China refined 94% (IEA) of the world's graphite in 2025; China mined 78% (USGS).

94%

of the world's graphite was refined in China in 2025, according to IEA · about 9 in 10

ANNUAL 2025

  • Leading mining country

    78%

    China, 2025 (estimated), USGS

  • Leading refining country

    94%

    China, 2025, IEA

  • Sites on record

    17

    Mines and plants in the open sources. Coverage is partial. Also on record: 38 deposits and projects, which are not counted.

Overview

Battery-grade graphite is either mined (natural flake, shaped into spherical graphite) or made synthetically from petroleum coke. It is the main anode material in lithium-ion batteries.

Map

Basemap: Natural Earth (public domain)
  • Share of world mine output
  • Mine or brine operation
  • Processing site
  • Deposit or project (not a mine or a plant yet)

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

2025

Key facts

Group
Battery materials
Stages in the atlas
Reserves · Mine · Refine · Component · Recycle
World mine production, 2025
1 800 000 metric tons (estimated)
World refinery production, 2025
2 266 kt
Open price series
None

Open on the globe →Flow diagram →

Leading countries

Mine · USGS, 2025 (estimated)

  1. Chinaabout 4 in 578%
  2. Madagascarabout 1 in 204.4%
  3. Tanzaniaabout 1 in 204.2%
  4. Brazilabout 1 in 203.6%
  5. Mozambiqueabout 1 in 203.3%

Refine · IEA, 2025

  1. Chinaabout 9 in 1094%
  2. Japanabout 1 in 203%
  3. Indonesia1.4%
  4. Korea0.2%

The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.

What the source does not cover

  • No open price series for graphite: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.

Supply chain

Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.

Reserves

Concentration

ANNUAL 2025

China holds about 1 in 3 (32 %) of the world's graphite reserves recorded here.

Reserves · 2025

(Data in metric tons unless otherwise specified)

Top 3 countries
64.8 %
China, Brazil, Madagascar

Who holds what

Mine

Concentration

ANNUAL 2025

China mines about 4 in 5 (78 %) of the world's graphite recorded here.

Mine production · 2025 (estimated)

(Data in metric tons unless otherwise specified)

Top 3 countries
86.4 %
China, Madagascar, Tanzania

Who holds what

Refine

Concentration

ANNUAL 2025

China refines about 9 in 10 (94 %) of the world's graphite recorded here.

Refined battery-grade supply (IEA) · 2025

kt = kilotonnes. Refined battery-grade supply includes spherical graphite made from natural flake graphite and synthetic anode production.

Top 3 countries
98.8 %
China, Japan, Indonesia

Who holds what

Component

No data yet: Graphite, component stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Recycle

No data yet: Graphite, recycle stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Flow through the stages

Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.

Source for the country shares:One source at a time; figures from two sources are never mixed.

The diagram is wider than this screen. Swipe it sideways to see every stage.

