Uranium
Nuclear fuel
Watch and Edit are coming soon.
Sites on record
10
Mines and plants in the open sources. Coverage is partial. Also on record: 10 deposits and projects, which are not counted.
Overview
Uranium is mined or leached in place, milled into concentrate, converted and enriched, and made into fuel for nuclear reactors.
Map
- Mine or brine operation
- Processing site
- Deposit or project (not a mine or a plant yet)
Sites are those in the open sources. A site missing here is missing from the sources, not from the world.
Key facts
- Group
- Nuclear fuel
- Stages in the atlas
- Mine · Refine
- Open price series
- None
What the source does not cover
- USGS MCS 2026 publishes no world production table by country for uranium.
- No open price series for uranium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
Supply chain
Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.
Mine
No data yet: Uranium, mine stage
We have no sourced record for this. We never fill gaps with estimates.
Help add it
Refine
No data yet: No open refining data yet for uranium
We have no sourced record for this. We never fill gaps with estimates.
Help add it
Flow through the stages
Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.
The diagram is wider than this screen. Swipe it sideways to see every stage.
- Bar: a country's share of the stage's output. Height is the share. Sources:
- Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 230 flows, covering 99.9 % of traded value.
- Dashed band: the customs code mixes grades or forms, so the stage of the product is uncertain. The table marks these with ≈.
- Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
- Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
Table of what is drawn (18 country marks, 40 trade flows)
| Product of stage | From → to | Million USD | Source |
|---|---|---|---|
| Refine ≈ | Kazakhstan → Russian Federation | 1 812.6 | |
| Refine ≈ | Kazakhstan → China | 1 754.2 | |
| Refine ≈ | Canada → USA | 1 218.9 | |
| Refine ≈ | Canada → Netherlands | 810.4 | |
| Mine | Namibia → China | 803.2 | |
| Refine ≈ | Namibia → China | 702.4 | |
| Refine ≈ | Canada → United Kingdom | 459.7 | |
| Refine ≈ | USA → United Kingdom | 453.8 | |
| Mine | Australia → USA | 431.9 | |
| Refine ≈ | Canada → Fed. Rep. of Germany (...1990) | 401.2 | |
| Refine ≈ | Kazakhstan → USA | 312.7 | |
| Refine ≈ | Kazakhstan → France | 309.1 | |
| Refine ≈ | Australia → Canada | 280.6 | |
| Refine ≈ | USA → Netherlands | 275.9 | |
| Refine ≈ | Kazakhstan → Canada | 247.1 | |
| Refine ≈ | Niger → France | 239.6 | |
| Refine ≈ | Canada → France | 232.5 | |
| Refine ≈ | USA → Fed. Rep. of Germany (...1990) | 229.4 | |
| Refine ≈ | France → Netherlands | 187.3 | |
| Mine | Namibia → France | 138.4 | |
| Refine ≈ | Uzbekistan → France | 122.4 | |
| Refine ≈ | Kazakhstan → Romania | 100.3 | |
| Mine | Namibia → USA | 87.7 | |
| Refine ≈ | Ukraine → Canada | 78.4 | |
| Refine ≈ | France → Fed. Rep. of Germany (...1990) | 64.2 | |
| Refine ≈ | South Africa → Canada | 54.6 | |
| Refine ≈ | France → Russian Federation | 54.5 | |
| Refine ≈ | Canada → Romania | 53 | |
| Mine | Namibia → Canada | 50.3 | |
| Refine ≈ | Namibia → Canada | 46.9 | |
| Mine | Uzbekistan → India | 46.8 | |
| Refine ≈ | Australia → France | 45.7 | |
| Refine ≈ | Russian Federation → Brazil | 35.7 | |
| Refine ≈ | South Africa → USA | 34.5 | |
| Refine ≈ | Canada → Rep. of Korea | 28.2 | |
| Refine ≈ | Australia → Rep. of Korea | 22 | |
| Mine | Canada → France | 13.2 | |
| Refine ≈ | Russian Federation → Netherlands | 9.5 | |
| Mine | Canada → USA | 7.5 | |
| Refine ≈ | Fed. Rep. of Germany (...1990) → Sweden | 4.4 |
Countries drawn as dashed boxes (in trade flows only)
- Mine: Namibia; Australia; Uzbekistan; Canada
- Refine: Kazakhstan; Canada; USA; China; Namibia; France; 8 more countries (Australia, Niger, Uzbekistan, South Africa, Ukraine, India, Russian Federation, Fed. Rep. of Germany (...1990))
- After refining: China; Russian Federation; USA; Netherlands; France; United Kingdom; 6 more countries (Canada, Fed. Rep. of Germany (...1990), Romania, Rep. of Korea, Brazil, Sweden)
Largest trade flows · 2024
Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 230 flows shown, covering 99.9 % of traded value.
