Tungsten
Hard metals
Watch and Edit are coming soon.
China mined 79% (USGS) of the world's tungsten in 2025 (estimated).
79%
of the world's tungsten was mined in China in 2025 (estimated), according to USGS · about 4 in 5
ANNUAL 2025
Leading mining country
79%
China, 2025 (estimated), USGS
Sites on record
22
Mines and plants in the open sources. Coverage is partial. Also on record: 37 deposits and projects, which are not counted.
Overview
Tungsten concentrate is converted to ammonium paratungstate and then to metal powder or carbide for cutting tools, alloys and defence uses.
Map
- Share of world mine output
- Mine or brine operation
- Processing site
- Deposit or project (not a mine or a plant yet)
Sites are those in the open sources. A site missing here is missing from the sources, not from the world.
2025
Key facts
- Group
- Hard metals
- Stages in the atlas
- Reserves · Mine · Process · Refine · Recycle
- World mine production, 2025
- 85 000 metric tons (estimated)
- Open price series
- None
Leading countries
Mine · USGS, 2025 (estimated)
- Chinaabout 4 in 579%
- Vietnamabout 1 in 203.5%
- Kazakhstan2.8%
- Korea, North2.3%
- Russia2.3%
The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.
What the source does not cover
- No open price series for tungsten: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
Supply chain
Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.
Reserves
Concentration
ANNUAL 2025China holds about half (53 %) of the world's tungsten reserves recorded here.
Reserves · 2025
(Data in metric tons, tungsten content, unless otherwise specified)
- Top 3 countries
- 73.9 %
- China, Australia, Russia
Who holds what
- China2 500 000 t53.2 %
- Other countries950 000 t20.2 %
- Australia570 000 t12.1 %
- Russia400 000 t8.5 %
- Vietnam170 000 t3.6 %
- Spain66 000 t1.4 %
- Korea, North29 000 t0.6 %
- Austria10 000 t0.2 %
- Portugal3 400 t0.1 %
- United StatesNot available
- BoliviaNot available
- KazakhstanNot available
- RwandaNot available
- World total>4,700,000
Mine
Concentration
ANNUAL 2025China mines about 4 in 5 (79 %) of the world's tungsten recorded here.
Mine production · 2025 (estimated)
(Data in metric tons, tungsten content, unless otherwise specified)
- Top 3 countries
- 85.0 %
- China, Vietnam, Kazakhstan
Who holds what
- China67 000 t78.7 %
- Vietnam3 000 t3.5 %
- Kazakhstan2 400 t2.8 %
- Other countries2 400 t2.8 %
- Korea, North2 000 t2.3 %
- Russia2 000 t2.3 %
- Bolivia1 700 t2.0 %
- Rwanda1 300 t1.5 %
- Australia1 000 t1.2 %
- Austria840 t1.0 %
- Spain800 t0.9 %
- Portugal700 t0.8 %
- United StatesNil (—) in source
- World total85 000 t
Process
No data yet: Tungsten, process stage
We have no sourced record for this. We never fill gaps with estimates.
Help add it
Refine
No data yet: No open refining data yet for tungsten
We have no sourced record for this. We never fill gaps with estimates.
Help add it
Recycle
No data yet: Tungsten, recycle stage
We have no sourced record for this. We never fill gaps with estimates.
Help add it
Flow through the stages
Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.
The diagram is wider than this screen. Swipe it sideways to see every stage.
- Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025
- Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 2 100 flows, covering 51.7 % of traded value.
- Dashed band: the customs code mixes grades or forms, so the stage of the product is uncertain. The table marks these with ≈.
- Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
- Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
- Dashed return arrow: no published recycling rate. Eurostat publishes no end-of-life recycling input rate for tungsten.
11 recorded flows of waste and scrap are not drawn. They are listed under Largest trade flows on this page.
Table of what is drawn (34 country marks, 29 trade flows)
| Stage | Country | Share | Amount | Source |
|---|---|---|---|---|
| Mine 2025 | China | 78.7 % | 67 000 t | |
| Mine 2025 | Vietnam | 3.5 % | 3 000 t | |
| Mine 2025 | Kazakhstan | 2.8 % | 2 400 t | |
| Mine 2025 | Korea, North | 2.3 % | 2 000 t | |
| Mine 2025 | Russia | 2.3 % | 2 000 t | |
| Mine 2025 | Bolivia | 2.0 % | 1 700 t | |
| Mine 2025 | Rwanda | 1.5 % | 1 300 t | |
| Mine 2025 | Australia | 1.2 % | 1 000 t | |
| Mine 2025 | Austria | 1.0 % | 840 t | |
| Mine 2025 | Spain | 0.9 % | 800 t | |
| Mine 2025 | Portugal | 0.8 % | 700 t | |
| Mine 2025 | Other / not attributed | 2.8 % | 2 400 tthe source's own "other" row |
| Product of stage | From → to | Million USD | Source |
|---|---|---|---|
| Refine | China → Japan | 34.7 | |
| Mine | Dem. People's Rep. of Korea → China | 31.4 | |
| Refine | China → Rep. of Korea | 29.6 | |
| Mine | Myanmar → China | 29.1 | |
| Process ≈ | China → USA | 28.4 | |