MineMining (natural graphite) (IEA) · 2025In trade flows only (no row in this table)RefineRefined battery-grade supply (IEA) · 2025In trade flows only (no row in this table)ComponentNo open record ofcomponent production bycountryIn trade flows only (no row in this table)China → Malaysia: 338.7 million USD, 2024China → USA: 265.2 million USD, 2024China → 10 more countries: 244.4 million USD, 2024China → Hungary: 164.4 million USD, 2024China → Poland: 147 million USD, 2024China → Rep. of Korea: 91.8 million USD, 2024Japan → China: 53.6 million USD, 2024China → United States: 45.1 million USD, 2024United States → 10 more countries: 44.8 million USD, 2024China → Japan: 44.7 million USD, 2024China → Korea: 39.7 million USD, 2024France → 10 more countries: 35.8 million USD, 2024Korea → USA: 33.9 million USD, 2024Japan → Rep. of Korea: 26.8 million USD, 2024Japan → 10 more countries: 26 million USD, 2024Mexico → USA: 25.8 million USD, 2024Germany → 10 more countries: 25.7 million USD, 2024Germany → China: 21.6 million USD, 2024Japan → USA: 19.7 million USD, 2024United States → China: 19.3 million USD, 2024Korea → Poland: 19.2 million USD, 2024United States → Rep. of Korea: 16.2 million USD, 2024China → Poland: 15.1 million USD, 2024Spain → 10 more countries: 14.9 million USD, 2024Madagascar → India: 14.7 million USD, 2024China → Germany: 14.5 million USD, 2024Canada → United States: 14.2 million USD, 2024Switzerland → China: 13.8 million USD, 2024Korea → China: 13.7 million USD, 2024Poland → 10 more countries: 13 million USD, 2024Germany → USA: 12.7 million USD, 2024Tanzania → China: 12.1 million USD, 2024China 80.4 %Madagascar 3.9 %Mozambique 3.8 %Brazil 3.6 %Tanzania 3.5 %Russia 1.6 %Other / not attributed 3.3 %CanadaChina 94.4 %Japan 3.0 %Indonesia 1.4 %United States 0.6 %Korea 0.2 %Germany 0.2 %Other / not attributed 0.2 %FrancePolandMexicoSpainIndiaSwitzerlandUSAMalaysiaPolandHungaryRep. of KoreaChina10 more countriesRecycling loop: no published rateEurostat publishes no end-of-life recycling input rate for graphite.
  • Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025Refine 2025
  • Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 3 319 flows, covering 66.1 % of traded value.
  • Dashed band: the customs code mixes grades or forms, so the stage of the product is uncertain. The table marks these with ≈.
  • Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
  • Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
  • Dashed return arrow: no published recycling rate. Eurostat publishes no end-of-life recycling input rate for graphite.
Table of what is drawn (28 country marks, 40 trade flows)
Country shares per stage, from IEA GCMO 2026.
StageCountryShareAmountSource
Mine 2025China80.4 %1 432 kt
Mine 2025Madagascar3.9 %70 kt
Mine 2025Mozambique3.8 %67 kt
Mine 2025Brazil3.6 %64 kt
Mine 2025Tanzania3.5 %62 kt
Mine 2025Russia1.6 %28 kt
Mine 2025Other / not attributed3.3 %58 ktthe source's own "other" row
Refine 2025China94.4 %2 139 kt
Refine 2025Japan3.0 %68 kt
Refine 2025Indonesia1.4 %32 kt
Refine 2025United States0.6 %13 kt
Refine 2025Korea0.2 %5 kt
Refine 2025Germany0.2 %5 kt
Refine 2025Other / not attributed0.2 %3 ktthe source's own "other" row
Recorded trade flows drawn as bands, by value, 2024. ≈ marks a customs code that mixes grades or forms.
Product of stageFrom → toMillion USDSource
Refine ≈China → Malaysia338.7
Refine ≈China → USA265.2
Refine ≈China → Hungary164.4
Refine ≈China → Poland147
Refine ≈China → Rep. of Korea91.8
Refine ≈China → Japan78.2
Refine ≈Japan → China53.6
Mine ≈China → USA45.1
Refine ≈China → India44.8
Mine ≈China → Japan44.7
Refine ≈China → Fed. Rep. of Germany (...1990)39.8
Mine ≈China → Rep. of Korea39.7
Refine ≈France → Fed. Rep. of Germany (...1990)35.8
Refine ≈China → Indonesia35.4
Refine ≈Rep. of Korea → USA33.9
Refine ≈Japan → Rep. of Korea26.8
Refine ≈Japan → France26
Refine ≈Mexico → USA25.8
Refine ≈Fed. Rep. of Germany (...1990) → France25.7
Refine ≈Fed. Rep. of Germany (...1990) → China21.6
Refine ≈Japan → USA19.7
Refine ≈USA → China19.3
Refine ≈Rep. of Korea → Poland19.2
Refine ≈USA → Mexico17.2
Refine ≈USA → Rep. of Korea16.2
Refine ≈China → France15.9
Refine ≈China → Iran15.5
Mine ≈China → Poland15.1
Refine ≈Spain → Brazil14.9
Mine ≈Madagascar → India14.7
Refine ≈China → Viet Nam14.7
Mine ≈China → Fed. Rep. of Germany (...1990)14.5
Mine ≈Canada → USA14.2
Refine ≈USA → Canada13.9
Refine ≈Switzerland → China13.8
Refine ≈Rep. of Korea → China13.7
Refine ≈USA → Japan13.7
Refine ≈Poland → Japan13
Refine ≈Fed. Rep. of Germany (...1990) → USA12.7
MineUnited Rep. of Tanzania → China12.1

Countries drawn as dashed boxes (in trade flows only)

  • Mine: Canada
  • Refine: France; Poland; Mexico; Spain; India; Switzerland
  • Component: USA; Malaysia; Poland; Hungary; Rep. of Korea; China; 10 more countries (Japan, Fed. Rep. of Germany (...1990), France, India, Indonesia, Mexico, Iran, Brazil, Viet Nam, Canada)

Recycling loop

Recycling loop: no published rate. Eurostat publishes no end-of-life recycling input rate for graphite.

