Japan
Watch and Edit are coming soon.
Japan refined 5.1% (IEA) of the world's copper in 2025.
5.1%
of the world's copper refining in 2025, according to IEA · about 1 in 20
#4 in copper refiningANNUAL 2025
Materials with a production share
5
with a mining or refining share on record
Exports of the ten materials
$7.8bn
2024; most of it copper; 81 partner countries
Grid emissions intensity
474gCO2e/kWh
2025
Imports of the ten materials
$19bn
2024; most of it copper; 57 partner countries
Overview
What it produces
Share of world output, per material and stage. Each bar is one source's figure; where two sources report the same stage, both are shown and never blended. A full-width bar would be 100%.
Copper· Refine
- 5.1%about 1 in 20#4 in copper refiningIEA, 2025 · 1 431 kt Cu
Rank 4 of the 6 countries with a figure in this IEA table.
- 4.8%about 1 in 20#4 in copper refiningUSGS, 2025 (estimated) · 1 400 kt
Rank 4 of the 17 countries with a figure in this USGS table.
Graphite· Refine
- 3%about 1 in 20#2 in graphite refiningIEA, 2025 · 68 kt
Rank 2 of the 6 countries with a figure in this IEA table.
Nickel· Refine
- 2.9%#5 in nickel refiningIEA, 2025 · 108 kt Ni
Rank 5 of the 7 countries with a figure in this IEA table.
Cobalt· Refine
- 2.5%#3 in cobalt refiningIEA, 2025 · 6 kt Co
Rank 3 of the 6 countries with a figure in this IEA table.
Gallium· Refine
- 0.3%#3 in gallium refiningUSGS, 2025 (estimated) · 3 000 kg
Rank 3 of the 3 countries with a figure in this USGS table.
Key facts
- Country code
- JPN
- GDP
- $4.44tn (2025)
- Mineral rents, share of GDP
- 0% (2021)
- Ores and metals, share of goods exports
- 3.6% (2025)
- Mining area, all commodities
- 13 km² (2019; rank 106 of 144)
Map
- Japan
Sites are those in the open sources. A site missing here is missing from the sources, not from the world.
Country in context
Copper: Refining (IEA), 2025. All rows come from the same table.
| Country | kt Cu | Share of world | Source |
|---|---|---|---|
| JapanThis country | 1 431 | 5.1 % | |
| ChinaLargest producer in the table | 13 069 | 46.8 % | |
| World totalWorld total as the source gives it | 27 955 | – |
Supply chain
Every figure the sources give for this country, its trade partners per material, and where its sites are.
Production, refining and reserves
The latest year of each series. Share is of the series total: the larger of the source world total and the sum of its rows. Rank counts only the countries that have a number in that series.
| Series | Amount | Share of world | Rank | Source |
|---|---|---|---|---|
| Cobalt: Refining (IEA)2025 · IEA GCMO 2026 · rank 3 of 6 | 6 kt Co | 2.5 % | ||
| Nickel: Refining (IEA)2025 · IEA GCMO 2026 · rank 5 of 7 | 108 kt Ni | 2.9 % | ||
| Copper: Mine production2025 (estimated) · USGS MCS 2026 | Nil (—) in source | – | ||
| Copper: Refinery production2025 (estimated) · USGS MCS 2026 · rank 4 of 17 | 1 400 kt | 4.8 % | ||
| Copper: Refining (IEA)2025 · IEA GCMO 2026 · rank 4 of 6 | 1 431 kt Cu | 5.1 % | ||
| Copper: Reserves2025 · USGS MCS 2026 | Nil (—) in source | – | ||
| Graphite: Refined battery-grade supply (IEA)2025 · IEA GCMO 2026 · rank 2 of 6 | 68 kt | 3.0 % | ||
| Gallium: Primary production2025 (estimated) · USGS MCS 2026 · rank 3 of 3 | 3 000 kg | 0.3 % | ||
| Gallium: Production capacity2025 (estimated) · USGS MCS 2026 · rank 2 of 3 | 10 000 kg | 0.6 % |
Mines and plants listed without coordinates · 25
The USGS Minerals Yearbook names these operations in Japan with company, place and annual capacity, but gives no coordinates, so they are not on the map. Capacity is not production. Each row is from the chapter year shown.