| Refine | USA → Canada | 25.5 | |
| Process ≈ | Other Asia, nes → China | 23.1 | |
| Process ≈ | Philippines → China | 21.9 | |
| Mine | Spain → Austria | 21.8 | |
| Mine | Bolivia (Plurinational State of) → USA | 21.2 | |
| Process ≈ | China → Japan | 20.5 | |
| Refine | China → Japan | 20.5 | |
| Refine | Austria → Fed. Rep. of Germany (...1990) | 20.4 | |
| Mine | Australia → Viet Nam | 19.2 | |
| Mine | Rwanda → China | 17.3 | |
| Process ≈ | Fed. Rep. of Germany (...1990) → USA | 15.9 | |
| Mine | Russian Federation → China | 15.8 | |
| Refine | Canada → USA | 14.8 | |
| Refine | China → Austria | 14.1 | |
| Refine | Israel → USA | 13.9 | |
| Refine | China → USA | 13.8 | |
| Refine | China → Netherlands | 13.4 | |
| Refine | China → Israel | 13.2 | |
| Refine | China → USA | 12.9 | |
| Refine | China → Fed. Rep. of Germany (...1990) | 12.5 | |
| Mine | Bolivia (Plurinational State of) → China | 11.2 | |
| Refine | Netherlands → Italy | 9.7 | |
| Process ≈ | Viet Nam → France | 9.6 | |
| Refine | Rep. of Korea → USA | 9.5 |
Countries drawn as dashed boxes (in trade flows only)
- Mine: Myanmar
- Process: China; Viet Nam; Other Asia, nes; Philippines; Austria; USA; Fed. Rep. of Germany (...1990)
- Refine: China; USA; Japan; Austria; Canada; Israel; 3 more countries (Netherlands, France, Rep. of Korea)
- After refining: USA; Japan; Fed. Rep. of Germany (...1990); Rep. of Korea; Canada; Austria; 3 more countries (Netherlands, Israel, Italy)
Recycling loop
Recycling loop: no published rate. Eurostat publishes no end-of-life recycling input rate for tungsten.
Largest trade flows · 2024
Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 2 100 flows shown, covering 51.7 % of traded value.
| From → to | Product of stage | Million USD | Source |
|---|---|---|---|
| Fed. Rep. of Germany (...1990) → Austria | Recycle | 69.3 | |
| Fed. Rep. of Germany (...1990) → USA | Recycle | 55.2 | |
| China → Japan | Refine | 34.7 | |
| Dem. People's Rep. of Korea → China | Mine | 31.4 | |
| China → Rep. of Korea | Refine | 29.6 | |
| Myanmar → China | Mine | 29.1 | |
| China → USA | Process ≈ | 28.4 | |
| Fed. Rep. of Germany (...1990) → Finland | Recycle | 27.3 | |
| USA → Canada | Refine | 25.5 | |
| Other Asia, nes → China | Process ≈ | 23.1 |
≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.
Sites on record · 22 and 37 deposits and projects
59 of 59 shown
- AttungaDeposit (no mine) · Australia
- BadjaDeposit (no mine) · Australia
- BarruecopardoMine · Spain
- Biesies Tungsten Mine (Defunct)Mine · South Africa
- Bold HeadDeposit (no mine) · Australia
- Bolsa Negra MineMine · Bolivia
- BonyaDeposit (no mine) · Australia
- Chambilaya MineMine · Bolivia
- Chicote Grande MineMine · Bolivia
- ClevelandDeposit (no mine) · Australia
- Cookes Creek-Big HillDeposit (no mine) · Australia
- DavidsonProject (not producing yet) · Canada
- Deer HornProject (not producing yet) · Canada
- Defender Tungsten MineMine · United States
- Degana Tungsten Ore MineMine · India
- DolphinMine · Australia
- Enramada MineMine · Bolivia
- Freegold MountainProject (not producing yet) · Canada
- Glen EdenDeposit (no mine) · Australia
- GussarvshyttanDeposit (no mine) · Sweden
- Hatches CreekDeposit (no mine) · Australia
- Himalaya MineMine · Bolivia
- KaraMine · Australia
- Kara No. 2Deposit (no mine) · Australia
- KilbaDeposit (no mine) · Australia
- King Island TailingsDeposit (no mine) · Australia
- MactungProject (not producing yet) · Canada
- Mercedes MineMine · Bolivia
- Mina La ParrillaMine · Spain
- Minas de San FinsMine · Spain
- MoinaDeposit (no mine) · Australia
- MolyhilDeposit (no mine) · Australia
- Mount CarbineMine · Australia
- Mount LindsayDeposit (no mine) · Australia
- Mount MulgineDeposit (no mine) · Australia
- Mount PaynterDeposit (no mine) · Australia
- Mount PleasantProject (not producing yet) · Canada
- MPCMine · Myanmar
- O'CallaghansDeposit (no mine) · Australia
- Outpost Island MineMine · Canada
- Pasto BuenoProcessing plant · Peru
- Perry CreekDeposit (no mine) · Australia
- Reconquistada MineMine · Bolivia
- San Antonio MineMine · Bolivia
- SanduddenDeposit (no mine) · Sweden
- SissonProject (not producing yet) · Canada
- SkropenDeposit (no mine) · Sweden
- St DizierDeposit (no mine) · Australia
- StorträsketDeposit (no mine) · Sweden
- TallebungDeposit (no mine) · Australia
- Tommy BurnsDeposit (no mine) · Australia
- TorringtonDeposit (no mine) · Australia
- Tvåtjärnmyran NorthDeposit (no mine) · Sweden
- Ucumarini MineMine · Bolivia
- WatershedDeposit (no mine) · Australia
- Western QueenDeposit (no mine) · Australia
- White RockDeposit (no mine) · Australia
- Wolfram CampMine · Australia
- Yanco GlenDeposit (no mine) · Australia
One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.
