OpenOrebeta

Zinc

Base metals

Compare

Embed this in a page

Paste this code into a web page to show the map of this material, without menus. It carries a line that names OpenOre and links back here, and it always shows the current data.

What to embed

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

China mined 32% (USGS) of the world's zinc in 2025 (estimated).

32%

of the world's zinc was mined in China in 2025 (estimated), according to USGS · about 1 in 3

ANNUAL 2025

  • Leading mining country

    32%

    China, 2025 (estimated), USGS

  • Sites on record

    175

    Mines and plants in the open sources. Coverage is partial. Also on record: 62 deposits and projects, which are not counted.

  • Recycling's share of EU demand

    34%

    2022, EU only

Overview

Zinc concentrate is smelted and refined into metal, used mainly to galvanise steel against corrosion and in brass and die-cast alloys.

Follow the atom

Map

Basemap: Natural Earth (public domain)
  • Share of world mine output
  • Mine or brine operation
  • Processing site
  • Deposit or project (not a mine or a plant yet)

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

2025

Key facts

Group
Base metals
Stages in the atlas
Reserves · Mine · Refine · Recycle
World mine production, 2025
13 000 thousand metric tons (estimated)
Open price series
Yes: monthly, in $/mt

Open on the globe →Flow diagram →

Leading countries

Mine · USGS, 2025 (estimated)

  1. Chinaabout 1 in 332%
  2. Peruabout 1 in 1012%
  3. Australiaabout 1 in 108.5%
  4. Indiaabout 1 in 206.7%
  5. Mexicoabout 1 in 206%

The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.

Supply chain

Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.

Reserves

Concentration

ANNUAL 2025

Australia holds about 1 in 4 (27 %) of the world's zinc reserves recorded here.

Reserves · 2025

(Data in thousand metric tons, zinc content, unless otherwise specified)

Top 3 countries
63.5 %
Australia, China, Russia

Who holds what

Mine

Concentration

ANNUAL 2025

China mines about 1 in 3 (32 %) of the world's zinc recorded here.

Mine production · 2025 (estimated)

(Data in thousand metric tons, zinc content, unless otherwise specified)

Top 3 countries
51.5 %
China, Peru, Australia

Who holds what

  • China4 100 kt31.5 %
  • Other countries2 000 kt15.4 %
  • Peru1 500 kt11.5 %
  • Australia1 100 kt8.5 %
  • India870 kt6.7 %
  • Mexico780 kt6.0 %
  • United States670 kt5.2 %
  • Bolivia500 kt3.8 %
  • Russia430 kt3.3 %
  • Kazakhstan360 kt2.8 %
  • Sweden230 kt1.8 %
  • World total13 000 kt

Refine

No data yet: No open refining data yet for zinc

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Recycle

No data yet: Zinc, recycle stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Flow through the stages

Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.

The diagram is wider than this screen. Swipe it sideways to see every stage.

