OpenOrebeta

Lithium

Battery metals

Compare

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

China refined 74% (IEA) of the world's lithium in 2025; Australia mined 32% (USGS).

74%

of the world's lithium was refined in China in 2025, according to IEA · about 3 in 4

ANNUAL 2025

  • Leading mining country

    32%

    Australia, 2025 (estimated), USGS

  • Leading refining country

    74%

    China, 2025, IEA

  • Sites on record

    27

    Mines and plants in the open sources. Coverage is partial. Also on record: 47 deposits and projects, which are not counted.

  • Recycling's share of EU demand

    0%

    2022, EU only

Overview

Lithium is extracted from hard-rock ores such as spodumene and from brines, then refined into carbonate or hydroxide for battery cathodes.

Map

Basemap: Natural Earth (public domain)
  • Share of world mine output
  • Mine or brine operation
  • Processing site
  • Deposit or project (not a mine or a plant yet)

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

2025

Key facts

Group
Battery metals
Stages in the atlas
Reserves · Mine · Process · Refine · Component · Recycle
World mine production, 2025
290 000 metric tons (estimated)
World refinery production, 2025
319 kt Li
Open price series
None

Open on the globe →Flow diagram →

Leading countries

Mine · USGS, 2025 (estimated)

  1. Australiaabout 1 in 332%
  2. Chinaabout 1 in 521%
  3. Chileabout 1 in 519%
  4. Zimbabweabout 1 in 109.7%
  5. Argentinaabout 1 in 107.9%

Refine · IEA, 2025

  1. Chinaabout 3 in 474%
  2. Chileabout 1 in 516%
  3. Argentinaabout 1 in 205%
  4. Australia1.9%
  5. Germany0.9%

The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.

What the source does not cover

  • No open price series for lithium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.

Supply chain

Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.

Reserves

Concentration

ANNUAL 2025

Chile holds about 1 in 4 (25 %) of the world's lithium reserves recorded here.

Reserves · 2025

(Data in metric tons, lithium content, unless otherwise specified)

Top 3 countries
60.0 %
Chile, Australia, China

Who holds what

  • Chile9 200 000 t24.9 %
  • Australia8 400 000 t22.7 %
  • China4 600 000 t12.4 %
  • United States4 400 000 t11.9 %
  • Argentina4 400 000 t11.9 %
  • Other countries2 400 000 t6.5 %
  • Canada1 600 000 t4.3 %
  • Brazil540 000 t1.5 %
  • Zimbabwe500 000 t1.4 %
  • Mali370 000 t1.0 %
  • Portugal60 000 t0.2 %
  • World total37 000 000 t

Mine

Concentration

ANNUAL 2025

Australia mines about 1 in 3 (32 %) of the world's lithium recorded here.

Mine production · 2025 (estimated)

(Data in metric tons, lithium content, unless otherwise specified)

Top 3 countries
72.4 %
Australia, China, Chile

Who holds what

  • Australia92 000 t31.7 %
  • China62 000 t21.4 %
  • Chile56 000 t19.3 %
  • Zimbabwe28 000 t9.7 %
  • Argentina23 000 t7.9 %
  • Brazil12 000 t4.1 %
  • Mali9 400 t3.2 %
  • Canada5 600 t1.9 %
  • Portugal380 t0.1 %
  • United StatesWithheld by source
  • Other countriesNil (—) in source
  • World total290 000 t

Process

No data yet: Lithium, process stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Refine

Concentration

ANNUAL 2025

China refines about 3 in 4 (74 %) of the world's lithium recorded here.

Chemicals (IEA) · 2025

kt = kilotonnes. Raw materials cover the extraction of lithium from hard-rock ore, as well as from clays and brines. Lithium chemicals cover the first production of lithium carbonate, hydroxide, sulphates and chlorides, and exclude reprocessing.

Top 3 countries
95.0 %
China, Chile, Argentina

Who holds what

Component

No data yet: Lithium, component stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Recycle

No data yet: Lithium, recycle stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Flow through the stages

Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.