United States view: Tungsten
These figures describe the United States only. They are not global figures.
- Net import reliance · 2025
- >50 %
- Import sources · 2021-24
- China26 %
- Germany14 %
- Bolivia8 %
- Vietnam8 %
- Other44 %
- Main uses
- Metallurgy.
Money
The open price series where one exists, and one estimate with its formula. No licensed market data is shown.
Price
There is no open price series for tungsten, so the atlas shows no price and no estimated value.
- No open price series for tungsten: the World Bank Pink Sheet does not cover it, and the price services that do are licensed, so no price is shown.
An estimated production value is computed only where an open price exists for the same product the mine figure counts (copper, nickel, zinc, tin and phosphate rock). Why prices are missing
Investment pipeline
announced figuresPlanned and under-construction tungsten projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.
MactungPlannedMine
Fireweed Metals Corp. · Macmillan Pass, Yukon Territory · Canada · Tungsten
“commencing a Feasibility Study” · status as printed on 2025-11-24
- Announced capital cost
No announced capital cost was read.
- Public backing
USD 15.8 MGrant · “awarded” · 2024-12-13
U.S. Department of Defense (Defense Production Act Title III)
The publisher's words: “Fireweed has been awarded US$15.8M (~C$22.5 M) from the U.S. Department of Defense under Title III of the Defense Production Act of 1950”
Tungsten West (Hemerdon tungsten and tin mine)Under constructionMine
Tungsten West PLC · Devon · United Kingdom · Tungsten
“Construction is underway” · status as printed on 2026-11-13
- Announced capital cost
No announced capital cost was read.
- Public backing
no amount statedStrategic project status · “recognised as Strategic Project in a third country (Commission Decision C(2025) 3491, annex item 12)” · 2025-06-04
European Commission
The publisher's words: “Tungsten West is an ongoing extraction project in the United Kingdom. The project promoted by Tungsten West PLC”
GBP 36 MEquity · “has announced an investment” · 2026-08-25
National Wealth Fund (United Kingdom)
The publisher's words: “The financing consists of a £36 million equity investment alongside up to £35 million of lending”
GBP 35 MLoan · “has announced an investment (up to £35 million of lending)” · 2026-08-25
National Wealth Fund (United Kingdom)
The publisher's words: “The financing consists of a £36 million equity investment alongside up to £35 million of lending”
Allied Material new tungsten powder plant, ToyamaPlannedProcessing
株式会社アライドマテリアル (A.L.M.T. Corp.) · near the Toyama works, Toyama Prefecture · Japan · Tungsten
“新工場を建設します; 2028 年度上期の稼働開始を目指し” · status as printed on 2026-04-09
- Announced capital cost
JPY 15.9 bn2026-04-09
construction of the new plant and expansion of related equipment for tungsten powder and tungsten carbide powder · 株式会社アライドマテリアル
The publisher's words: “に約 159 億円を投資します。”
- Public backing
no amount statedGrant · “助成金支援の対象となる「重要鉱物に係る供給確保計画」に認定されました” · 2026-04-09
Ministry of Economy, Trade and Industry (経済産業省)
The publisher's words: “より助成金支援の対象となる「重要鉱物に係る供給確保計画」に認定されました。”
Japan New Metals Akita plant, tungsten recycling expansionPlannedRecycling
日本新金属株式会社 (Mitsubishi Materials group) · Akita, Akita Prefecture · Japan · Tungsten
“増強することを決定しました; 設備導入は2026年度から順次開始し、2029年4月の操業開始を予定” · status as printed on 2026-09-09
- Announced capital cost
JPY 8 bn2026-09-09
expansion of the hydrometallurgical refining equipment and other equipment at the Akita plant, raising APT capacity to 2,400 tonnes a year (WO3 basis) · 三菱マテリアル株式会社
The publisher's words: “投資額は約80億円を見込んでいます。”
- Public backing
no amount statedGrant · “供給確保計画として、経済産業省より認定を受けた取り組み” · 2026-09-09
Ministry of Economy, Trade and Industry (経済産業省)
The publisher's words: “本投資は、経済安全保障推進法に基づき、重要鉱物の安定供給確保に資する供給確保計画として、経済産業省より認定を受けた取り組みです。”
Northern Katpar and Upper Kairakty tungsten projectPlannedMine and processing
Tau-Ken Samruk and Cove Capital · Kazakhstan · Kazakhstan · Tungsten
“Preparatory work has begun on developing the final feasibility study” · status as printed on 2025-11-06
- Announced capital cost
USD 1.1 bn2025-11-06
'volume of investments' for the joint development of both deposits, as announced; not a study estimate · Samruk-Kazyna JSC
The publisher's words: “The volume of investments is about USD1.1 billion.”
- Public backing
no amount statedEquity · “signed an agreement on the joint development” · 2025-11-06
Tau-Ken Samruk, national mining company of Kazakhstan (Samruk-Kazyna group)
The publisher's words: “The national mining company Tau-Ken Samruk and the American investment company Cove Capital have signed an agreement on the joint development of the Northern Katpar and Upper Kairakty tungsten deposits.”
Linked, not quoted (the publisher's terms forbid reuse, so no figure is taken from the page): Tau-Ken Samruk
A short, hand-read list, not a census: 77 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.
Public support instruments
Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names tungsten, and general critical-minerals instruments (marked). Each is one statement by its publisher.
2024-05-23in force from · European UnionJoint purchasingin force
The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.