MineMine production · 2025 (estimated)In trade flows only (no row in this table)RefineNo open table by countryfor this stage in thissourceIn trade flows only (no row in this table)After refiningNo record of whatimporters do with therefined productIn trade flows only (no row in this table)Canada → USA: 1 111 million USD, 2024Australia → China: 886.5 million USD, 2024Peru → China: 816.4 million USD, 2024Mexico → Rep. of Korea: 440.8 million USD, 2024United States → Canada: 427.1 million USD, 20247 more countries → China: 356 million USD, 2024Kazakhstan → China: 327.9 million USD, 2024Bolivia → 7 more countries: 318.5 million USD, 2024Bolivia → China: 318.3 million USD, 20247 more countries → USA: 307.7 million USD, 2024Finland → Netherlands: 277.2 million USD, 2024Russia → China: 265.4 million USD, 2024South Africa → China: 250.2 million USD, 20247 more countries → Türkiye: 245.3 million USD, 2024Belgium-Luxembourg (...1998) → 7 more countries: 245 million USD, 2024Australia → Rep. of Korea: 239.5 million USD, 2024United States → China: 231.7 million USD, 2024Sweden → Finland: 231.6 million USD, 2024Spain → Singapore: 230.9 million USD, 2024United States → Rep. of Korea: 225 million USD, 2024Kazakhstan → China: 214.7 million USD, 2024Peru → Spain: 214.4 million USD, 2024Rep. of Korea → 2 more countries: 213.5 million USD, 2024Bolivia → Rep. of Korea: 210.3 million USD, 2024Mexico → Spain: 209.7 million USD, 2024United States → Spain: 189.6 million USD, 2024Eritrea → China: 179.7 million USD, 2024Brazil → 7 more countries: 168.4 million USD, 2024Kazakhstan → 2 more countries: 163.5 million USD, 2024Mexico → 7 more countries: 162.8 million USD, 2024Russia → Kazakhstan: 157.2 million USD, 2024Finland → Fed. Rep. of Germany (...1990): 156.7 million USD, 2024Australia → Canada: 152.9 million USD, 2024Spain → Türkiye: 151.5 million USD, 2024Türkiye → 7 more countries: 145.3 million USD, 2024Mexico → China: 144.4 million USD, 2024Spain → Fed. Rep. of Germany (...1990): 143.9 million USD, 2024China 31.5 %Peru 11.5 %Australia 8.5 %India 6.7 %Mexico 6.0 %United States 5.2 %Bolivia 3.8 %Russia 3.3 %Kazakhstan 2.8 %Sweden 1.8 %Other / not attributed 18.9 %South AfricaBelgium-Luxembourg (...1998)EritreaBrazilTürkiyeChinaCanadaRep. of KoreaSpainFinlandKazakhstan7 more countriesUSAChinaTürkiyeFed. Rep. of Germany (...1990)NetherlandsSingapore2 more countriesRecycling back into supply: zinc 34.0 % (2022), EU only
  • Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025
  • Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 6 077 flows, covering 36.8 % of traded value.
  • Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
  • Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
  • Return arrow: recycling's share of EU demand (end-of-life recycling input rate). EU only, so it cannot be compared with the world shares above. Width: 1 px at 0 % to 10 px at 100 %.
Table of what is drawn (30 country marks, 40 trade flows)
Country shares per stage, from USGS MCS 2026.
StageCountryShareAmountSource
Mine 2025China31.5 %4 100 kt
Mine 2025Peru11.5 %1 500 kt
Mine 2025Australia8.5 %1 100 kt
Mine 2025India6.7 %870 kt
Mine 2025Mexico6.0 %780 kt
Mine 2025United States5.2 %670 kt
Mine 2025Bolivia3.8 %500 kt
Mine 2025Russia3.3 %430 kt
Mine 2025Kazakhstan2.8 %360 kt
Mine 2025Sweden1.8 %230 kt
Mine 2025Other / not attributed18.9 %2 000 ktthe source's own "other" row
Recorded trade flows drawn as bands, by value, 2024. ≈ marks a customs code that mixes grades or forms.
Product of stageFrom → toMillion USDSource
MineAustralia → China886.5
MinePeru → China816.4
RefineCanada → USA571
RefineCanada → USA540
MineMexico → Rep. of Korea440.8
MineUSA → Canada427.1
RefineAustralia → China356
RefineKazakhstan → China327.9
MineBolivia (Plurinational State of) → China318.3
RefineFinland → Netherlands277.2
MineRussian Federation → China265.4
MineSouth Africa → China250.2
RefineIran → Türkiye245.3
MineBelgium-Luxembourg (...1998) → Netherlands245
MineAustralia → Rep. of Korea239.5
MineUSA → China231.7
MineSweden → Finland231.6
RefineSpain → Singapore230.9
MineUSA → Rep. of Korea225
MineKazakhstan → China214.7
MinePeru → Spain214.4
RefineRep. of Korea → India213.5
MineBolivia (Plurinational State of) → Rep. of Korea210.3
MineMexico → Spain209.7
MineUSA → Spain189.6
MineEritrea → China179.7
MineBolivia (Plurinational State of) → Belgium-Luxembourg (...1998)169.9
MineBrazil → Sweden168.4
RefineMexico → USA164.8
RefineKazakhstan → Russian Federation163.5
MineMexico → Japan162.8
MineRussian Federation → Kazakhstan157.2
RefineFinland → Fed. Rep. of Germany (...1990)156.7
MineAustralia → Canada152.9
RefineSpain → Türkiye151.5
MineBolivia (Plurinational State of) → Japan148.6
MineTürkiye → Belgium-Luxembourg (...1998)145.3
MineMexico → China144.4
RefineSpain → Fed. Rep. of Germany (...1990)143.9
RefineMexico → USA142.8