| Material and product | Kind | Company, as listed | Place, as listed | Annual capacity | Year | Source |
|---|---|---|---|---|---|---|
| AntimonyAntimony | Not specified | Hosokura Metal Mining Co. Ltd. (Mitsubishi Materials Corp., 100%) | Refinery in Hosokura, Miyagi Prefecture | 360. (as printed) | 2021 | |
| AntimonyAntimony | Not specified | Kosaka Smelting and Refining Co. Ltd. (Dowa Metals & Mining Co. Ltd., 100%) | Refinery in Kosaka, Akita Prefecture | 500. (as printed) | 2021 | |
| AntimonyAntimony | Not specified | Toho Zinc Co. Ltd. | Chigirishima refinery, Toyoda, Hiroshima Prefecture | 1,200. (as printed) | 2021 | |
| CobaltCobalt, refined, metal | Plant | Sumitomo Metal Mining Co. Ltd. (SMM) | Harima plant, Kako District, Hyogo Prefecture | NA. (as printed) | 2021 | |
| CobaltCobalt, refined, metal | Plant | Sumitomo Metal Mining Co. Ltd. (SMM) | Niihama plant, Niihama, Ehime Prefecture | 4,500. (as printed) | 2021 | |
| CopperCopper, refined | Plant | Hibi Kyodo Smelting Co. Ltd. (Mitsui Mining & Smelting Co. Ltd., 63.51%; Nittetsu Mining Co Ltd., 20.28%; Furukawa Metals & Resources Co. Ltd., 16.21%) | Tamano smelter, Tamano, Okayama Prefecture | 200. (as printed) | 2021 | |
| CopperCopper, refined | Plant | JX Metals Smelting Co. Ltd. (JX Nippon Mining & Metals Co. Ltd., 100%) | Hitachi refinery, Ibaraki Prefecture | 180. (as printed) | 2021 | |
| CopperCopper, refined | Plant | JX Metals Smelting Co. Ltd. (JX Nippon Mining & Metals Co. Ltd., 100%) | Saganoseki smelter and refinery, Oita Prefecture | 270. (as printed) | 2021 | |
| CopperCopper, refined | Plant | Kosaka Smelting and Refining Co. Ltd. (Dowa Metals & Mining Co. Ltd., 100%) | Refinery in Kosaka, Akita Prefecture | 65. (as printed) | 2021 | |
| CopperCopper, refined | Plant | Mitsubishi Materials Corp. | Plant in Naoshima, Kagawa Prefecture | 234. (as printed) | 2021 | |
| CopperCopper, refined | Plant | Onahama Smelting and Refining Co. Ltd. (Mitsubishi Materials Corp., 55.714%; Dowa Metals & Mining Co. Ltd., 31.621%; Furukawa Metals & Resources Co. Ltd., 12.665%) | Onahama smelter and refinery, Iwaki, Fukushima Prefecture | 300. (as printed) | 2021 | |
| CopperCopper, refined | Plant | Sumitomo Metal Mining Co. Ltd. (SMM) | Toyo plant, Saijo, Ehime Prefecture | 460. (as printed) | 2021 | |
| GalliumGallium | Not specified | Akita Zinc Co. Ltd. [Dowa Metals & Mining Co. Ltd., 86%, and Sumitomo Metal Mining Co. Ltd. (SMM), 14%] | Plant in Iijima, Akita Prefecture | 10. (as printed) | 2021 | |
| GalliumGallium | Not specified | Nippon Rare Metal Inc. | Iwaki plant, Fukushima Prefecture | NA. (as printed) | 2021 | |
| NickelNickel > Ferronickel | Plant | Hyuga Smelting Co. Ltd. [Sumitomo Metal Mining Co. Ltd. (SMM), 60%; Nippon Steel Stainless Steel Corp., 25%; Mitsui & Co. Ltd., 15%] | Plant in Hyuga, Miyazaki Prefecture | 15,000. (as printed) | 2021 | |