Source for the country shares:One source at a time; figures from two sources are never mixed.

The diagram is wider than this screen. Swipe it sideways to see every stage.

MineRaw materials (IEA) · 2025ProcessNo open table by countryfor this stage in thissourceRefineChemicals (IEA) · 2025In trade flows only (no row in this table)ComponentNo open record ofcomponent production bycountryIn trade flows only (no row in this table)Chile → China: 2 026.7 million USD, 2024China → Rep. of Korea: 1 364.2 million USD, 2024China → Japan: 583.1 million USD, 2024Chile → Rep. of Korea: 494.8 million USD, 2024Argentina → China: 464 million USD, 2024Chile → Japan: 126 million USD, 2024Chile → USA: 119.6 million USD, 2024Chile → Belgium-Luxembourg (...1998): 103.6 million USD, 2024Chile → Netherlands: 98.9 million USD, 2024Argentina → Rep. of Korea: 95.8 million USD, 2024Rep. of Korea → China: 79.9 million USD, 2024Argentina → USA: 78.5 million USD, 2024United States → Japan: 77 million USD, 2024Chile → 6 more countries: 71.1 million USD, 2024Argentina → Japan: 65.8 million USD, 2024China → 6 more countries: 57.7 million USD, 2024United States → Rep. of Korea: 45.3 million USD, 2024Australia → China: 37.8 million USD, 2024Japan → 6 more countries: 29.1 million USD, 2024United States → 6 more countries: 25.8 million USD, 2024Australia → Rep. of Korea: 22.5 million USD, 2024United States → China: 20.5 million USD, 2024Rep. of Korea → Japan: 15.5 million USD, 2024United Kingdom → China: 13.8 million USD, 2024Bolivia (Plurinational State of) → China: 12.8 million USD, 2024Netherlands → 6 more countries: 11.2 million USD, 2024Germany → 6 more countries: 10 million USD, 2024Russian Federation → China: 9 million USD, 2024Australia 34.3 %China 23.1 %Chile 17.2 %Zimbabwe 9.2 %Argentina 6.3 %Canada 2.3 %Other / not attributed 7.6 %China 73.7 %Chile 16.3 %Argentina 5.0 %Australia 1.9 %Germany 0.9 %United States 0.3 %Other / not attributed 1.9 %Rep. of KoreaJapanUnited KingdomBolivia (Plurinational State of)NetherlandsRussian FederationChinaRep. of KoreaJapanUSABelgium-Luxembourg (...1998)Netherlands6 more countriesRecycling back into supply: lithium 0.0 % (2022), EU only
  • Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025Refine 2025
  • Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 1 310 flows, covering 94.4 % of traded value.
  • Dashed band: the customs code mixes grades or forms, so the stage of the product is uncertain. The table marks these with ≈.
  • Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
  • Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
  • Return arrow: recycling's share of EU demand (end-of-life recycling input rate). EU only, so it cannot be compared with the world shares above. Width: 1 px at 0 % to 10 px at 100 %.
Table of what is drawn (27 country marks, 40 trade flows)
Country shares per stage, from IEA GCMO 2026.
StageCountryShareAmountSource
Mine 2025Australia34.3 %104 kt Li
Mine 2025China23.1 %70 kt Li
Mine 2025Chile17.2 %52 kt Li
Mine 2025Zimbabwe9.2 %28 kt Li
Mine 2025Argentina6.3 %19 kt Li
Mine 2025Canada2.3 %7 kt Li
Mine 2025Other / not attributed7.6 %23 kt Lithe source's own "other" row
Refine 2025China73.7 %235 kt Li
Refine 2025Chile16.3 %52 kt Li
Refine 2025Argentina5.0 %16 kt Li
Refine 2025Australia1.9 %6 kt Li
Refine 2025Germany0.9 %3 kt Li
Refine 2025United States0.3 %1 kt Li
Refine 2025Other / not attributed1.9 %5 kt Lithe source's own "other" row
Recorded trade flows drawn as bands, by value, 2024. ≈ marks a customs code that mixes grades or forms.
Product of stageFrom → toMillion USDSource
RefineChile → China2 026.7
Refine ≈China → Rep. of Korea1 355.7
Refine ≈China → Japan547.7
RefineArgentina → China464
RefineChile → Rep. of Korea319.4
Refine ≈Chile → Rep. of Korea175.4
RefineChile → USA111.2
RefineChile → Japan107.6
RefineChile → Netherlands98.9
RefineArgentina → Rep. of Korea95.8
RefineArgentina → USA78.5
Refine ≈USA → Japan77
RefineChile → Belgium-Luxembourg (...1998)72.5
RefineArgentina → Japan65.8
RefineRep. of Korea → China56.2
Refine ≈China → Sweden48.7
Refine ≈USA → Rep. of Korea45.3
Refine ≈Australia → China37.8
RefineChina → Japan35.4
Refine ≈Chile → Belgium-Luxembourg (...1998)31
RefineChile → United Kingdom31
Refine ≈Japan → Fed. Rep. of Germany (...1990)29.1
Refine ≈Rep. of Korea → China23.7
Refine ≈Australia → Rep. of Korea22.5
Refine ≈USA → China20.5
RefineChile → Fed. Rep. of Germany (...1990)20.3
Refine ≈Chile → Japan18.4
Refine ≈Rep. of Korea → Japan15.5
RefineUSA → Fed. Rep. of Germany (...1990)15
RefineUnited Kingdom → China13.8
RefineBolivia (Plurinational State of) → China12.8
Refine ≈Netherlands → Fed. Rep. of Germany (...1990)11.2
Refine ≈USA → Poland10.8
Refine ≈Chile → Poland10.1
RefineFed. Rep. of Germany (...1990) → France10
RefineChile → France9.7
Refine ≈China → India9
Refine ≈Russian Federation → China9
RefineChina → Rep. of Korea8.5
Refine ≈Chile → USA8.4