Countries drawn as dashed boxes (in trade flows only)

  • Mine: South Africa; Belgium-Luxembourg (...1998); Eritrea; Brazil; Türkiye
  • Refine: China; Canada; Rep. of Korea; Spain; Finland; Kazakhstan; 7 more countries (Australia, Belgium-Luxembourg (...1998), Japan, Mexico, Iran, Netherlands, Sweden)
  • After refining: USA; China; Türkiye; Fed. Rep. of Germany (...1990); Netherlands; Singapore; 2 more countries (India, Russian Federation)

Recycling loop

  • Zinc: 34.0 % (2022, European Union)

Largest trade flows · 2024

Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 6 077 flows shown, covering 36.8 % of traded value.

Largest trade flows 2024
From → toProduct of stageMillion USDSource
Australia → ChinaMine886.5
Peru → ChinaMine816.4
Canada → USARefine571
Canada → USARefine540
Mexico → Rep. of KoreaMine440.8
USA → CanadaMine427.1
Australia → ChinaRefine356
Kazakhstan → ChinaRefine327.9
Bolivia (Plurinational State of) → ChinaMine318.3
Finland → NetherlandsRefine277.2

≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.

Sites on record · 175 and 62 deposits and projects

237 of 237 shown

One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.

United States view: Zinc

These figures describe the United States only. They are not global figures.

Net import reliance · 2025
73 %
Import sources · 2021-24
  • Canada57 %
  • Mexico15 %
  • Peru8 %
  • Republic of Korea7 %
  • Other13 %
Scrap (circularity) · 2025 estimate
Value 488 million USDDomestic 88.11 %Imported 3.69 %Exported 8.2 %
Main uses
  • Protective coatings for iron and steel.

Money

The open price series where one exists, and one estimate with its formula. No licensed market data is shown.

Price

monthly, indicative

3 818$/mt, Oct 2026

+21.1% against a year earlier (Oct 2025: 3 152)

▲2▲3
Nov 201610-year range 1 903–4 360Oct 2026

Series as the World Bank defines it: Zinc (LME), high grade, minimum 99.95% purity, settlement price beginning April 1990; previously special high grade, minimum 99.995%, cash prices. The World Bank compiles it from: Bloomberg Finance L.P.; Engineering and Mining Journal; Platts Metals Week; Thomson Reuters Datastream; World Bank. Monthly averages in nominal US dollars, for orientation only. Not a quote.

Export controls on the time axis

  1. ▲12012 · Vietnam · Ban (Export ban) · before the charted years, not marked
  2. ▲22024 · Laos · Ban (Export ban)

USGS gives the year of each control only, so a mark sits at the start of that year. A mark shows when a control took effect; it does not say the control moved the price.

Public support instruments on the time axis (those whose source names the material)

  1. ▲32024-10-02 · Brazil · Fund

A mark sits at the month of the instrument's date. It shows when the instrument was announced, signed or took effect; it does not say the instrument moved the price.

Estimated production value

estimated

$37bnestimated value of world zinc mine production, 2025

How it is computed

Estimated value = world mine production of the year × the average of that year's monthly prices. Both inputs are reported figures; the product is an estimate made by the atlas.

World mine production, 2025 (estimated)
13 000 thousand metric tons
USGS MCS 2026, Mine production. The series is in thousand metric tons; the price is in US dollars per metric ton. One unit is 1 000 metric tons, so the total is 13 Mt.
Average price, 2025
2 868 $/mt
Mean of the 12 monthly averages of 2025.

13 Mt × 2 868 $/mt ≈ $37bn

Mined metal is not all sold at this price: concentrates sell at a discount and contracts differ. Read it as an order of magnitude.

