OpenOrebeta

Germany

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

Germany refined 2.1% (USGS) of the world's copper in 2025 (estimated).

2.1%

of the world's copper refining in 2025 (estimated), according to USGS

#8 in copper refiningANNUAL 2025

  • Materials with a production share

    3

    with a mining or refining share on record

  • Sites on record

    1

    Mines and plants in the open sources. Coverage is partial.

  • Exports of the ten materials

    $2bn

    2024; most of it copper; 113 partner countries

  • Grid emissions intensity

    334gCO2e/kWh

    2025

Overview

What it produces

Share of world output, per material and stage. Each bar is one source's figure; where two sources report the same stage, both are shown and never blended. A full-width bar would be 100%.

  • Copper· Refine

    • 2.1%#8 in copper refiningUSGS, 2025 (estimated) · 610 kt

      Rank 8 of the 17 countries with a figure in this USGS table.

  • Lithium· Refine

    • 0.9%#5 in lithium refiningIEA, 2025 · 3 kt Li

      Rank 5 of the 6 countries with a figure in this IEA table.

  • Graphite· Refine

    • 0.2%#5 in graphite refiningIEA, 2025 · 5 kt

      Rank 5 of the 6 countries with a figure in this IEA table.

  • Graphite· Mine

    • 0%#18 in graphite miningUSGS, 2025 (estimated) · 140 t

      Rank 18 of the 18 countries with a figure in this USGS table.

Key facts

Country code
DEU
GDP
$5.05tn (2025)
Mineral rents, share of GDP
0% (2021)
Ores and metals, share of goods exports
2.9% (2025)
Mining area, all commodities
551 km² (2019; rank 24 of 144)
Named in the sources as
Fed. Rep. of Germany (...1990)

Money →Sustainability →Risks & policy →

Map

Basemap: Natural Earth (public domain)
  • Germany
  • Mine or brine operation
  • Processing site

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

Sites on record · 1

1 of 1 shown

One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.

Country in context

Copper: Refinery production, 2025 (estimated). All rows come from the same table.

Country in context: Copper, Refinery production, 2025
Countrythousand metric tonsShare of worldSource
GermanyThis country6102.1 %
ChinaLargest producer in the table14 00048.3 %
World totalWorld total as the source gives it29 000–

Supply chain

Every figure the sources give for this country, its trade partners per material, and where its sites are.

Production, refining and reserves

The latest year of each series. Share is of the series total: the larger of the source world total and the sum of its rows. Rank counts only the countries that have a number in that series.

Production, refining and reserves: Germany
SeriesAmountShare of worldSource
Lithium: Chemicals (IEA)2025 · IEA GCMO 2026 · rank 5 of 63 kt Li0.9 %
Copper: Mine production2025 (estimated) · USGS MCS 2026Nil (—) in source–
Copper: Refinery production2025 (estimated) · USGS MCS 2026 · rank 8 of 17610 kt2.1 %
Copper: Reserves2025 · USGS MCS 2026Nil (—) in source–
Graphite: Mine production2025 (estimated) · USGS MCS 2026 · rank 18 of 18140 t0.0 %
Graphite: Refined battery-grade supply (IEA)2025 · IEA GCMO 2026 · rank 5 of 65 kt0.2 %
Graphite: Reserves2025 · USGS MCS 2026Less than half a unit–

Mines and plants listed without coordinates · 6

The USGS Minerals Yearbook names these operations in Germany with company, place and annual capacity, but gives no coordinates, so they are not on the map. Capacity is not production. Each row is from the chapter year shown.

Material and productKindCompany, as listedPlace, as listedAnnual capacityYearSource
CopperCopper, refinedPlantAurubis AG (Salzgitter AG, 25%; institutional investors, 45%; other private investors, 30%)Primary smelter and refinery and secondary plant at Hamburg500 thousand metric tons per year2019
CopperCopper, refinedPlantHüttenwerke Kayser AG (Aurubis AG, 100%)Secondary plant and refinery at Luenen210 thousand metric tons per year2019
GalliumGalliumNot specifiedIngal Stade GmbH (5N Plus Inc., 50%, and Molycorp Inc., 50%)Ingal plant at Stade35 metric tons per year2019
GalliumGalliumNot specifiedPPM Pure Metals GmbH1 (Recylex S.A., 100%)Plant at Langelsheimnot given2019
GraphiteGraphite, manufacturedNot specifiedGK Graphit Kropfmühl GmbH (Advanced Metallurgical Group N.V., 100%)Plant at Kropfmuehl, Passau20 thousand metric tons per year2019
GraphiteGraphite, manufacturedNot specifiedGK Graphit Kropfmühl GmbH (Advanced Metallurgical Group N.V., 100%)Plants at Bad Godesberg and Wedel, Holstein8 thousand metric tons per year2019