Countries drawn as dashed boxes (in trade flows only)

  • Refine: Rep. of Korea; Japan; United Kingdom; Bolivia (Plurinational State of); Netherlands; Russian Federation
  • Component: China; Rep. of Korea; Japan; USA; Belgium-Luxembourg (...1998); Netherlands; 6 more countries (Fed. Rep. of Germany (...1990), Sweden, United Kingdom, Poland, France, India)

Recycling loop

  • Lithium: 0.0 % (2022, European Union)

Largest trade flows · 2024

Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 1 310 flows shown, covering 94.4 % of traded value.

Largest trade flows 2024
From → toProduct of stageMillion USDSource
Chile → ChinaRefine2 026.7
China → Rep. of KoreaRefine ≈1 355.7
China → JapanRefine ≈547.7
Argentina → ChinaRefine464
Chile → Rep. of KoreaRefine319.4
Chile → Rep. of KoreaRefine ≈175.4
Chile → USARefine111.2
Chile → JapanRefine107.6
Chile → NetherlandsRefine98.9
Argentina → Rep. of KoreaRefine95.8

≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.

Sites on record · 27 and 47 deposits and projects

74 of 74 shown

One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.

United States view: Lithium

These figures describe the United States only. They are not global figures.

Net import reliance · 2025
>50 %
Import sources · 2021-24
  • Chile54 %
  • Argentina43 %
  • Other3 %
Main uses
  • Batteries.

Money

The open price series where one exists, and one estimate with its formula. No licensed market data is shown.

Price

There is no open price series for lithium, so the atlas shows no price and no estimated value.

  • No open price series for lithium: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.