| NickelNickel > Refined | Plant | Mitsubishi Materials Corp. | Plant in Naoshima, Kagawa Prefecture | 2,400. (as printed) | 2021 | |
| NickelNickel > Ferronickel | Plant | Nippon Yakin Kogyo Co. Ltd. | Oheyama plant, Miyazu, Kyoto Prefecture | 13,500. (as printed) | 2021 | |
| NickelNickel > Ferronickel | Plant | Pacific Metals Co. Ltd. | Plant in Hachinohe, Aomori Prefecture | 35,000. (as printed) | 2021 | |
| NickelNickel > Refined | Plant | Sumitomo Metal Mining Co. Ltd. (SMM) | Harima plant, Kako District, Hyogo Prefecture | 61,000. (as printed) | 2021 | |
| NickelNickel > Refined | Plant | Sumitomo Metal Mining Co. Ltd. (SMM) | Nickel plant, Niihama, Ehime Prefecture | 75,000. (as printed) | 2021 | |
| NickelNickel > Oxide | Plant | Vale Japan Ltd. [Vale Canada Ltd., 87.2%, and Sumitomo Metal Mining Co. Ltd. (SMM), 12.8%] | Matsusaka plant, Matsusaka, Mie Prefecture | 66,000. (as printed) | 2021 | |
| NickelNickel > Powder | Not specified | Toho Titanium Co. Ltd. (JX Nippon Mining & Metals Co. Ltd., 50.38%; Nippon Steel Corp., 4.92%; Master Trust Bank of Japan Ltd., 3.12%; State Street Bank and Trust Co., 2.06%) | Chigasaki plant, Chigasaki, Kanagawa Prefecture | 720. (as printed) | 2021 | |
| NickelNickel > Powder | Not specified | Toho Titanium Co. Ltd. (JX Nippon Mining & Metals Co. Ltd., 50.38%; Nippon Steel Corp., 4.92%; Master Trust Bank of Japan Ltd., 3.12%; State Street Bank and Trust Co., 2.06%) | Wakamatsu plant, Kitakyushu, Fukuoka Prefecture | 320. (as printed) | 2021 | |
| TungstenTungsten | Not specified | A.L.M.T. Corp. | Plants in Sakata, Yamagata Prefecture; and Toyama, Toyama Prefecture | NA. (as printed) | 2021 | |
| TungstenTungsten | Not specified | Japan New Metals Co. Ltd. (Mitsubishi Materials Corp., 100%) | Plant in Akita, Akita Prefecture | NA. (as printed) | 2021 |
Trade partners
7 recorded flows, 2024
- Recorded trade flow; a thicker line is a larger value
- Japan
Lines join the middle of each country. They are not shipping routes.
| Partner | Material | Year | Value, US$ | Source |
|---|---|---|---|---|
| Import fromChile | CopperMine | 2024 | $5.4bn | |
| Import fromIndonesia | CopperMine | 2024 | $2.2bn | |
| Export toChina | CopperRefine | 2024 | $2.1bn | |
| Export toIndia | CopperRefine | 2024 | $1.9bn | |
| Import fromPeru | CopperMine | 2024 | $1.8bn | |
| Import fromAustralia | CopperMine | 2024 | $1.6bn | |
| Export toOther Asia, nes | CopperRefine | 2024 | $1.2bn |
Reconciled customs data (CEPII BACI), by value. The data holds only the largest flows of each material, so this is not the country’s full trade.
0 sites, deposits and projects on record are listed with the map in the Overview →
Money
What the trade data and the World Bank record in money terms. Every value is a reported figure with its own year.