Covers: “strategic raw materials” · Materials: Cobalt, Copper, Gallium, Germanium, Lithium, Graphite, Nickel, Rare earths, Tungsten
The publisher's words: “The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union”
2 further statements from the source
joint negotiation of purchases allowed (Article 25(5))
The publisher's words: “may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement”
coordination of strategic stocks (Article 23)
The publisher's words: “shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials”
2024-08-29published · United StatesStockpileannounced
Federal Register notice seeking comments on the proposed fiscal year 2026 plan for National Defense Stockpile acquisitions, including antimony, tungsten and neodymium-praseodymium oxide.
Covers: “Proposed Fiscal Year 2026 Annual Materials Plan (potential acquisitions, conversions and disposals of the National Defense Stockpile)” · Materials: Antimony, Tungsten, Rare earths
The publisher's words: “is seeking public comments on the potential market impact of proposed changes to the Fiscal Year (FY) 2026 Annual Materials Plan (AMP)”
4 further statements from the source
potential acquisition: antimony, 700 metric tons
The publisher's words: “Antimony....................................... MT............................... 700”
potential acquisition: tungsten, 587,000 lbs W
The publisher's words: “Tungsten....................................... Lbs W............................ 587,000”
potential acquisition: NdPr oxide, 300 metric tons
The publisher's words: “Neodymium-Praseodymium Oxide................... MT............................... 300”
nature of the stockpile
The publisher's words: “The NDS is a strategic stockpile, not an economic stockpile. It is not intended to influence prices in the market”
2024-10-02announced · BrazilFundannounced
BNDES and Brazil's Ministry of Mines and Energy set up an equity investment fund for strategic minerals, for junior and mid-sized companies in exploration and new mines; managers were named in October 2024; it was still raising capital in 2026.
BRL 250 M
Covers: “Fundo de Investimento em Participações (FIP) em Minerais Estratégicos no Brasil; also names Metais do Grupo da Platina and Potássio” · Materials: Cobalt, Copper, Tin, Graphite, Lithium, Manganese, Molybdenum, Niobium, Nickel, Silicon, Tantalum, Rare earths, Titanium, Tungsten, Uranium, Vanadium, Zinc, Phosphate rock
The publisher's words: “O BNDES vai aportar até R$ 250 milhões no FIP, com participação até 25% do total”
2 further statements from the source
target size of the fund
The publisher's words: “O FIP é uma parceria lançada entre o BNDES e o MME para mobilizar mais de R$ 1 bilhão”
standing in 2026
The publisher's words: “O fundo está em fase de captação com aportes previstos ao longo do primeiro semestre de 2026 para início dos investimentos”
2024-11-25announced · AustraliaOther supportannounced
The Treasurer announced the bill for a Critical Minerals Production Tax Incentive, a tax offset on the costs of processing and refining critical minerals in Australia for a limited number of years per project.
Covers: “relevant processing and refining costs for Australia’s 31 critical minerals”
critical minerals in general; the source does not name tungsten
The publisher's words: “It establishes a Critical Minerals Production Tax Incentive worth ten per cent of relevant processing and refining costs for Australia’s 31 critical minerals”
2 further statements from the source
a bill on that date, not yet law
The publisher's words: “Today the Government will introduce the Future Made in Australia (Production Tax Credit and Other Measures) Bill 2024 to Parliament”
period and length
The publisher's words: “for critical minerals processed and refined between 2027–28 and 2039–40, for up to ten years per project”
2024-12-06published · AustraliaLoan programmein force
Export Finance Australia manages the Australian Government's Critical Minerals Facility, which lends to and invests in critical minerals projects on the National Interest Account; the facility was later expanded.
AUD 4 bn
Covers: “Critical Minerals Facility (projects aligned with Australia's Critical Minerals Strategy)”
critical minerals in general; the source does not name tungsten
The publisher's words: “The support will be provided by Export Finance Australia (EFA) through the Government’s $4 billion Critical Minerals Facility (CMF).”
2 further statements from the source
expanded to $5 billion; loans and equity support (release of 12 January 2026)
The publisher's words: “to be drawn from the expanded $5 billion Critical Minerals Facility, which provides government-backed loans and equity support for projects”
who can access the facility (undated page of Export Finance Australia)
The publisher's words: “Projects that are aligned with the Critical Minerals Strategy and are otherwise in Australia’s national interest, may be able to access finance through this facility, subject to our due diligence.”
2024-12-27in force from · United StatesOther supportin force
Final Treasury regulations for the Section 45X advanced manufacturing production credit, a tax credit for producers of applicable critical minerals in the United States that is set as a share of their production costs.
Covers: “applicable critical minerals (advanced manufacturing production credit, section 45X)”
critical minerals in general; the source does not name tungsten
The publisher's words: “For any applicable critical mineral, the credit amount is equal to 10 percent of the costs incurred by the taxpayer with respect to production of such mineral.”
1 further statements from the source
what the credit is for
The publisher's words: “the advanced manufacturing production credit established by the Inflation Reduction Act of 2022 to incentivize the production of eligible components within the United States”
2025-01-29announced · IndiaFundin force
India's Union Cabinet approved the launch of the National Critical Mineral Mission, which funds the critical minerals value chain, backs the purchase of mineral assets abroad and proposes a national stockpile of critical minerals.
INR 163 bn
Covers: “National Critical Mineral Mission (critical mineral resources vital to Green Technologies)”
critical minerals in general; the source does not name tungsten
The publisher's words: “has approved the launch of the National Critical Mineral Mission (NCMM) with an expenditure of Rs.16,300 crore and expected investment of Rs.18,000 crore by PSUs, etc.”