Investment pipeline

announced figures

Planned and under-construction zinc projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

  • Polymetallic primary sulphide project (PMR, Las Cruces)PlannedMine and processing

    Cobre Las Cruces S.A.U. · Las Cruces, Andalusia · Spain · Copper, Zinc

    “está desarrollando actualmente los trabajos previos para la implementación del nuevo proyecto” · status as printed on 2026-11-16

    Announced capital cost

    EUR 800 M2026-11-16

    estimated investment of the project, printed as 'more than'; an additional investment in renewable self-supply of energy is not included · Cobre Las Cruces

    The publisher's words: “con una inversión estimada superior a los 800 millones de euros, a la que se sumará una inversión adicional para la implementación de instalaciones de autoabastecimiento energético mediante energías renovables”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 32)” · 2025-03-25

      European Commission

      The publisher's words: “Polymetallic primary sulphide project is an ongoing integrated extraction and processing project in Spain. The project promoted by Cobre las Cruces S.A.U.”
  • HilariónPlannedMine

    Nexa Resources Perú S.A.A. · Áncash · Peru · Zinc

    “PRE-FACTIBILIDAD; start of execution P.D. (por definir)” · status as printed on 2026-05

    Announced capital cost

    USD 585 M2026-05

    Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate) · Ministerio de Energía y Minas del Perú

    The publisher's words: “con Hilarión (US$ 585 millones) y Ayawilca (US$ 382 millones)”
    Public backing

    No public backing was read.

  • Hermosa project (Taylor zinc-lead-silver development, Clark manganese deposit)Under constructionMine and processing

    South32 · Arizona (the source prints "Santa Cruz, Arizona") · United States · Zinc, Manganese

    “advancing construction of the Taylor zinc-lead-silver project at Hermosa” · status as printed on 2026-08-27

    Announced capital cost

    USD 3.3 bn2026-04-30

    growth capital expenditure for the Taylor deposit from 1 January 2024 to first production (real as at 1 July 2026), as revised on 30 April 2026; the Clark manganese deposit is not in this figure · South32

    The publisher's words: “Growth capital expenditure revised to ~US$3,300M, with ~US$2,100M to be spent over Q4 FY26 to H2 FY28.”
    Public backing
    • USD 20 MGrant · “grant used to part fund construction of the exploration decline (Clark manganese deposit)” · 2026-04-30

      U.S. Department of War (Department of Defense)

      The publisher's words: “with a US$20M grant from the US Department of War used to part fund construction of the exploration decline”
    • USD 166 MGrant · “grant to support the potential development of a future commercial-scale manganese production facility” · 2026-04-30

      U.S. Department of Energy

      The publisher's words: “a US$166M grant from the US Department of Energy to support the potential development of a future commercial-scale manganese production facility”
    • no amount statedStrategic project status · “the first mining project added to the US Government’s FAST-41 process” · 2026-04-30

      U.S. Federal Permitting Improvement Steering Council (FAST-41)

      The publisher's words: “Hermosa was the first mining project added to the US Government’s FAST-41 process”

A short, hand-read list, not a census: 77 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names zinc, and general critical-minerals instruments (marked). Each is one statement by its publisher.

  1. 2024-10-02announced · BrazilFundannounced

    BNDES and Brazil's Ministry of Mines and Energy set up an equity investment fund for strategic minerals, for junior and mid-sized companies in exploration and new mines; managers were named in October 2024; it was still raising capital in 2026.

    BRL 250 M

    Covers: “Fundo de Investimento em Participações (FIP) em Minerais Estratégicos no Brasil; also names Metais do Grupo da Platina and Potássio” · Materials: Cobalt, Copper, Tin, Graphite, Lithium, Manganese, Molybdenum, Niobium, Nickel, Silicon, Tantalum, Rare earths, Titanium, Tungsten, Uranium, Vanadium, Zinc, Phosphate rock

    The publisher's words: “O BNDES vai aportar até R$ 250 milhões no FIP, com participação até 25% do total”
    2 further statements from the source

    target size of the fund

    The publisher's words: “O FIP é uma parceria lançada entre o BNDES e o MME para mobilizar mais de R$ 1 bilhão”

    standing in 2026

    The publisher's words: “O fundo está em fase de captação com aportes previstos ao longo do primeiro semestre de 2026 para início dos investimentos”
  2. 2024-11-25announced · AustraliaOther supportannounced

    The Treasurer announced the bill for a Critical Minerals Production Tax Incentive, a tax offset on the costs of processing and refining critical minerals in Australia for a limited number of years per project.