All recorded trade flows of 2024 under the customs codes that isolate one of the ten materials, by value (CEPII BACI, reconciled estimates, current US dollars). Codes that mix several materials are left out, so trade in those materials is understated; gallium and germanium have no usable code at all. Each material lists its five largest partners. Why trade data blurs some materials
Exports of the ten materials
$7.8bnin 2024, with 81 partner countries
Copper$6.6bn
China $2.2bn · India $1.9bn · Other Asia, nes $1.2bn · Thailand $651M · Indonesia $417M · 39 more
Nickel$610M
China $163M · India $114M · United States $58M · Norway $48M · United Kingdom $46M · 47 more
Rare earths$237M
Vietnam $56M · Philippines $35M · Other Asia, nes $30M · China $24M · Republic of Korea $23M · 39 more
Graphite$182M
China $55M · Republic of Korea $28M · France $26M · United States $21M · Other Asia, nes $9.1M · 41 more
Cobalt$118M
United States $46M · China $23M · United Kingdom $9.6M · Belgium $7.7M · Philippines $6.6M · 24 more
Tungsten$46M
Other Asia, nes $14M · Republic of Korea $9.8M · China $8.7M · Germany $5.9M · United States $1.7M · 22 more
Lithium$37M
Germany $29M · Netherlands $2.4M · France $2M · India $1.3M · Singapore $871,013 · 29 more
Antimony$24M
India $6.7M · Malaysia $3.2M · Indonesia $2.2M · China $2.1M · Vietnam $1.9M · 24 more
Imports of the ten materials
$19bnin 2024, with 57 partner countries
Copper$14bn
Chile $5.5bn · Indonesia $2.2bn · Peru $1.8bn · Australia $1.6bn · Canada $824M · 26 more
Nickel$2.9bn
Indonesia $1.1bn · Australia $629M · Philippines $596M · Madagascar $145M · Republic of Korea $90M · 19 more
Lithium$875M
China $583M · Chile $126M · United States $77M · Argentina $66M · Republic of Korea $19M · 8 more
Rare earths$511M
China $195M · Vietnam $164M · Malaysia $64M · France $33M · Thailand $21M · 20 more
Graphite$193M
China $131M · United States $15M · Poland $13M · Republic of Korea $10M · Switzerland $5.5M · 29 more
Cobalt$173M
Finland $66M · Morocco $19M · China $16M · Canada $16M · Madagascar $12M · 20 more
Antimony$131M
China $60M · Vietnam $25M · Republic of Korea $14M · Thailand $14M · Myanmar $9M · 10 more
Tungsten$112M
China $90M · Other Asia, nes $6.7M · Germany $6.3M · Vietnam $2.5M · United States $1.3M · 15 more
The economy around mining
World Bank indicators. Each has its own latest year, shown next to the value; mineral rents are often several years old.
GDP (current US$)
$4.44tn
Year 2025
Mineral rents (% of GDP)
0%
Year 2021
Ores and metals exports (% of merchandise exports)
3.6%
Year 2025
Government revenue from extractives
No data yet. Japan has no EITI summary record with a government total. Countries report only if they implement the EITI Standard; a missing record does not mean there is no such revenue.
Investment pipeline
announced figuresPlanned and under-construction projects in Japan with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.
No data yet. The atlas has read no announcement of this kind for a project in Japan. The list is short and hand-read; a missing project is missing from the list, not from the world.
A short, hand-read list, not a census: 19 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.
Public support instruments
Stockpiles, price floors, offtake and purchasing programmes and public funds of Japan's government, as dated policy events of the type "public support". Each is one statement by its publisher.
2025-10-28signed · United States and JapanOther supportannounced
Bilateral, non-binding framework on financial support, pricing measures and a possible complementary stockpiling arrangement for critical minerals and rare earths.