1 further statements from the source
assets abroad and a stockpile
The publisher's words: “It also proposes development of stockpile of critical minerals within the country.”
2025-03-25announced · European UnionOther supportin force
The Commission adopted the first list of Strategic Projects under the Critical Raw Materials Act; the status brings coordinated support on access to finance and offtakers, and capped permitting times.
Covers: “47 Strategic Projects to boost domestic strategic raw material capacities (extraction, processing, recycling, substitution)” · Materials: Lithium, Nickel, Cobalt, Manganese, Graphite, Magnesium, Tungsten
The publisher's words: “The Commission has adopted, for the first time, a list of 47 Strategic Projects to boost domestic strategic raw material capacities”
3 further statements from the source
expected capital investment of the 47 projects (the projects' own cost, not public money)
The publisher's words: “the 47 Strategic Projects have an expected overall capital investment of €22.5 billion”
what the status brings
The publisher's words: “coordinated support by the Commission, Member States and financial institutions to become operational, notably regarding access to finance and support to connect with relevant off-takers”
permitting time limits
The publisher's words: “the permit-granting process will not exceed 27 months for extraction projects and 15 months for other projects”
2025-04-18announced · United StatesOther supportin force
The Federal Permitting Improvement Steering Council began listing critical mineral production projects as FAST-41 transparency projects, which publishes their federal review and permitting schedules; this is a permitting status and carries no money.
Covers: “critical mineral production projects (transparency projects on the Federal Permitting Dashboard)”
critical minerals in general; the source does not name tungsten
The publisher's words: “Inclusion on the Permitting Dashboard as a transparency project makes the environmental review and authorizations schedule for these vital mineral production projects publicly available”
2 further statements from the source
basis in the executive order on mineral production
The publisher's words: “in response to President Trump’s Executive Order, Immediate Measures to Increase American Mineral Production”
number of projects by November 20, 2025
The publisher's words: “50 critical mineral and mining projects are now receiving the benefits of FAST-41 traditional and transparency coverage”
2025-06-04announced · European UnionOther supportin force
The Commission adopted the first list of Strategic Projects in third countries under the Critical Raw Materials Act; the status brings coordinated support on access to finance and contacts with offtakers.
Covers: “13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories” · Materials: Lithium, Nickel, Cobalt, Manganese, Graphite, Rare earths, Copper, Tungsten
The publisher's words: “The Commission adopted the first list of 13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories.”
3 further statements from the source
capital investment the 13 projects need (the projects' own cost, not public money)
The publisher's words: “It is estimated that the 13 Strategic Projects outside of the EU need an overall capital investment of €5.5 billion to start operations.”
what the status brings
The publisher's words: “coordinated support by the Commission, Member States and financial institutions in the form of facilitating access to finance and contacts with relevant off-takers”
where the projects are
The publisher's words: “seven are located in Canada, Greenland, Kazakhstan, Norway, Serbia, Ukraine, Zambia, with whom the EU has a strategic partnership on raw materials value chains”
2025-06-17announced · G7Other supportannounced
G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.
Covers: “critical minerals”
critical minerals in general; the source does not name tungsten
The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
3 further statements from the source
launch of the plan
The publisher's words: “We are launching a G7 Critical Minerals Action Plan”
roadmap content
The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”
capital mobilisation
The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
2025-10-23announced · United States (with ADQ of Abu Dhabi as a matching investor)Fundannounced
The U.S. development finance agency DFC committed an investment to the Orion Critical Mineral Consortium, an investment vehicle led by Orion Resource Partners and matched by Orion funds and the Abu Dhabi sovereign investor ADQ.
USD 1.8 bn · “brings the current size of the consortium to $1.8 billion”
Covers: “strategic critical minerals projects in DFC-eligible markets”
critical minerals in general; the source does not name tungsten
The publisher's words: “brings the current size of the consortium to $1.8 billion”
3 further statements from the source
purpose of the consortium
The publisher's words: “has created Orion Critical Mineral Consortium (Orion CMC) to invest in strategic critical minerals projects in DFC-eligible markets”
who matched the commitment
The publisher's words: “This commitment, which has been matched by both funds managed by Orion Resource Partners and ADQ, an active sovereign investor”
DFC's own share, from its undated Public Information Summary for the board: a further $900 million on top of $600 million
The publisher's words: “$900 million in addition to the $600 million already approved”
2025-11-04published · CanadaOther supportannounced
Budget 2025 proposes to widen the Critical Mineral Exploration Tax Credit, a tax credit for investors in flow-through shares of exploration companies, to twelve more critical minerals for agreements made until the end of March 2027.
Covers: “additional critical minerals: bismuth, cesium, chromium, fluorspar, germanium, indium, manganese, molybdenum, niobium, tantalum, tin, and tungsten” · Materials: Chromium, Germanium, Manganese, Molybdenum, Niobium, Tantalum, Tin, Tungsten
The publisher's words: “Budget 2025 proposes to expand the eligibility of the CMETC to include the following additional critical minerals: bismuth, cesium, chromium, fluorspar, germanium, indium, manganese, molybdenum, niobium, tantalum, tin, and tungsten.”
3 further statements from the source
what the credit is
The publisher's words: “The CMETC is equal to 30 per cent of specified mineral exploration expenses incurred in Canada and renounced to flow-through share investors.”
period of the measure
The publisher's words: “This measure would apply to expenditures renounced under eligible flow-through share agreements entered into after Budget Day and on or before March 31, 2027.”
minerals already eligible before the proposal
The publisher's words: “nickel, cobalt, graphite, copper, rare earth elements, vanadium, tellurium, gallium, scandium, titanium, magnesium, zinc, platinum group metals, uranium, and lithium (including lithium from brines)”
2025-11-04published · CanadaFundannounced
Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.
CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”
Covers: “critical minerals projects and companies”
critical minerals in general; the source does not name tungsten
The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
3 further statements from the source
tools of the fund
The publisher's words: “including equity investments, loan guarantees, and offtake agreements”
First and Last Mile Fund
The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”
absorbs the Critical Minerals Infrastructure Fund
The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
2025-11-18announced · European UnionJoint purchasingin force
The Commission opened registrations for the Raw Materials Mechanism, which links buyers and sellers of strategic raw materials and enables demand aggregation, joint purchasing and investment consortia.
Covers: “buyers and sellers of strategic raw materials (Raw Materials Mechanism under the EU Energy and Raw Materials Platform)”
critical minerals in general; the source does not name tungsten
The publisher's words: “the European Commission opened registrations for the new Raw Materials Mechanism under the EU Energy and Raw Materials Platform”
3 further statements from the source
what the mechanism enables
The publisher's words: “enable cooperation between companies, such as demand aggregation, joint purchasing, and investment consortia”
first matchmaking round
The publisher's words: “The first matchmaking round will launch in Q1 2026.”
later result (press release of 9 October 2026)
The publisher's words: “the Raw Materials Mechanism, established to aggregate demand and supply and identify potential offtakers, has generated more than 30 matches for 10 materials”
2025-11-22published · United KingdomFundannounced
The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.
GBP 50 M · “up to £50 million”
Covers: “critical mineral projects in the UK”
critical minerals in general; the source does not name tungsten
The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
2 further statements from the source
stockpiling under consideration
The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”
later programme page (published 22 June 2026): grant share
The publisher's words: “with £45 million of this available as grant funding”
2025-11-24published · United KingdomLoan programmein force
UK Export Finance opened the Critical Goods Export Development Guarantee, a partial state guarantee on commercial loans to UK-based suppliers of critical mineral products, alongside its existing Critical Minerals Supply Finance.
Covers: “UK-based businesses that supply critical mineral products to UK exporters (minerals of the UK Criticality Assessment 2024 and growth minerals)”
critical minerals in general; the source does not name tungsten
The publisher's words: “The Critical Goods Export Development Guarantee (Critical Goods EDG) is now available for UK-based businesses that supply critical mineral products to UK exporters.”
3 further statements from the source
share guaranteed (the page's worked example)
The publisher's words: “UKEF provides an 80% guarantee, reducing the lender’s risk and enabling them to provide the loan to the UK manufacturer”
existing product for overseas suppliers
The publisher's words: “UKEF’s existing Critical Minerals Supply Finance, which provides finance for overseas companies that have agreements in place to supply critical minerals products to UK exporters”
minerals covered
The publisher's words: “minerals listed in the UK Criticality Assessment 2024 as well as growth minerals such as beryllium, chromium, copper and uranium”
2026-01-14signed · United StatesPrice floorannounced
Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.
Covers: “processed critical minerals and their derivative products (PCMDPs)”
critical minerals in general; the source does not name tungsten
The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
2026-02-02announced · United StatesStockpileannounced
The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.
USD 10 bn · “a Direct Loan of up to $10 billion”
Covers: “essential raw materials”
critical minerals in general; the source does not name tungsten
The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
4 further statements from the source
what it establishes
The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”
storage
The publisher's words: “that will store essential raw materials in facilities across the United States”
borrower structure
The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”
later EXIM release of May 4, 2026 restating the loan
The publisher's words: “The transaction includes a direct loan of up to $10 billion”
2026-06-11published · ArgentinaOther supportin force
Argentina's large-investment incentive regime (RIGI), created by law 27.742, grants approved single-project vehicles tax, customs and foreign-exchange incentives; the Economy Ministry published an official register of approved and pending projects, mining among the sectors.
Covers: “Régimen de Incentivo para Grandes Inversiones (RIGI); sectores estratégicos como energía, petróleo y gas, minería, infraestructura y energías renovables”
critical minerals in general; the source does not name tungsten
The publisher's words: “El Ministerio de Economía puso a disposición del público una nueva página web con la información oficial y actualizada sobre el Régimen de Incentivo para Grandes Inversiones (RIGI)”
4 further statements from the source
projects approved by resolution on that date (all sectors)
The publisher's words: “16 proyectos US$ 29.892 millones de inversión”
legal basis, as recited in a mining approval (Resolución 801/2026)
The publisher's words: “Que por la ley 27.742 se creó el Régimen de Incentivo para Grandes Inversiones (RIGI)”
tax and customs incentives applied to an approved mining project (Resolución 801/2026)
The publisher's words: “aplicación de los incentivos tributarios y aduaneros establecidos por el capítulo IV del título VII de la ley 27.742”
foreign-exchange incentives applied to an approved mining project (Resolución 801/2026)
The publisher's words: “los incentivos cambiarios previstos en el capítulo V del título VII de la ley 27.742”
2026-07-15announced · GermanyFundannounced
Germany's raw materials fund, through which KfW takes equity stakes in mining, processing and recycling companies on behalf of the federal government, is to be enlarged; the increase is subject to the budget procedure in parliament.
EUR 1.5 bn · “auf insgesamt 1,5 Milliarden Euro”
Covers: “Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen”
critical minerals in general; the source does not name tungsten
The publisher's words: “Es ist beabsichtigt, die Mittel für Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen auf insgesamt 1,5 Milliarden Euro aufzustocken.”