Trade partners

1 recorded flow, 2024

Basemap: Natural Earth (public domain)
  • Recorded trade flow; a thicker line is a larger value
  • Germany

Lines join the middle of each country. They are not shipping routes.

Recorded trade flows of Germany: Copper
PartnerMaterialYearValue, US$Source
Import fromBulgariaCopperProcess2024$1.2bn

Reconciled customs data (CEPII BACI), by value. The data holds only the largest flows of each material, so this is not the country’s full trade.

1 sites, deposits and projects on record are listed with the map in the Overview →

Money

What the trade data and the World Bank record in money terms. Every value is a reported figure with its own year.

All recorded trade flows of 2024 under the customs codes that isolate one of the ten materials, by value (CEPII BACI, reconciled estimates, current US dollars). Codes that mix several materials are left out, so trade in those materials is understated; gallium and germanium have no usable code at all. Each material lists its five largest partners. Why trade data blurs some materials

Exports of the ten materials

$2bnin 2024, with 113 partner countries

Imports of the ten materials

$9.6bnin 2024, with 81 partner countries

The economy around mining

World Bank indicators. Each has its own latest year, shown next to the value; mineral rents are often several years old.

  • GDP (current US$)

    $5.05tn

    Year 2025

  • Mineral rents (% of GDP)

    0%

    Year 2021

  • Ores and metals exports (% of merchandise exports)

    2.9%

    Year 2025

Government revenue from extractives

EITI, reported

What government agencies reported receiving from extractive companies, per fiscal year, as the Extractive Industries Transparency Initiative (EITI) publishes it in US dollars. A total covers every sector the country's report covers and is not split by mineral.

$844Mlatest reported fiscal year, 2022

Sectors in the report: mining, oil, gas · Period: 2022-01-01 – 2022-12-31

All 7 reported years
Fiscal yearGovernment revenue (US$)Sectors in the reportCountry fileSource
20222022-01-01 – 2022-12-31843 905 719mining, oil, gassummary file
20212021-01-01 – 2021-12-31255 044 193mining, oil, gassummary file
20202020-01-01 – 2020-12-31224 215 204mining, oil, gassummary file
20192019-01-01 – 2019-12-31559 152 307mining, oil, gassummary file
20182018-01-01 – 2018-12-31759 825 044mining, oil, gassummary file
20172017-01-01 – 2017-12-31538 479 849mining, oil, gassummary file
20162016-01-01 – 2016-12-31338 870 104mining, oil, gassummary file

EITI reports lag by two to four years. The figure is the report's own total and is not adjusted for inflation. Republished under EITI's Content Use Policy with credit to the EITI International Secretariat, eiti.org. These figures are kept in a file of their own and are not part of the atlas's ODbL data. EITI open data

Investment pipeline

announced figures

Planned and under-construction projects in Germany with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

  • Lithium Hydroxide Converter GubenPlannedProcessing

    Rock Tech Guben GmbH · Guben, Brandenburg · Lithium

    “fully permitted; CapEx estimate updated” · status as printed on 2025-10-23

    Announced capital cost

    EUR 680 M2025-10-23

    CapEx for commissioning the facility (management estimate) · Rock Tech Lithium Inc.