Covers: “critical minerals and rare earths” · Materials: Rare earths
The publisher's words: “The Participants intend to work together to consider a mutually complementary stockpiling arrangement, utilizing existing national systems”
2 further statements from the source
pricing measures
The publisher's words: “pricing measures to support alternative projects and such high-standard markets”
financial support within six months
The publisher's words: “the Participants intend to take measures to provide financial support to selected projects”
Mining companies headquartered here · 2
Companies that Wikidata places in the mining industry with headquarters in Japan, for every commodity, not only the ten materials. Wikidata is edited by volunteers: entries may be missing or out of date, and each name links to its item. A listing names an exchange and a ticker; it is not a price.
| Company | Headquarters | Stock listing | LEI | Source |
|---|---|---|---|---|
| JX Nippon Mining & Metalsnamed at 5 sites or listed plants, itself or through a subsidiary | Tokyo | Tokyo Stock Exchange: 5016 | — | |
| Kunimine Industries Co. | Iwamotochō | — | — |
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.
Carbon
Emissions intensity of the country's electricity grid.
474gCO2e/kWh
Higher than 51% of the other 208 countries with a grid figure.
- It describes the national grid, not mining or refining. Sites may run on their own power.
Water
Share of the country's mine sites on record that lie in high or extremely high baseline water stress.
No mine or brine site with a water-stress class is on record in this country.
- Counted by site, not by tonnage: it is not a share of production.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining in the country, every commodity together.
13km²
Higher than 27% of the other 143 countries with a mapped mining area.
- Rank 106 of 144 countries by area.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of demand.
Not available per country: recycling rates in the atlas are published per material, for the EU as a whole.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
USGS Table 4 lists no export control by this country for the materials in the atlas.
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
Gaps
What the atlas is missing for Japan
Computed from the data. Each line names a record that exists and one that does not. It marks missing data, not missing industry.
- Listed as a cobalt refiner (2.5% of world output; Refining (IEA), 2025), but no processing plant is on record.
- Listed as a nickel refiner (2.9% of world output; Refining (IEA), 2025), but no processing plant is on record.
- Listed as a copper refiner (4.8% of world output; Refinery production, 2025), but no processing plant is on record.
- Listed as a graphite refiner (3% of world output; Refined battery-grade supply (IEA), 2025), but no processing plant is on record.
- Listed as a gallium refiner (0.3% of world output; Primary production, 2025), but no processing plant is on record.
- Trade is partial by design: the atlas holds only each material's largest flows. 53 of them name this country.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- CEPII BACI 202601 ↗55 records used
- Licence
- Etalab Open Licence 2.0
- As of
- 2024
- Confidence
- Estimated
- USGS Minerals Yearbook, Vol. III ↗25 records used
- Licence
- Public domain (U.S. Government work)
- As of
- 2021
- Confidence
- Reported
- IEA GCMO 2026 ↗15 records used
- Licence
- CC-BY-4.0
- As of
- 2025
- Confidence
- Reported
- USGS MCS 2026 ↗7 records used
- Licence
- CC0-1.0
- As of
- 2025
- Confidence
- Reported · Estimated
- World Bank WDI ↗3 records used
- Licence
- CC-BY-4.0
- As of
- 2021–2025
- Confidence
- Reported
- Ember Yearly Electricity Data ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2025
- Confidence
- Reported
- Maus et al. 2022 (mining areas v2) ↗1 record used
- Licence
- CC-BY-SA-4.0
- As of
- 2019
- Confidence
- Estimated
- Wikidata ↗1 record used
- Licence
- CC0-1.0
- As of
- 2026
- Confidence
- Inferred, needs review
The mining-area figure comes from a share-alike source (CC-BY-SA-4.0). It is kept in its own file under that licence, apart from the rest of the atlas's data.
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.
What we don't know yet
No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.
- Sites on record: No mine or plant on record here.Add data: Sites on record: No mine or plant on record here.
- Import dependence: no open per-country series is loaded yet.Add data: Import dependence: no open per-country series is loaded yet.
- Recycling rates: Eurostat publishes them for the EU as a whole, not for one country.Add data: Recycling rates: Eurostat publishes them for the EU as a whole, not for one country.