4 further statements from the source
the increase is not yet legislated
The publisher's words: “Die Aufstockung des Rohstofffonds ist Gegenstand des anstehenden parlamentarischen Haushaltsverfahrens.”
the two investments made so far
The publisher's words: “150 Millionen Euro Eigenkapital für die klimaneutrale Lithiumförderung von Vulcan Energy Resources sowie 50 Millionen Euro für ein Projekt zur Förderung von Seltenen Erden des Unternehmens Arafura Rare Earths”
original mandate of the fund (undated KfW factsheet)
The publisher's words: “beauftragt, bis zu 1 Mrd. EUR in das Eigenkapital von Bergbau-, Verarbeitungs- und Recyclingunternehmen zu investieren”
who decides (KfW notice of 1 April 2026 on the second investment)
The publisher's words: “Die Entscheidung, ob in ein Projekt investiert wird, trifft indes der Bund.”
2026-07-22announced · ItalyFundin force
Italy's National Made in Italy Fund became operational with the appointment of its two managers; its companies arm takes equity stakes with particular attention to the whole value chain of critical raw materials.
EUR 900 M · “dotazione complessiva di 900 milioni di euro”
Covers: “filiere strategiche nazionali e sicurezza degli approvvigionamenti di materie prime critiche (dall’estrazione fino al riciclo e al riuso)”
critical minerals in general; the source does not name tungsten
The publisher's words: “il Fondo dispone di una dotazione complessiva di 900 milioni di euro per rafforzare le filiere strategiche nazionali e garantire la sicurezza degli approvvigionamenti di materie prime critiche”
3 further statements from the source
the fund enters its operational phase
The publisher's words: “il Fondo Nazionale del Made in Italy (FNMI) entra nella fase operativa”
companies arm (equity)
The publisher's words: “Il Fondo Imprese, con una dotazione di 600 milioni di euro, realizzerà invece investimenti diretti e indiretti, a condizioni di mercato, nel capitale delle imprese operanti nelle filiere strategiche.”
critical raw materials value chain
The publisher's words: “Particolare attenzione sarà riservata all’intera catena del valore delle materie prime critiche: dall’estrazione alla lavorazione e alla trasformazione, dall’approvvigionamento alla distribuzione, fino al riciclo e al riuso.”
2026-09-15published · European UnionStockpileannounced
The Commission called for expressions of interest to select the entity that will design, set up and run a pilot stockpiling mechanism for critical raw materials.
Covers: “pilot stockpiling mechanism for critical raw materials”
critical minerals in general; the source does not name tungsten
The publisher's words: “The purpose of this call is to determine the entity that will be designated to carry out the stockpiling pilot project.”
2 further statements from the source
what the entity is to do
The publisher's words: “supporting the design, set-up, procurement, storage, management, release and operational testing of a pilot stockpiling mechanism for critical raw materials”
deadline
The publisher's words: “Deadline for submitting applications 09/10/2026”
2026-10-09announced · European UnionOther supportin force
The Commission selected a second list of Strategic Projects in the EU under the Critical Raw Materials Act and reported on financing mobilised since the RESourceEU plan.
Covers: “46 new Strategic Projects across 16 Member States (extraction, processing, recycling), covering 15 of the 17 strategic raw materials” · Materials: Lithium, Nickel, Cobalt, Manganese, Graphite, Magnesium, Tungsten, Rare earths
The publisher's words: “the European Commission today announced that it has selected 46 new Strategic Projects across 16 Member States”
3 further statements from the source
financial support mobilised since RESourceEU
The publisher's words: “Team Europe has mobilised more than €2 billion in financial support that has been committed through the Innovation Fund, State aid, and the European Investment Bank”
progress of the 2025 list
The publisher's words: “To date, 25 Strategic Projects have completed their environmental impact assessment and 17 have obtained a construction permit”
total number of Strategic Projects designated
The publisher's words: “The Commission has designated 106 strategic projects under the Critical Raw Materials Act (CRMA) overall.”
There is no open price series for tungsten, so these instruments are listed without a chart.
These figures are informational, not financial advice.
Sustainability
Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.
Carbon
Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.
Not computed: No open refining series by country
- Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water
Share of the material's mine sites on record that lie in high or extremely high baseline water stress.
9.5%of mine sites on record
Higher than 48% of the other 25 materials with rated mine sites.
- 2 of 21 sites with a class (21 mine and brine sites on record).
- Counted by site, not by tonnage: it is not a share of production.
- "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
Land
Land visibly used by mining.
Not available per material: the area is mapped per country for all commodities together.
- Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate).
No published rate for this material.
- Eurostat publishes no end-of-life recycling input rate for tungsten.
- 4 EU targets apply to this material; they are listed below.
There is no overall score: the four figures measure different things and are not added up. How to read these figures
The figures behind the indicators
Grid-carbon proxy for refining
estimated · proxyNot computed: No open refining series by country
Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
Water stress where the mines are
estimated · by site9.5%of mine sites on record lie in high or extremely high water stress (2 of 21)
- Low (<10%)15 sites
- Low - Medium (10-20%)1 site
- Medium - High (20-40%)1 site
- Extremely High (>80%)2 sites
- Arid and Low Water Use2 sites
Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.
Circularity
Recycling's share of EU demand (end-of-life recycling input rate)
Eurostat publishes no end-of-life recycling input rate for tungsten.