An estimated production value is computed only where an open price exists (copper and nickel). Why prices are missing

Investment pipeline

announced figures

Planned and under-construction lithium projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

  • Cínovec lithium projectPlannedMine and processing

    Geomet s.r.o. · Cínovec and Prunéřov, Ústí nad Labem Region · Czech Republic · Lithium

    “definitive feasibility study complete; shareholders will decide on the implementation and financing of the next stage” · status as printed on 2025-12-19

    Announced capital cost

    CZK 42 bn2025-12-19

    total investment of the lithium park (printed as 'more than 42 billion CZK') · ČEZ

    The publisher's words: “The total investment of the lithium park is estimated at more than 42 billion CZK.”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 9)” · 2025-03-25

      European Commission

      The publisher's words: “Cínovec lithium project is an ongoing integrated extraction and processing project in Czechia. The project promoted by Geomet s.r.o.”
    • CZK 800 MGrant · “subsidy received this April” · 2025-12-19

      Fair Transition Fund

      The publisher's words: “the CZK 800 million subsidy from the Fair Transition Fund that Geomet received this April”
    • EUR 350 MGrant · “approved a subsidy of up to; to be drawn between 2029 and 2031” · 2025-12-19

      Czech government (Strategic Investments for a Climate Neutral Economy programme)

      The publisher's words: “Czech government also approved a subsidy of up to 350 million euros (CZK 8.8 billion) from the Strategic Investments for a Climate Neutral Economy programme”
  • Lithium Hydroxide Converter GubenPlannedProcessing

    Rock Tech Guben GmbH · Guben, Brandenburg · Germany · Lithium

    “fully permitted; CapEx estimate updated” · status as printed on 2025-10-23

    Announced capital cost

    EUR 680 M2025-10-23

    CapEx for commissioning the facility (management estimate) · Rock Tech Lithium Inc.

    The publisher's words: “management now estimates the CapEx for commissioning the facility at approximately €680 million, compared to the prior estimate of €730 million”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 24)” · 2025-03-25

      European Commission

      The publisher's words: “Lithium Hydroxide Converter Guben is an ongoing processing project in Germany. The project promoted by Rock Tech Guben GmbH”
    • EUR 90 MGrant · “has issued an LOI committing up to” · 2024-06-27

      Brandenburg’s Ministry for Economic Affairs, Labour and Energy

      The publisher's words: “Brandenburg’s Ministry for Economic Affairs, Labour and Energy has issued an LOI committing up to 90 million EUR in grants”
    • EUR 10 MGrant · “application for federal funding has been confirmed” · 2024-12-31

      German Railway Authority

      The publisher's words: “application for federal funding from the German Railway Authority has been confirmed and will provide a contribution of another 10 million Euros in grants”

    Later statements

    • Brandenburg’s Ministry for Economic Affairs, Labour and Energy: The LOI expired on December 31, 2024.2024-12-31

      The publisher's words: “The LOI expired on December 31, 2024.”
  • Zero Carbon Lithium (Phase One Lionheart Project)Under constructionMine and processing

    Vulcan Energie Ressourcen GmbH · Upper Rhine Valley · Germany · Lithium

    “Final Investment Decision in December 2025, when construction activities officially commenced” · status as printed on 2026-05-27

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 47)” · 2025-03-25

      European Commission

      The publisher's words: “Zero Carbon Lithium is an ongoing extraction project in Germany. The project promoted by Vulcan Energie Ressourcen GmbH”
    • EUR 150 MEquity · “is investing up to” · 2026-09-09

      Raw Materials Fund (managed by KfW, under the Germany Fund)

      The publisher's words: “Raw Materials Fund, under the umbrella of the Germany Fund, is investing up to EUR 150 million in the implementation of the ambitious Lionheart project”

    Linked, not quoted (the publisher's terms forbid reuse, so no figure is taken from the page): European Investment Bank

  • EMILIPlannedMine and processing

    IMERYS Ceramics France and IMERYS Lithium France · Allier · France · Lithium

    “finalisation de l'étude de faisabilité définitive, jalon majeur prévu début 2027” · status as printed on 2026-02-11

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 12)” · 2025-03-25

      European Commission

      The publisher's words: “EMILI is an ongoing integrated extraction and processing project in France. The project promoted by IMERYS Ceramics France and IMERYS Lithium France”
    • EUR 50 MEquity · “prise de participation de l'État au capital du projet (annoncée)” · 2026-02-11

      État français (via Banque des Territoires, France 2030)