| From → to | Product of stage | Million USD | Source |
|---|---|---|---|
| Kazakhstan → Russian Federation | Refine ≈ | 1 812.6 | |
| Kazakhstan → China | Refine ≈ | 1 754.2 | |
| Canada → USA | Refine ≈ | 1 218.9 | |
| Canada → Netherlands | Refine ≈ | 810.4 | |
| Namibia → China | Mine | 803.2 | |
| Namibia → China | Refine ≈ | 702.4 | |
| Canada → United Kingdom | Refine ≈ | 459.7 | |
| USA → United Kingdom | Refine ≈ | 453.8 | |
| Australia → USA | Mine | 431.9 | |
| Canada → Fed. Rep. of Germany (...1990) | Refine ≈ | 401.2 |
≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.
Sites on record · 10 and 10 deposits and projects
20 of 20 shown
- Blind RiverRefinery · Canada
- Cigar LakeMine · Canada
- Energy Resources of AustraliaMine · Australia
- Horseshoe-RavenProject (not producing yet) · Canada
- Key Lake millMine · Canada
- McArthur RiverMine · Canada
- McClean LakeMine · Canada
- MichelinProject (not producing yet) · Canada
- MidwestProject (not producing yet) · Canada
- MillenniumProject (not producing yet) · Canada
- Olympic DamMine · Australia
- PalaboraMine · South Africa
- Patterson Lake SouthProject (not producing yet) · Canada
- Port HopeProcessing plant · Canada
- Rook IProject (not producing yet) · Canada
- RössingMine · Namibia
- RoughriderProject (not producing yet) · Canada
- TåsjöDeposit (no mine) · Sweden
- WaterburyProject (not producing yet) · Canada
- Wheeler RiverProject (not producing yet) · Canada
One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.
United States view: Uranium
These figures describe the United States only. They are not global figures.
- Import sources · 2021-24
- NA100 %
- Main uses
- Nuclear fuel and medical applications.
Money
The open price series where one exists, and one estimate with its formula. No licensed market data is shown.
Price
There is no open price series for uranium, so the atlas shows no price and no estimated value.
- No open price series for uranium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
An estimated production value is computed only where an open price exists for the same product the mine figure counts (copper, nickel, zinc, tin and phosphate rock). Why prices are missing
Investment pipeline
announced figuresPlanned and under-construction uranium projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.
No data yet. The atlas has read no announcement of this kind for a uranium project. The list is short and hand-read; a missing project is missing from the list, not from the world.
A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.
Public support instruments
Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names uranium, and general critical-minerals instruments (marked). Each is one statement by its publisher.
2025-06-17announced · G7Other supportannounced
G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.
Covers: “critical minerals”
critical minerals in general; the source does not name uranium
The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
3 further statements from the source
launch of the plan
The publisher's words: “We are launching a G7 Critical Minerals Action Plan”
roadmap content
The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”
capital mobilisation
The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
2025-11-04published · CanadaFundannounced
Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.
CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”
Covers: “critical minerals projects and companies”
critical minerals in general; the source does not name uranium
The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
3 further statements from the source
tools of the fund
The publisher's words: “including equity investments, loan guarantees, and offtake agreements”
First and Last Mile Fund
The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”
absorbs the Critical Minerals Infrastructure Fund
The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
2025-11-22published · United KingdomFundannounced
The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.
GBP 50 M · “up to £50 million”
Covers: “critical mineral projects in the UK”
critical minerals in general; the source does not name uranium
The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
2 further statements from the source
stockpiling under consideration
The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”
later programme page (published 22 June 2026): grant share
The publisher's words: “with £45 million of this available as grant funding”
2026-01-14signed · United StatesPrice floorannounced
Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.