    The publisher's words: “management now estimates the CapEx for commissioning the facility at approximately €680 million, compared to the prior estimate of €730 million”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 24)” · 2025-03-25

      European Commission

      The publisher's words: “Lithium Hydroxide Converter Guben is an ongoing processing project in Germany. The project promoted by Rock Tech Guben GmbH”
    • EUR 90 MGrant · “has issued an LOI committing up to” · 2024-06-27

      Brandenburg’s Ministry for Economic Affairs, Labour and Energy

      The publisher's words: “Brandenburg’s Ministry for Economic Affairs, Labour and Energy has issued an LOI committing up to 90 million EUR in grants”
    • EUR 10 MGrant · “application for federal funding has been confirmed” · 2024-12-31

      German Railway Authority

      The publisher's words: “application for federal funding from the German Railway Authority has been confirmed and will provide a contribution of another 10 million Euros in grants”

    Later statements

    • Brandenburg’s Ministry for Economic Affairs, Labour and Energy: The LOI expired on December 31, 2024.2024-12-31

      The publisher's words: “The LOI expired on December 31, 2024.”
  • Zero Carbon Lithium (Phase One Lionheart Project)Under constructionMine and processing

    Vulcan Energie Ressourcen GmbH · Upper Rhine Valley · Lithium

    “Final Investment Decision in December 2025, when construction activities officially commenced” · status as printed on 2026-05-27

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 47)” · 2025-03-25

      European Commission

      The publisher's words: “Zero Carbon Lithium is an ongoing extraction project in Germany. The project promoted by Vulcan Energie Ressourcen GmbH”
    • EUR 150 MEquity · “is investing up to” · 2026-09-09

      Raw Materials Fund (managed by KfW, under the Germany Fund)

      The publisher's words: “Raw Materials Fund, under the umbrella of the Germany Fund, is investing up to EUR 150 million in the implementation of the ambitious Lionheart project”

    Linked, not quoted (the publisher's terms forbid reuse, so no figure is taken from the page): European Investment Bank

A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds of Germany's government and of the European Union, as dated policy events of the type "public support". Each is one statement by its publisher.

  • 2025-12-03announced · European UnionFundannounced

    The Commission adopted the RESourceEU Action Plan: project financing, a European Critical Raw Materials Centre, joint purchasing through the Raw Materials Platform and a stockpiling pilot.

    EUR 3 bn · “up to €3 billion over the next 12 months”

    Covers: “critical raw materials, such as rare earth elements, cobalt or lithium” · Materials: Rare earths, Cobalt, Lithium

    European Union instrument; applies through membership

    The publisher's words: “The EU will mobilise up to €3 billion over the next 12 months to support concrete projects”
    5 further statements from the source

    adoption

    The publisher's words: “The European Commission has adopted today the RESourceEU Action Plan”

    European Critical Raw Materials Centre planned

    The publisher's words: “In early 2026, the Commission will set up a European Critical Raw Materials Centre”

    joint purchasing and offtake via the Raw Materials Platform

    The publisher's words: “the Raw Materials Platform will facilitate the efforts of the companies to aggregate demand, jointly purchase strategic raw materials and secure offtake agreements”

    stockpiling pilot

    The publisher's words: “with a pilot scheme set to become operational in early 2026”

    materials named

    The publisher's words: “secure the EU's supply of critical raw materials, such as rare earth elements, cobalt or lithium”
  • 2024-05-23in force from · European UnionJoint purchasingin force

    The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.

    Covers: “strategic raw materials” · Materials: Cobalt, Copper, Gallium, Germanium, Lithium, Graphite, Nickel, Rare earths, Tungsten

    European Union instrument; applies through membership

    The publisher's words: “The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union”
    2 further statements from the source

    joint negotiation of purchases allowed (Article 25(5))

    The publisher's words: “may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement”

    coordination of strategic stocks (Article 23)

    The publisher's words: “shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials”

Mining companies headquartered here · 47

Companies that Wikidata places in the mining industry with headquarters in Germany, for every commodity, not only the ten materials. Wikidata is edited by volunteers: entries may be missing or out of date, and each name links to its item. A listing names an exchange and a ticker; it is not a price.