EU targets that apply
10% EU extraction benchmark from 31 December 2030
EU extraction capacity, for strategic raw materials overall
Legal text: “by 2030 … at least 10 % of the Union’s annual consumption of strategic raw materials” Regulation (EU) 2024/1252 (Critical Raw Materials Act), Article 5(1)(a)(i) ↗
40% EU processing benchmark from 31 December 2030
EU processing capacity, for strategic raw materials overall
Legal text: “by 2030 … at least 40 % of the Union’s annual consumption of strategic raw materials” Regulation (EU) 2024/1252 (Critical Raw Materials Act), Article 5(1)(a)(ii) ↗
25% EU recycling benchmark from 31 December 2030
EU recycling capacity, for strategic raw materials overall
Legal text: “by 2030 … at least 25 % of the Union’s annual consumption of strategic raw materials” Regulation (EU) 2024/1252 (Critical Raw Materials Act), Article 5(1)(a)(iii) ↗
65% Single-country limit from 31 December 2030
Largest share of EU consumption that may come from one non-EU country, per strategic raw material and processing stage
Legal text: “by 2030 … no third country accounts for more than 65 % of the Union’s annual consumption of such a strategic raw material” Regulation (EU) 2024/1252 (Critical Raw Materials Act), Article 5(1)(b) ↗
Read in the original Official Journal version; later amendments are not reflected.
Risks & policy
Export controls in force
Compiled by USGS, effective January 2026. Not a live feed.
- ▲ BanRussia2022
Export ban: Steel waste and scrap, tungsten scrap, and enriched uranium (2022).
Source ↗ - ▲ LicenceChina2025
Export licensing requirement for materials and technologies: Antimony (2024), bismuth (2025), synthesized diamond (2025), gallium (2023), germanium (2023), graphite (2023), indium (2025), magnesium materials (2024), molybdenum (2025), rare earths (2025), silver (2026), tellurium (2025), tungsten (2025), and items related to lithium batteries and artificial graphite anode materials (2025).
Source ↗
Chokepoints at sea
The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page
What if?
Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.
What the atlas does not know about tungsten
How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.
Data coverage
Mines on record: 4.1% (3/11)
Plants on record: no open refining series by country
Owner or operator known: 2% (1/11)
Assurance known: no public assurance list is ingested yet
Mines:4.1% of world output lies in countries with a record (3 of 11 countries)(Mine production, 2025)
Producer countries without a record: China 79%, Vietnam 3.5%, Kazakhstan 2.8%, Korea, North 2.3%, Russia 2.3%, Rwanda 1.5%, Austria 1%, Portugal 0.8%
- Processing plants: No open refining series by country
Owners and operators:2% of world output lies in countries with a record (1 of 11 countries)(Mine production, 2025)
Producer countries without a record: China 79%, Vietnam 3.5%, Kazakhstan 2.8%, Korea, North 2.3%, Russia 2.3%, Rwanda 1.5%, Australia 1.2%, Austria 1%, Spain 0.9%, Portugal 0.8%
- Assurance: No public assurance list is ingested yet
A country in these lists marks missing data, not missing industry.
Mining and refining: who leads
USGS MCS 2026, 2025 (estimated)
- Mining:China 79% (about 4 in 5), 2025
No open refining series by country
Price transparency
No open price series for tungsten: the services that publish one are licensed, so no price is shown.
Sources
Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.
- CEPII BACI 202601 ↗40 records used
- Licence
- Etalab Open Licence 2.0
- As of
- 2024
- Confidence
- Estimated
- Geoscience Australia critical minerals 2025 ↗30 records used
- Licence
- CC-BY-4.0
- As of
- 2025
- Confidence
- Reported
- USGS OFR 2017-1079 (Latin America and the Caribbean) ↗10 records used
- Licence
- Public domain (U.S. Government work)
- As of
- 2014
- Confidence
- Reported
- OpenStreetMap (Overpass) ↗8 records used
- Licence
- ODbL-1.0
- As of
- 2026
- Confidence
- Estimated
- USGS MCS 2026 ↗7 records used
- Licence
- CC0-1.0
- As of
- 2024–2026
- Confidence
- Reported · Estimated
- NRCan critical minerals 2026 ↗6 records used
- Licence
- OGL-Canada-2.0
- As of
- 2026
- Confidence
- Reported
- SGU mineral resources 2026 ↗5 records used
- Licence
- CC0-1.0
- As of
- 1998–2023
- Confidence
- Reported
- WRI Aqueduct 4.0 ↗1 record used
- Licence
- CC-BY-4.0
- As of
- 2023
- Confidence
- Estimated
Source registry for this material
- Mineral Commodity Summaries 2026 Data Release ↗, U.S. Geological Survey, National Minerals Information Center. Licence: CC0-1.0. annual (February).
- BACI bilateral trade flows at HS6 (version 202601) ↗, CEPII. Licence: Etalab Open Licence 2.0. annual.
History & talk
Revision history and discussion are coming soon.
Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.
Talk
Questions, doubts and pointers about this page. Anyone can write; a reviewer reads each comment before it appears. Comments are public: no personal data, please.
Nobody has written here yet.
What we don't know yet
No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.
- Leading refining country: No open refining table by country.Add data: Leading refining country: No open refining table by country.
- Recycling's share of EU demand: No published rate.Add data: Recycling's share of EU demand: No published rate.
Report an error or suggest something
How to cite OpenOre
Lorenzo Sivillica (2026). OpenOre: open data on raw-material supply chains, data release v1.1. OpenOre, https://openore.org. DOI pending (Zenodo).
The dataset's DOI is pending: the first release is being deposited on Zenodo. Data and downloads · Licence: ODbL 1.0