    Covers: “relevant processing and refining costs for Australia’s 31 critical minerals”

    critical minerals in general; the source does not name zinc

    The publisher's words: “It establishes a Critical Minerals Production Tax Incentive worth ten per cent of relevant processing and refining costs for Australia’s 31 critical minerals”
    2 further statements from the source

    a bill on that date, not yet law

    The publisher's words: “Today the Government will introduce the Future Made in Australia (Production Tax Credit and Other Measures) Bill 2024 to Parliament”

    period and length

    The publisher's words: “for critical minerals processed and refined between 2027–28 and 2039–40, for up to ten years per project”
  3. 2024-12-06published · AustraliaLoan programmein force

    Export Finance Australia manages the Australian Government's Critical Minerals Facility, which lends to and invests in critical minerals projects on the National Interest Account; the facility was later expanded.

    AUD 4 bn

    Covers: “Critical Minerals Facility (projects aligned with Australia's Critical Minerals Strategy)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “The support will be provided by Export Finance Australia (EFA) through the Government’s $4 billion Critical Minerals Facility (CMF).”
    2 further statements from the source

    expanded to $5 billion; loans and equity support (release of 12 January 2026)

    The publisher's words: “to be drawn from the expanded $5 billion Critical Minerals Facility, which provides government-backed loans and equity support for projects”

    who can access the facility (undated page of Export Finance Australia)

    The publisher's words: “Projects that are aligned with the Critical Minerals Strategy and are otherwise in Australia’s national interest, may be able to access finance through this facility, subject to our due diligence.”
  4. 2024-12-27in force from · United StatesOther supportin force

    Final Treasury regulations for the Section 45X advanced manufacturing production credit, a tax credit for producers of applicable critical minerals in the United States that is set as a share of their production costs.

    Covers: “applicable critical minerals (advanced manufacturing production credit, section 45X)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “For any applicable critical mineral, the credit amount is equal to 10 percent of the costs incurred by the taxpayer with respect to production of such mineral.”
    1 further statements from the source

    what the credit is for

    The publisher's words: “the advanced manufacturing production credit established by the Inflation Reduction Act of 2022 to incentivize the production of eligible components within the United States”
  5. 2025-01-29announced · IndiaFundin force

    India's Union Cabinet approved the launch of the National Critical Mineral Mission, which funds the critical minerals value chain, backs the purchase of mineral assets abroad and proposes a national stockpile of critical minerals.

    INR 163 bn

    Covers: “National Critical Mineral Mission (critical mineral resources vital to Green Technologies)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “has approved the launch of the National Critical Mineral Mission (NCMM) with an expenditure of Rs.16,300 crore and expected investment of Rs.18,000 crore by PSUs, etc.”
    1 further statements from the source

    assets abroad and a stockpile

    The publisher's words: “It also proposes development of stockpile of critical minerals within the country.”
  6. 2025-04-18announced · United StatesOther supportin force

    The Federal Permitting Improvement Steering Council began listing critical mineral production projects as FAST-41 transparency projects, which publishes their federal review and permitting schedules; this is a permitting status and carries no money.

    Covers: “critical mineral production projects (transparency projects on the Federal Permitting Dashboard)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “Inclusion on the Permitting Dashboard as a transparency project makes the environmental review and authorizations schedule for these vital mineral production projects publicly available”
    2 further statements from the source

    basis in the executive order on mineral production

    The publisher's words: “in response to President Trump’s Executive Order, Immediate Measures to Increase American Mineral Production”

    number of projects by November 20, 2025

    The publisher's words: “50 critical mineral and mining projects are now receiving the benefits of FAST-41 traditional and transparency coverage”
  7. 2025-06-17announced · G7Other supportannounced

    G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.

    Covers: “critical minerals”

    critical minerals in general; the source does not name zinc

    The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
    3 further statements from the source

    launch of the plan

    The publisher's words: “We are launching a G7 Critical Minerals Action Plan”

    roadmap content

    The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”

    capital mobilisation

    The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
  8. 2025-10-23announced · United States (with ADQ of Abu Dhabi as a matching investor)Fundannounced

    The U.S. development finance agency DFC committed an investment to the Orion Critical Mineral Consortium, an investment vehicle led by Orion Resource Partners and matched by Orion funds and the Abu Dhabi sovereign investor ADQ.