CompanyHeadquartersStock listingLEISource
Aktien-Gesellschaft des Altenbergs für Bergbau und ZinkhüttenbetriebEssen——
Aktiengesellschaft Sächsische WerkeDresden——
Altenberg PingeAltenberg——
Amberger Kaolinwerke Eduard KickHirschau——
AMG Graphite GKKropfmühl——
Anhaltische KohlenwerkeBerlin——
Aurubisnamed at 2 sites or listed plants, itself or through a subsidiaryHamburg—5299005SHIN9ZK7GW242
Barbara ErzbergbauPorta Westfalica——
Bergbau AG Ewald - König LudwigHerten——
Bergbau AG LothringenGerthe; Hanover——
Bergbaugesellschaft TeutoniaHanover——
Bergwerksgesellschaft HiberniaDüsseldorf; Herne——
Bergwitzer BraunkohlenwerkeBergwitz——
Braunkohlenwerke BornaBorna——
Deusa InternationalBleicherode—391200G6POQWY8LN4074
Deutsche RohstoffHeidelberg—529900NNSQCX28FWBW79
Deutscher Braunkohlen-Industrie-VereinCologne——
Doggererz AGBlumberg——
EEW Energy from WasteHelmstedt—529900YYYN57F8GSXH16
Eschweiler Bergwerks-VereinKohlscheid——
Franz Haniel & Cie.Duisburg—529900VHM89GUAJ1RK35
Gesellschaft für Braunkohlen- und MineralölforschungCharlottenburg——
Gewerkschaft CarolineDortmund——
Gewerkschaft Gottes SegenOelsnitz, Erzgebirge——
Görig & NeimkeAlfeld——
Grube Auguste bei BitterfeldBitterfeld——
Grube LeopoldBitterfeld——
Harpen AGDortmund——
Hubertus Braunkohlen-AktiengesellschaftBrüggen——
Mannesmann-Marokko-VerwertungsgesellschaftWilmersdorf——
Mansfeldscher KupferschieferbergbauEisleben——
MIBRAGTheißen—AZRVNGVSGXDPXX1EOQ91
mining in MansfeldEisleben——
Niederrheinische BraunkohlenwerkeRheydt——
Ostafrikanische Bergwerks- und Plantagen GesellschaftBezirk Mitte——
RAG AktiengesellschaftEssen—529900CTCY5IXJUY9Z41
Rheinisch-Westfälisches Kohlen-SyndikatEssen——
RoddergrubeBrühl——
RomontaAmsdorf—529900WDVR5BJN5QMW27
Sachtleben ChemieDuisburg——
Schieferwerk LotharheilGeroldsgrün——
Stolberger ZinkStolberg——
Südanatolische Bergbau AGMünchen——
Thüringer RohstoffWeimar——
Thyssen SchachtbauMülheim an der Ruhr—52990055I3GPKH3EXE57
Zeche Friedrich HeinrichKamp-Lintfort——
Zeche Graf SchwerinCastrop-Rauxel——

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Emissions intensity of the country's electricity grid.

    334gCO2e/kWh

    2025Reported

    Higher than 38% of the other 208 countries with a grid figure.

    • It describes the national grid, not mining or refining. Sites may run on their own power.
  • Water

    Share of the country's mine sites on record that lie in high or extremely high baseline water stress.

    No mine or brine site with a water-stress class is on record in this country.

    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining in the country, every commodity together.

    551km²

    2019Estimated

    Higher than 84% of the other 143 countries with a mapped mining area.

    • Rank 24 of 144 countries by area.
    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of demand.

    Not available per country: recycling rates in the atlas are published per material, for the EU as a whole.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

USGS Table 4 lists no export control by this country for the materials in the atlas.

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

Gaps

What the atlas is missing for Germany

Computed from the data. Each line names a record that exists and one that does not. It marks missing data, not missing industry.

  • Listed as a lithium refiner (0.9% of world output; Chemicals (IEA), 2025), but no processing plant is on record.
  • Listed as a copper refiner (2.1% of world output; Refinery production, 2025), but no processing plant is on record.
  • Listed as a graphite producer (0% of world output; Mine production, 2025), but no mine is on record.
  • Listed as a graphite refiner (0.2% of world output; Refined battery-grade supply (IEA), 2025), but no processing plant is on record.
  • A graphite producer (0% of world output; Mine production, 2025), but no site record names an owner or operator.
  • Trade is partial by design: the atlas holds only each material's largest flows. 32 of them name this country.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

The mining-area figure comes from a share-alike source (CC-BY-SA-4.0). It is kept in its own file under that licence, apart from the rest of the atlas's data.

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Type the name of a material, a country, a site or a company.