Covers: “processed critical minerals and their derivative products (PCMDPs)”
critical minerals in general; the source does not name uranium
The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
2026-02-02announced · United StatesStockpileannounced
The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.
USD 10 bn · “a Direct Loan of up to $10 billion”
Covers: “essential raw materials”
critical minerals in general; the source does not name uranium
The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
4 further statements from the source
what it establishes
The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”
storage
The publisher's words: “that will store essential raw materials in facilities across the United States”
borrower structure
The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”
later EXIM release of May 4, 2026 restating the loan
The publisher's words: “The transaction includes a direct loan of up to $10 billion”
There is no open price series for uranium, so these instruments are listed without a chart.
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.
Carbon
Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.
Not computed: No open refining series by country
- Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water
Share of the material's mine sites on record that lie in high or extremely high baseline water stress.
13%of mine sites on record
Higher than 60% of the other 25 materials with rated mine sites.
- 1 of 8 sites with a class (8 mine and brine sites on record).
- Counted by site, not by tonnage: it is not a share of production.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining.
Not available per material: the area is mapped per country for all commodities together.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate).
No published rate for this material.
- Eurostat publishes no end-of-life recycling input rate for uranium.
- No EU target in these two laws names this material.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
The figures behind the indicators
Grid-carbon proxy for refining
estimated · proxyNot computed: No open refining series by country
Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water stress where the mines are
estimated · by site12.5%of mine sites on record lie in high or extremely high water stress (1 of 8)
- Low (<10%)5 sites
- High (40-80%)1 site
- Arid and Low Water Use2 sites
Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate)
Eurostat publishes no end-of-life recycling input rate for uranium.
EU targets that apply
No EU target in these two laws names this material.
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
- ▲ BanRussia2022
Export ban: Steel waste and scrap, tungsten scrap, and enriched uranium (2022).
Source ↗
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
What if?
Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.
What the atlas does not know about uranium
How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.
Data coverage
Mines on record: no open mining series by country
Plants on record: no open refining series by country
Owner or operator known: no open mining series by country
Assurance known: no public assurance list is ingested yet
- Mines: No open mining series by country
- Processing plants: No open refining series by country
- Owners and operators: No open mining series by country
- Assurance: No public assurance list is ingested yet
A country in these lists marks missing data, not missing industry.
Mining and refining: who leads
No open series by country
Price transparency
No open price series for uranium: the services that publish one are licensed, so no price is shown.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- CEPII BACI 202601 ↗40 records used
- Licence
- Etalab Open Licence 2.0
- As of
- 2024
- Confidence
- Estimated
- NRCan critical minerals 2026 ↗9 records used
- Licence
- OGL-Canada-2.0
- As of
- 2026
- Confidence
- Reported
- NRCan Map 900A (2025) ↗6 records used
- Licence
- OGL-Canada-2.0
- As of
- 2025
- Confidence
- Reported
- WU Vienna mine database v1.0.3 ↗4 records used
- Licence
- CC-BY-4.0
- As of
- 2022
- Confidence
- Reported
- SGU mineral resources 2026 ↗1 record used
- Licence
- CC0-1.0
- As of
- 2021
- Confidence
- Reported
- USGS MCS 2026 ↗1 record used
- Licence
- CC0-1.0
- As of
- 2026
- Confidence
- Reported
- WRI Aqueduct 4.0 ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2023
- Confidence
- Estimated
Source registry for this material
- Mineral Commodity Summaries 2026 Data Release ↗, U.S. Geological Survey, National Minerals Information Center. Licence: CC0-1.0. annual (February).
- BACI bilateral trade flows at HS6 (version 202601) ↗, CEPII. Licence: Etalab Open Licence 2.0. annual.
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.
What we don't know yet
No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.
- No open table of uranium production by country.Add data: No open table of uranium production by country.
- Leading mining country: No open mining table by country.Add data: Leading mining country: No open mining table by country.
- Leading refining country: No open refining table by country.Add data: Leading refining country: No open refining table by country.
- Recycling's share of EU demand: No published rate.Add data: Recycling's share of EU demand: No published rate.