      The publisher's words: “L'investissement de l'État d'un montant de 50 millions d'euros”Our translation: “The State's investment of 50 million euros”
    • EUR 116 MGrant · “table column 'Innovation Fund grant (EUR million)'; project start 01/09/2026; covers the lithium hydroxide refinery plant” · 2026-11-01

      EU Innovation Fund

      The publisher's words: “01/09/2026 Imerys Holding | Imerys 2,332,289 116.0”
  • Barroso Lithium ProjectPlannedMine

    Savannah Lithium, Unipessoal, Lda. · Portugal · Lithium

    “Production targeted for end 2028” · status as printed on 2026-10-01

    Announced capital cost

    USD 418 M2026-10-01

    Capex total including pre-strip & contingency (Phase 1 DFS, July 2026); US$323m net of the State Grant · Savannah Resources Plc

    The publisher's words: “Capex: Total of US$418m including pre-strip & contingency US$323m required net of US$95m contribution from State Grant”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 5)” · 2025-03-25

      European Commission

      The publisher's words: “Barroso Lithium Project is an ongoing extraction project in Portugal. The project promoted by Savannah Lithium, Unipessoal, Lda.”
    • EUR 110 MGrant · “Awarded a non-reimbursable grant of up to” · 2026-04-15

      Portuguese State

      The publisher's words: “Awarded a non-reimbursable grant of up to EUR110m by the Portuguese State”
    • USD 270 MLoan guarantee · “eligible for a loan guarantee” · 2026-04-15

      German Government

      The publisher's words: “eligible for a loan guarantee from the German Government for up to USD270m”
  • Rhyolite Ridge Lithium-Boron ProjectPlannedMine and processing

    Ioneer · Nevada · United States · Lithium

    “the Board will be positioned to consider a Final Investment Decision (FID)” · status as printed on 2026-08

    Announced capital cost

    USD 1.68 bn2025-10-29

    AACE Class 2 capital cost estimate (-10%, +15%) including a 10% contingency; table row: Initial capital expenditure (including contingencies) US$M 1,683.2 · Ioneer

    The publisher's words: “U.S.$1,683 million – AACE Class 2 capital cost estimate (-10%, +15%) including a 10% contingency”
    Public backing
    • USD 996 MLoan · “closed” · 2025-12-19

      U.S. Department of Energy, Office of Energy Dominance Financing (formerly Loan Programs Office)

      The publisher's words: “In January, Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy”
    • no amount statedLoan · “has conditions to first draw” · 2025-12-19

      U.S. Department of Energy, Office of Energy Dominance Financing (formerly Loan Programs Office)

      The publisher's words: “$968 million in principal and $28 million in capitalised interest and has conditions to first draw”
  • South West Arkansas ProjectPlannedMine and processing

    Smackover Lithium · southern Arkansas · United States · Lithium

    “expects to take FID by the end of the first quarter of 2027” · status as printed on 2026-11-13

    Announced capital cost

    USD 1.45 bn2026-11-13

    All-in Class III capex estimate (Definitive Feasibility Study), includes a 12.3% contingency · Standard Lithium Ltd.

    The publisher's words: “All-in Class III capex estimate of $1.45 billion includes a 12.3% Monte Carlo risked contingency.”
    Public backing
    • USD 225 MGrant · “closed” · 2025-01-16

      U.S. Department of Energy, Office of Manufacturing & Energy Supply Chains

      The publisher's words: “has closed the US$225 million grant from the U.S. Department of Energy’s”
  • Thacker PassUnder constructionMine and processing

    Lithium Americas Corp. · Humboldt County, Nevada · United States · Lithium

    “major construction of the processing plant at Thacker Pass Phase 1” · status as printed on 2026-05-14

    Announced capital cost

    USD 2.93 bn2026-05-14

    total Capex estimate per the Company's Technical Report (effective December 31, 2024), Thacker Pass Phase 1; source says it did not include any exposure to tariffs · Lithium Americas Corp.