    USD 1.8 bn · “brings the current size of the consortium to $1.8 billion”

    Covers: “strategic critical minerals projects in DFC-eligible markets”

    critical minerals in general; the source does not name zinc

    The publisher's words: “brings the current size of the consortium to $1.8 billion”
    3 further statements from the source

    purpose of the consortium

    The publisher's words: “has created Orion Critical Mineral Consortium (Orion CMC) to invest in strategic critical minerals projects in DFC-eligible markets”

    who matched the commitment

    The publisher's words: “This commitment, which has been matched by both funds managed by Orion Resource Partners and ADQ, an active sovereign investor”

    DFC's own share, from its undated Public Information Summary for the board: a further $900 million on top of $600 million

    The publisher's words: “$900 million in addition to the $600 million already approved”
  9. 2025-11-04published · CanadaFundannounced

    Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.

    CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”

    Covers: “critical minerals projects and companies”

    critical minerals in general; the source does not name zinc

    The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
    3 further statements from the source

    tools of the fund

    The publisher's words: “including equity investments, loan guarantees, and offtake agreements”

    First and Last Mile Fund

    The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”

    absorbs the Critical Minerals Infrastructure Fund

    The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
  10. 2025-11-18announced · European UnionJoint purchasingin force

    The Commission opened registrations for the Raw Materials Mechanism, which links buyers and sellers of strategic raw materials and enables demand aggregation, joint purchasing and investment consortia.

    Covers: “buyers and sellers of strategic raw materials (Raw Materials Mechanism under the EU Energy and Raw Materials Platform)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “the European Commission opened registrations for the new Raw Materials Mechanism under the EU Energy and Raw Materials Platform”
    3 further statements from the source

    what the mechanism enables

    The publisher's words: “enable cooperation between companies, such as demand aggregation, joint purchasing, and investment consortia”

    first matchmaking round

    The publisher's words: “The first matchmaking round will launch in Q1 2026.”

    later result (press release of 9 October 2026)

    The publisher's words: “the Raw Materials Mechanism, established to aggregate demand and supply and identify potential offtakers, has generated more than 30 matches for 10 materials”
  11. 2025-11-22published · United KingdomFundannounced

    The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.

    GBP 50 M · “up to £50 million”

    Covers: “critical mineral projects in the UK”

    critical minerals in general; the source does not name zinc

    The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
    2 further statements from the source

    stockpiling under consideration

    The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”

    later programme page (published 22 June 2026): grant share

    The publisher's words: “with £45 million of this available as grant funding”
  12. 2025-11-24published · United KingdomLoan programmein force

    UK Export Finance opened the Critical Goods Export Development Guarantee, a partial state guarantee on commercial loans to UK-based suppliers of critical mineral products, alongside its existing Critical Minerals Supply Finance.

    Covers: “UK-based businesses that supply critical mineral products to UK exporters (minerals of the UK Criticality Assessment 2024 and growth minerals)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “The Critical Goods Export Development Guarantee (Critical Goods EDG) is now available for UK-based businesses that supply critical mineral products to UK exporters.”
    3 further statements from the source

    share guaranteed (the page's worked example)

    The publisher's words: “UKEF provides an 80% guarantee, reducing the lender’s risk and enabling them to provide the loan to the UK manufacturer”

    existing product for overseas suppliers

    The publisher's words: “UKEF’s existing Critical Minerals Supply Finance, which provides finance for overseas companies that have agreements in place to supply critical minerals products to UK exporters”

    minerals covered

    The publisher's words: “minerals listed in the UK Criticality Assessment 2024 as well as growth minerals such as beryllium, chromium, copper and uranium”
  13. 2026-01-14signed · United StatesPrice floorannounced

    Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.

    Covers: “processed critical minerals and their derivative products (PCMDPs)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
  14. 2026-02-02announced · United StatesStockpileannounced

    The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.

    USD 10 bn · “a Direct Loan of up to $10 billion”

    Covers: “essential raw materials”

    critical minerals in general; the source does not name zinc

    The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
    4 further statements from the source

    what it establishes

    The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”

    storage

    The publisher's words: “that will store essential raw materials in facilities across the United States”

    borrower structure

    The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”

    later EXIM release of May 4, 2026 restating the loan

    The publisher's words: “The transaction includes a direct loan of up to $10 billion”
  15. 2026-06-11published · ArgentinaOther supportin force

    Argentina's large-investment incentive regime (RIGI), created by law 27.742, grants approved single-project vehicles tax, customs and foreign-exchange incentives; the Economy Ministry published an official register of approved and pending projects, mining among the sectors.