Largest trade flows · 2024

Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 3 319 flows shown, covering 66.1 % of traded value.

Largest trade flows 2024
From → toProduct of stageMillion USDSource
China → MalaysiaRefine ≈338.7
China → USARefine ≈265.2
China → HungaryRefine ≈164.4
China → PolandRefine ≈147
China → Rep. of KoreaRefine ≈91.8
China → JapanRefine ≈78.2
Japan → ChinaRefine ≈53.6
China → USAMine ≈45.1
China → IndiaRefine ≈44.8
China → JapanMine ≈44.7

≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.

Sites on record · 17 and 38 deposits and projects

55 of 55 shown

  • AlbanyProject (not producing yet) · Canada
  • Balama Graphite ProjectMine · Mozambique
  • Battery Material PlantProject (not producing yet) · Canada
  • Bissett CreekProject (not producing yet) · Canada
  • BurkeDeposit (no mine) · Australia
  • CampoonaDeposit (no mine) · Australia
  • Coated Spherical Purified Graphite (CSPG) RefineProject (not producing yet) · Canada
  • Collie-BAMProcessing plant · Australia
  • CorellaDeposit (no mine) · Australia
  • CroydonDeposit (no mine) · Australia
  • Demonstration-Perth-GrProcessing plant · Australia
  • Demonstration-Townsville-BAMProcessing plant · Australia
  • EsmeraldaDeposit (no mine) · Australia
  • Graphite BullDeposit (no mine) · Australia
  • GropaboDeposit (no mine) · Sweden
  • ItapecericaMine and processing plant · Brazil
  • KearneyProject (not producing yet) · Canada
  • Kearney Mine (Decomissioned)Mine · Canada
  • Kookaburra GullyDeposit (no mine) · Australia
  • KoppioDeposit (no mine) · Australia
  • La LoutreProject (not producing yet) · Canada
  • Lac Carheil (Lac Rainy Graphite)Project (not producing yet) · Canada
  • Lac KnifeProject (not producing yet) · Canada
  • Lac-des-ÎlesMine · Canada
  • LacromaDeposit (no mine) · Australia
  • LeliynDeposit (no mine) · Australia
  • Lourdes MineMine · Mexico
  • MaiquiniqueMine · Brazil
  • MånsbergDeposit (no mine) · Sweden
  • MatawinieProject (not producing yet) · Canada
  • Mateus LemeMine · Brazil
  • MattsmyraDeposit (no mine) · Sweden
  • McIntoshDeposit (no mine) · Australia
  • MillerProject (not producing yet) · Canada
  • Miniera MurialdoMine · Italy
  • Miniera MurialdoMine · Italy
  • Mount DromedaryDeposit (no mine) · Australia
  • MunglinupDeposit (no mine) · Australia
  • Niska LinkDeposit (no mine) · Sweden
  • Niska NorthDeposit (no mine) · Sweden
  • Niska SouthDeposit (no mine) · Sweden
  • Nunasvaara EastDeposit (no mine) · Sweden
  • Nunasvaara NorthDeposit (no mine) · Sweden
  • Nunasvaara SouthDeposit (no mine) · Sweden
  • OarDeposit (no mine) · Australia
  • Pedra AzulMine and processing plant · Brazil
  • Salto da DivisaMine and processing plant · Brazil
  • San Juan MineMine · Mexico
  • SiviourProject (not producing yet) · Australia
  • Siviour-BAMProcessing plant · Australia
  • SpringdaleDeposit (no mine) · Australia
  • Topiyeca MineMine · Mexico
  • UatnanProject (not producing yet) · Canada
  • Uley 2Project (not producing yet) · Australia
  • Wilclo SouthDeposit (no mine) · Australia

One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.