    The publisher's words: “of which $1.1 billion is part of the total Capex estimate of $2.93 billion per the Company’s Technical Report.”
    Public backing
    • USD 2.26 bnLoan · “closed” · 2025-03-28

      U.S. Department of Energy, Loan Programs Office

      The publisher's words: “Loan Programs Office closed a $2.26 billion loan under the Advanced Technology Vehicles Manufacturing Loan Program”
    • no amount statedEquity · “restructured its deal; 5% equity ownership in the form of LAC warrants” · 2025-09-30

      U.S. Department of Energy, Loan Programs Office

      The publisher's words: “The new terms provide the U.S. Government with 5% equity ownership in the form of LAC warrants”
    • USD 2.23 bnLoan · “Project financing for Phase 1 includes a $2.23 billion loan” · 2026-05-14

      U.S. Department of Energy

      The publisher's words: “Project financing for Phase 1 includes a $2.23 billion loan from the U.S. DOE and strategic investments from GM and Orion.”

A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names lithium, and general critical-minerals instruments (marked). Each is one statement by its publisher.

  1. 2024-05-23in force from · European UnionJoint purchasingin force

    The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.

    Covers: “strategic raw materials” · Materials: Cobalt, Copper, Gallium, Germanium, Lithium, Graphite, Nickel, Rare earths, Tungsten

    The publisher's words: “The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union”
    2 further statements from the source

    joint negotiation of purchases allowed (Article 25(5))

    The publisher's words: “may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement”

    coordination of strategic stocks (Article 23)

    The publisher's words: “shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials”
  2. 2025-06-17announced · G7Other supportannounced

    G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.

    Covers: “critical minerals”

    critical minerals in general; the source does not name lithium

    The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
    3 further statements from the source

    launch of the plan

    The publisher's words: “We are launching a G7 Critical Minerals Action Plan”

    roadmap content

    The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”

    capital mobilisation

    The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
  3. 2025-11-04published · CanadaFundannounced

    Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.

    CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”

    Covers: “critical minerals projects and companies”

    critical minerals in general; the source does not name lithium

    The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
    3 further statements from the source

    tools of the fund

    The publisher's words: “including equity investments, loan guarantees, and offtake agreements”

    First and Last Mile Fund

    The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”

    absorbs the Critical Minerals Infrastructure Fund

    The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
  4. 2025-11-22published · United KingdomFundannounced

    The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.

    GBP 50 M · “up to £50 million”

    Covers: “critical mineral projects in the UK”

    critical minerals in general; the source does not name lithium

    The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
    2 further statements from the source

    stockpiling under consideration

    The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”

    later programme page (published 22 June 2026): grant share

    The publisher's words: “with £45 million of this available as grant funding”
  5. 2025-12-03announced · European UnionFundannounced

    The Commission adopted the RESourceEU Action Plan: project financing, a European Critical Raw Materials Centre, joint purchasing through the Raw Materials Platform and a stockpiling pilot.

    EUR 3 bn · “up to €3 billion over the next 12 months”

    Covers: “critical raw materials, such as rare earth elements, cobalt or lithium” · Materials: Rare earths, Cobalt, Lithium

    The publisher's words: “The EU will mobilise up to €3 billion over the next 12 months to support concrete projects”
    5 further statements from the source

    adoption

    The publisher's words: “The European Commission has adopted today the RESourceEU Action Plan”

    European Critical Raw Materials Centre planned

    The publisher's words: “In early 2026, the Commission will set up a European Critical Raw Materials Centre”

    joint purchasing and offtake via the Raw Materials Platform

    The publisher's words: “the Raw Materials Platform will facilitate the efforts of the companies to aggregate demand, jointly purchase strategic raw materials and secure offtake agreements”

    stockpiling pilot

    The publisher's words: “with a pilot scheme set to become operational in early 2026”

    materials named

    The publisher's words: “secure the EU's supply of critical raw materials, such as rare earth elements, cobalt or lithium”
  6. 2026-01-14signed · United StatesPrice floorannounced

    Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.

    Covers: “processed critical minerals and their derivative products (PCMDPs)”

    critical minerals in general; the source does not name lithium

    The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
  7. 2026-02-02announced · United StatesStockpileannounced

    The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.