    Covers: “Régimen de Incentivo para Grandes Inversiones (RIGI); sectores estratégicos como energía, petróleo y gas, minería, infraestructura y energías renovables”

    critical minerals in general; the source does not name zinc

    The publisher's words: “El Ministerio de Economía puso a disposición del público una nueva página web con la información oficial y actualizada sobre el Régimen de Incentivo para Grandes Inversiones (RIGI)”
    4 further statements from the source

    projects approved by resolution on that date (all sectors)

    The publisher's words: “16 proyectos US$ 29.892 millones de inversión”

    legal basis, as recited in a mining approval (Resolución 801/2026)

    The publisher's words: “Que por la ley 27.742 se creó el Régimen de Incentivo para Grandes Inversiones (RIGI)”

    tax and customs incentives applied to an approved mining project (Resolución 801/2026)

    The publisher's words: “aplicación de los incentivos tributarios y aduaneros establecidos por el capítulo IV del título VII de la ley 27.742”

    foreign-exchange incentives applied to an approved mining project (Resolución 801/2026)

    The publisher's words: “los incentivos cambiarios previstos en el capítulo V del título VII de la ley 27.742”
  16. 2026-07-15announced · GermanyFundannounced

    Germany's raw materials fund, through which KfW takes equity stakes in mining, processing and recycling companies on behalf of the federal government, is to be enlarged; the increase is subject to the budget procedure in parliament.

    EUR 1.5 bn · “auf insgesamt 1,5 Milliarden Euro”

    Covers: “Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen”

    critical minerals in general; the source does not name zinc

    The publisher's words: “Es ist beabsichtigt, die Mittel für Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen auf insgesamt 1,5 Milliarden Euro aufzustocken.”
    4 further statements from the source

    the increase is not yet legislated

    The publisher's words: “Die Aufstockung des Rohstofffonds ist Gegenstand des anstehenden parlamentarischen Haushaltsverfahrens.”

    the two investments made so far

    The publisher's words: “150 Millionen Euro Eigenkapital für die klimaneutrale Lithiumförderung von Vulcan Energy Resources sowie 50 Millionen Euro für ein Projekt zur Förderung von Seltenen Erden des Unternehmens Arafura Rare Earths”

    original mandate of the fund (undated KfW factsheet)

    The publisher's words: “beauftragt, bis zu 1 Mrd. EUR in das Eigenkapital von Bergbau-, Verarbeitungs- und Recyclingunternehmen zu investieren”

    who decides (KfW notice of 1 April 2026 on the second investment)

    The publisher's words: “Die Entscheidung, ob in ein Projekt investiert wird, trifft indes der Bund.”
  17. 2026-07-22announced · ItalyFundin force

    Italy's National Made in Italy Fund became operational with the appointment of its two managers; its companies arm takes equity stakes with particular attention to the whole value chain of critical raw materials.

    EUR 900 M · “dotazione complessiva di 900 milioni di euro”

    Covers: “filiere strategiche nazionali e sicurezza degli approvvigionamenti di materie prime critiche (dall’estrazione fino al riciclo e al riuso)”

    critical minerals in general; the source does not name zinc

    The publisher's words: “il Fondo dispone di una dotazione complessiva di 900 milioni di euro per rafforzare le filiere strategiche nazionali e garantire la sicurezza degli approvvigionamenti di materie prime critiche”
    3 further statements from the source

    the fund enters its operational phase

    The publisher's words: “il Fondo Nazionale del Made in Italy (FNMI) entra nella fase operativa”

    companies arm (equity)

    The publisher's words: “Il Fondo Imprese, con una dotazione di 600 milioni di euro, realizzerà invece investimenti diretti e indiretti, a condizioni di mercato, nel capitale delle imprese operanti nelle filiere strategiche.”

    critical raw materials value chain

    The publisher's words: “Particolare attenzione sarà riservata all’intera catena del valore delle materie prime critiche: dall’estrazione alla lavorazione e alla trasformazione, dall’approvvigionamento alla distribuzione, fino al riciclo e al riuso.”
  18. 2026-09-15published · European UnionStockpileannounced

    The Commission called for expressions of interest to select the entity that will design, set up and run a pilot stockpiling mechanism for critical raw materials.