United States view: Graphite

These figures describe the United States only. They are not global figures.

Net import reliance · 2025
100 %
Import sources · 2021-24
  • China46 %
  • Canada13 %
  • Mozambique13 %
  • Mexico12 %
  • Other16 %
Main uses
  • Batteries, fuel cells, and lubricants.

Money

The open price series where one exists, and one estimate with its formula. No licensed market data is shown.

Price

There is no open price series for graphite, so the atlas shows no price and no estimated value.

  • No open price series for graphite: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.

An estimated production value is computed only where an open price exists (copper and nickel). Why prices are missing

Investment pipeline

announced figures

Planned and under-construction graphite projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

  • Talga Natural Graphite ONE (Vittangi Anode Project)PlannedMine and processing

    Talga AB · northern Sweden · Sweden · Graphite

    “FINANCIAL CLOSE DATE 31 January, 2028; ENTRY INTO OPERATION DATE 31 December, 2030 (Innovation Fund fiche for the anode refinery part)” · status as printed on 2026-10-02

    Announced capital cost

    EUR 560 M2024-04-15

    capital costs for the construction of the vertically integrated operation (excluding €39m contingency) · Talga Group Ltd

    The publisher's words: “capital costs for the construction of the vertically integrated operation are now estimated at €560 million (excluding €39m contingency)”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 44)” · 2025-03-25

      European Commission

      The publisher's words: “Talga Natural Graphite ONE is an ongoing extraction project in Sweden. The project promoted by Talga AB”
    • EUR 150 MLoan · “board has approved (EIB project page: Approved | 15/06/2023; amount 'not disclosed' there)” · 2023-06-20

      European Investment Bank

      The publisher's words: “board has approved €150 million senior debt funding”
    • EUR 70 MGrant · “AMOUNT OF INNOVATION FUND GRANT (project TalnodeONE, starting date 01 April, 2025)” · 2026-10-02

      EU Innovation Fund

      The publisher's words: “AMOUNT OF INNOVATION FUND GRANT EUR 70,000,000”

    Linked, not quoted (the publisher's terms forbid reuse, so no figure is taken from the page): European Investment Bank

  • Graphite Creek ProjectPlannedMine

    Graphite One Inc. · north of Nome, Alaska · United States · Graphite

    “Management’s current plan is for graphite to be mined” · status as printed on 2025-11-13

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • USD 670 MLetter of interest · “Letter of Interest” · 2026-01-05

      Export-Import Bank of the United States

      The publisher's words: “approving a $670 million Letter of Interest for Graphite One Inc. (G1) to support financing of the Company's Graphite Creek Project”
    • no amount statedLetter of interest · “non-binding and conditional and does not represent a financing commitment” · 2025-12-18

      Export-Import Bank of the United States

      The publisher's words: “Investors should be aware that the LoI is non-binding and conditional and does not represent a financing commitment.”
    • USD 37.5 MGrant · “drew down the remaining” · 2025-11-13

      U.S. Department of Defense (Defense Production Act)

      The publisher's words: “the U.S. Department of Defense’s $37.5 million Technology Investment Agreement grant under the Defense Production Act”

A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names graphite, and general critical-minerals instruments (marked). Each is one statement by its publisher.

  1. 2024-05-23in force from · European UnionJoint purchasingin force

    The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.

    Covers: “strategic raw materials” · Materials: Cobalt, Copper, Gallium, Germanium, Lithium, Graphite, Nickel, Rare earths, Tungsten

    The publisher's words: “The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union”
    2 further statements from the source

    joint negotiation of purchases allowed (Article 25(5))

    The publisher's words: “may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement”

    coordination of strategic stocks (Article 23)

    The publisher's words: “shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials”
  2. 2025-06-17announced · G7Other supportannounced

    G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.

    Covers: “critical minerals”

    critical minerals in general; the source does not name graphite

    The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
    3 further statements from the source

    launch of the plan

    The publisher's words: “We are launching a G7 Critical Minerals Action Plan”

    roadmap content

    The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”

    capital mobilisation

    The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
  3. 2025-11-04published · CanadaFundannounced

    Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.

    CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”

    Covers: “critical minerals projects and companies”

    critical minerals in general; the source does not name graphite

    The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
    3 further statements from the source

    tools of the fund

    The publisher's words: “including equity investments, loan guarantees, and offtake agreements”

    First and Last Mile Fund

    The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”

    absorbs the Critical Minerals Infrastructure Fund

    The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
  4. 2025-11-22published · United KingdomFundannounced

    The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.

    GBP 50 M · “up to £50 million”

    Covers: “critical mineral projects in the UK”

    critical minerals in general; the source does not name graphite

    The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
    2 further statements from the source

    stockpiling under consideration

    The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”

    later programme page (published 22 June 2026): grant share

    The publisher's words: “with £45 million of this available as grant funding”
  5. 2026-01-14signed · United StatesPrice floorannounced

    Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.

    Covers: “processed critical minerals and their derivative products (PCMDPs)”

    critical minerals in general; the source does not name graphite

    The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
  6. 2026-02-02announced · United StatesStockpileannounced

    The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.

    USD 10 bn · “a Direct Loan of up to $10 billion”

    Covers: “essential raw materials”

    critical minerals in general; the source does not name graphite

    The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
    4 further statements from the source

    what it establishes

    The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”

    storage

    The publisher's words: “that will store essential raw materials in facilities across the United States”

    borrower structure

    The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”

    later EXIM release of May 4, 2026 restating the loan

    The publisher's words: “The transaction includes a direct loan of up to $10 billion”

There is no open price series for graphite, so these instruments are listed without a chart.

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.

    528gCO2e/kWh

    2025Estimated

    Higher than 67% of the other 6 materials with a computed proxy.

    • Covers the countries behind 100% of refinery output (Refined battery-grade supply (IEA), 2025).
    • Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
  • Water

    Share of the material's mine sites on record that lie in high or extremely high baseline water stress.

    23%of mine sites on record

    2023Estimated

    Higher than 86% of the other 7 materials with rated mine sites.

    • 3 of 13 sites with a class (13 mine and brine sites on record).
    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per material: the area is mapped per country for all commodities together.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of EU demand (end-of-life recycling input rate).

    No published rate for this material.

    • Eurostat publishes no end-of-life recycling input rate for graphite.
    • 4 EU targets apply to this material; they are listed below.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

The figures behind the indicators

Grid-carbon proxy for refining

estimated · proxy

528gCO2e per kWh

Covers the countries behind 99.8% of refinery output (Refined battery-grade supply (IEA), 2025)

CountryShare of refiningGrid intensity
China94.4%5282025
Japan3%4742025
Indonesia1.4%7052025
United States0.6%3842025
Korea0.2%4182025
Germany0.2%3342025

Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.

Water stress where the mines are

estimated · by site

23.1%of mine sites on record lie in high or extremely high water stress (3 of 13)

  • Low (<10%)7 sites
  • Low - Medium (10-20%)1 site
  • Medium - High (20-40%)2 sites
  • Extremely High (>80%)3 sites

Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.

Circularity

Recycling's share of EU demand (end-of-life recycling input rate)

Eurostat publishes no end-of-life recycling input rate for graphite.

EU targets that apply

Read in the original Official Journal version; later amendments are not reflected.

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

  • ▲ BanNamibia2023

    Export ban: Ores and concentrates of cobalt, graphite, lithium, manganese, and rare earths (2023).

    Source ↗
  • ▲ LicenceChina2023

    Export licensing requirement for materials and technologies: Antimony (2024), bismuth (2025), synthesized diamond (2025), gallium (2023), germanium (2023), graphite (2023), indium (2025), magnesium materials (2024), molybdenum (2025), rare earths (2025), silver (2026), tellurium (2025), tungsten (2025), and items related to lithium batteries and artificial graphite anode materials (2025).

    Source ↗

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What if?

Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.

What the atlas does not know about graphite

How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.

Data coverage

Mines on record: 7.4% (4/18)

Plants on record: 0% (0/6)

Owner or operator known: 4.1% (3/18)

Assurance known: no public assurance list is ingested yet

A country in these lists marks missing data, not missing industry.

Mining and refining: who leads

  • IEA GCMO 2026, 2025

    • Mining:China 80% (about 4 in 5), 2025
    • Refining:China 94% (about 9 in 10), 2025

Price transparency

No open price series for graphite: the services that publish one are licensed, so no price is shown.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

Source registry for this material

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Type the name of a material, a country, a site or a company.