    USD 10 bn · “a Direct Loan of up to $10 billion”

    Covers: “essential raw materials”

    critical minerals in general; the source does not name lithium

    The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
    4 further statements from the source

    what it establishes

    The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”

    storage

    The publisher's words: “that will store essential raw materials in facilities across the United States”

    borrower structure

    The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”

    later EXIM release of May 4, 2026 restating the loan

    The publisher's words: “The transaction includes a direct loan of up to $10 billion”

There is no open price series for lithium, so these instruments are listed without a chart.

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.

    477gCO2e/kWh

    2025Estimated

    Higher than 33% of the other 6 materials with a computed proxy.

    • Covers the countries behind 98% of refinery output (Chemicals (IEA), 2025).
    • Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
  • Water

    Share of the material's mine sites on record that lie in high or extremely high baseline water stress.

    4.5%of mine sites on record

    2023Estimated

    Higher than 14% of the other 7 materials with rated mine sites.

    • 1 of 22 sites with a class (22 mine and brine sites on record).
    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per material: the area is mapped per country for all commodities together.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of EU demand (end-of-life recycling input rate).

    0%of EU demand

    2022Reported

    None of the other 8 elements in the atlas with a published EU rate has a lower figure.

    • Published for the EU as a whole. It cannot be compared with world shares.
    • End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed.
    • 8 EU targets apply to this material; they are listed below.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

The figures behind the indicators

Grid-carbon proxy for refining

estimated · proxy

477gCO2e per kWh

Covers the countries behind 98.1% of refinery output (Chemicals (IEA), 2025)

CountryShare of refiningGrid intensity
China73.7%5282025
Chile16.3%2912025
Argentina5%3462025
Australia1.9%5182025
Germany0.9%3342025
United States0.3%3842025

Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.

Water stress where the mines are

estimated · by site

4.5%of mine sites on record lie in high or extremely high water stress (1 of 22)

  • Low (<10%)11 sites
  • High (40-80%)1 site
  • Arid and Low Water Use10 sites

Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.

Circularity

Recycling's share of EU demand (end-of-life recycling input rate)

Material2013201620192022
Lithium0%0%0.1%0%

End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed. The latest published figure is for 2022.

EU targets that apply

Read in the original Official Journal version; later amendments are not reflected.

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

  • ▲ BanNamibia2023

    Export ban: Ores and concentrates of cobalt, graphite, lithium, manganese, and rare earths (2023).

    Source ↗
  • ▲ BanZimbabwe2022

    Export ban: Lithium ore (2022).

    Source ↗

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What if?

Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.

What the atlas does not know about lithium

How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.

Data coverage

Mines on record: 82.3% (5/9)

Plants on record: 1.9% (1/6)

Owner or operator known: 60.9% (4/9)

Assurance known: no public assurance list is ingested yet

  • Mines:82% of world output lies in countries with a record (5 of 9 countries)(Mine production, 2025)

    Producer countries without a record: Zimbabwe 9.7%, Brazil 4.1%, Mali 3.2%, Portugal 0.1%

  • Processing plants:1.9% of world output lies in countries with a record (1 of 6 countries)(Chemicals (IEA), 2025)

    Producer countries without a record: China 74%, Chile 16%, Argentina 5%, Germany 0.9%, United States 0.3%

  • Owners and operators:61% of world output lies in countries with a record (4 of 9 countries)(Mine production, 2025)

    Producer countries without a record: China 21%, Zimbabwe 9.7%, Brazil 4.1%, Mali 3.2%, Portugal 0.1%

  • Assurance: No public assurance list is ingested yet

A country in these lists marks missing data, not missing industry.

Mining and refining: who leads

  • IEA GCMO 2026, 2025

    • Mining:Australia 34% (about 1 in 3), 2025
    • Refining:China 74% (about 3 in 4), 2025

Price transparency

No open price series for lithium: the services that publish one are licensed, so no price is shown.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

Source registry for this material

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Type the name of a material, a country, a site or a company.