    Covers: “pilot stockpiling mechanism for critical raw materials”

    critical minerals in general; the source does not name zinc

    The publisher's words: “The purpose of this call is to determine the entity that will be designated to carry out the stockpiling pilot project.”
    2 further statements from the source

    what the entity is to do

    The publisher's words: “supporting the design, set-up, procurement, storage, management, release and operational testing of a pilot stockpiling mechanism for critical raw materials”

    deadline

    The publisher's words: “Deadline for submitting applications 09/10/2026”

The instruments whose source names zinc are also marked on the price chart above, at the month of their date. A mark does not say the instrument moved the price.

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.

    Not computed: No open refining series by country

    • Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
  • Water

    Share of the material's mine sites on record that lie in high or extremely high baseline water stress.

    27%of mine sites on record

    2023Estimated

    Higher than 88% of the other 25 materials with rated mine sites.

    • 40 of 146 sites with a class (146 mine and brine sites on record).
    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per material: the area is mapped per country for all commodities together.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of EU demand (end-of-life recycling input rate).

    34%of EU demand

    2022Reported

    Higher than 94% of the other 18 elements in the atlas with a published EU rate.

    • Published for the EU as a whole. It cannot be compared with world shares.
    • End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed.
    • No EU target in these two laws names this material.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

The figures behind the indicators

Grid-carbon proxy for refining

estimated · proxy

Not computed: No open refining series by country

Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.

Water stress where the mines are

estimated · by site

27.4%of mine sites on record lie in high or extremely high water stress (40 of 146)

  • Low (<10%)78 sites
  • Low - Medium (10-20%)12 sites
  • Medium - High (20-40%)2 sites
  • High (40-80%)5 sites
  • Extremely High (>80%)35 sites
  • Arid and Low Water Use14 sites

Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.

Circularity

Recycling's share of EU demand (end-of-life recycling input rate)

Material2013201620192022
Zinc8%30.8%31%34%

End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed. The latest published figure is for 2022.

EU targets that apply

No EU target in these two laws names this material.

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

  • ▲ BanLaos2024

    Export ban: Raw minerals, including copper, gold, iron, nickel, potassium, silver, and zinc (2024).

    Source ↗
  • ▲ BanVietnam2012

    Export ban: Raw materials of iron, lead-zinc, chromite, manganese, apatite, and rare earths and deeply processed titanium (2012).

    Source ↗

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What if?

Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.

What the atlas does not know about zinc

How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.

Data coverage

Mines on record: 81.1% (10/10)

Plants on record: no open refining series by country

Owner or operator known: 78.3% (9/10)

Assurance known: no public assurance list is ingested yet

  • Mines:81% of world output lies in countries with a record (10 of 10 countries)(Mine production, 2025)

    Every country in the table has a record.

  • Processing plants: No open refining series by country
  • Owners and operators:78% of world output lies in countries with a record (9 of 10 countries)(Mine production, 2025)

    Producer countries without a record: Kazakhstan 2.8%

  • Assurance: No public assurance list is ingested yet

A country in these lists marks missing data, not missing industry.

Mining and refining: who leads

  • USGS MCS 2026, 2025 (estimated)

    • Mining:China 32% (about 1 in 3), 2025

    No open refining series by country

Price transparency

An open price series exists: Zinc, monthly average. It is on the Money tab.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

Source registry for this material

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Talk

Questions, doubts and pointers about this page. Anyone can write; a reviewer reads each comment before it appears. Comments are public: no personal data, please.

Nobody has written here yet.

What we don't know yet

No open source we may use gives these figures. Nothing is estimated to fill them. If you know a public source, add it.

Report an error or suggest something

How to cite OpenOre

Lorenzo Sivillica (2026). OpenOre: open data on raw-material supply chains, data release v1.1. OpenOre, https://openore.org. DOI pending (Zenodo).

The dataset's DOI is pending: the first release is being deposited on Zenodo. Data and downloads · Licence: ODbL 1.0

Type the name of a material, a country, a site or a company.