade is partial by design: the atlas holds only each material's largest flows. 2 of them name this country.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

The mining-area figure comes from a share-alike source (CC-BY-SA-4.0). It is kept in its own file under that licence, apart from the rest of the atlas's data.

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Report an error or suggest something

Type the name of a material, a country, a site or a company.