OpenOrebeta

Copper

Base metals

Compare

Embed this in a page

Paste this code into a web page to show the map of this material, without menus. It carries a line that names OpenOre and links back here, and it always shows the current data.

What to embed

Watch and Edit are coming soon.

Cite this profile

The sources listed are the ones this profile uses, with the years their figures describe. The access date is today.

China refined 48% (USGS) of the world's copper in 2025; Chile mined 23% (USGS).

48%

of the world's copper was refined in China in 2025 (estimated), according to USGS · about half

ANNUAL 2025

  • Leading mining country

    23%

    Chile, 2025 (estimated), USGS

  • Leading refining country

    48%

    China, 2025 (estimated), USGS

  • Sites on record

    628

    Mines and plants in the open sources. Coverage is partial. Also on record: 120 deposits and projects, which are not counted.

  • Recycling's share of EU demand

    55%

    2022, EU only

Overview

Copper ore is concentrated, smelted and refined into cathode. It is the main conductor in power grids, motors and electronics.

Follow the atom

Map

Basemap: Natural Earth (public domain)
  • Share of world mine output
  • Mine or brine operation
  • Processing site
  • Deposit or project (not a mine or a plant yet)

Sites are those in the open sources. A site missing here is missing from the sources, not from the world.

2025

Key facts

Group
Base metals
Stages in the atlas
Reserves · Mine · Process · Refine · Recycle
World mine production, 2025
23 000 thousand metric tons (estimated)
World refinery production, 2025
29 000 thousand metric tons (estimated)
Open price series
Yes: monthly, in $/mt

Open on the globe →Flow diagram →

Leading countries

Mine · USGS, 2025 (estimated)

  1. Chileabout 1 in 423%
  2. Congo (Kinshasa)about 1 in 1014%
  3. Peruabout 1 in 1012%
  4. Chinaabout 1 in 107.8%
  5. Russiaabout 1 in 205.6%

Refine · USGS, 2025 (estimated)

  1. Chinaabout half48%
  2. Congo (Kinshasa)about 1 in 109.7%
  3. Chileabout 1 in 205.9%
  4. Japanabout 1 in 204.8%
  5. Russiaabout 1 in 203.3%

The five largest shares of each stage's latest table. One source per stage; the Supply chain tab has every source and every row.

Supply chain

Every stage with its table by country, the flow between stages, the largest recorded trade flows and the sites on record.

Reserves

Concentration

ANNUAL 2025

Chile holds about 1 in 5 (18 %) of the world's copper reserves recorded here.

Reserves · 2025

(Data in thousand metric tons, copper content, unless otherwise specified)

Top 3 countries
37.2 %
Chile, Australia, Peru

Who holds what

Mine

Concentration

ANNUAL 2025

Chile mines about 1 in 4 (23 %) of the world's copper recorded here.

Mine production · 2025 (estimated)

(Data in thousand metric tons, copper content, unless otherwise specified)

Top 3 countries
48.7 %
Chile, Congo (Kinshasa), Peru

Who holds what

Process

No data yet: Copper, process stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Refine

Concentration

ANNUAL 2025

China refines about half (48 %) of the world's copper recorded here.

Refinery production · 2025 (estimated)

(Data in thousand metric tons, copper content, unless otherwise specified)

Top 3 countries
63.8 %
China, Congo (Kinshasa), Chile

Who holds what

Recycle

No data yet: Copper, recycle stage

We have no sourced record for this. We never fill gaps with estimates.

Help add it

Flow through the stages

Bars are each country's share of one stage, taken from one source. Bands are trade flows that customs data record between two countries. The two are measured differently, so a band's width says nothing about a bar's height. Where the data records nothing, the diagram says so.

Source for the country shares:One source at a time; figures from two sources are never mixed.

The diagram is wider than this screen. Swipe it sideways to see every stage.

MineMine production · 2025 (estimated)In trade flows only (no row in this table)ProcessNo open table by countryfor this stage in thissourceIn trade flows only (no row in this table)RefineRefinery production · 2025 (estimated)In trade flows only (no row in this table)After refiningNo record of whatimporters do with therefined productIn trade flows only (no row in this table)Chile → China: 20 934.6 million USD, 2024Peru → China: 15 443.4 million USD, 2024Congo (Kinshasa) → China: 13 683.7 million USD, 2024Chile → USA: 5 842.1 million USD, 2024Chile → Japan: 5 425 million USD, 2024Chile → China: 4 531.1 million USD, 2024Zambia → Switzerland: 3 765.7 million USD, 2024Mongolia → China: 3 325.5 million USD, 2024Mexico → China: 3 290.4 million USD, 2024Kazakhstan → China: 2 878 million USD, 2024Congo (Kinshasa) → China: 2 522.5 million USD, 2024Kazakhstan → China: 2 484.8 million USD, 2024Indonesia → China: 2 450.5 million USD, 2024Indonesia → Japan: 2 198.9 million USD, 2024Japan → China: 2 147 million USD, 2024Russia → China: 2 113.2 million USD, 2024Chile → Brazil: 2 098.2 million USD, 2024Japan → India: 1 903.6 million USD, 2024Zambia → China: 1 898.2 million USD, 2024Peru → Japan: 1 813.1 million USD, 2024China → Other Asia, nes: 1 752.5 million USD, 2024Zambia → India: 1 591.3 million USD, 2024Australia → Japan: 1 590.5 million USD, 2024United States → Mexico: 1 487.6 million USD, 2024Russia → China: 1 469.3 million USD, 2024Chile → Rep. of Korea: 1 379.1 million USD, 2024Canada → China: 1 374.5 million USD, 2024Chile → India: 1 373.2 million USD, 2024Australia → China: 1 364.7 million USD, 2024Serbia → China: 1 334.2 million USD, 2024United States → Mexico: 1 315.2 million USD, 2024Canada → USA: 1 273.5 million USD, 2024Japan → Other Asia, nes: 1 239.3 million USD, 20242 more countries → Germany: 1 194.5 million USD, 2024Kazakhstan → 2 more countries: 1 155.7 million USD, 20242 more countries → China: 1 123 million USD, 2024Indonesia → India: 1 107.7 million USD, 2024Chile → 2 more countries: 1 074.9 million USD, 2024United States → China: 1 067.3 million USD, 2024Indonesia → Rep. of Korea: 1 064.6 million USD, 2024Chile 23.0 %Congo (Kinshasa) 13.9 %Peru 11.7 %China 7.8 %Russia 5.6 %United States 4.3 %Zambia 4.1 %Australia 3.2 %Indonesia 3.1 %Kazakhstan 3.1 %Mexico 3.0 %Canada 2.2 %Poland 1.8 %India 0.1 %Other / not attributed 13.0 %MongoliaSerbiaChinaJapanZambiaIndiaRep. of KoreaMexico2 more countriesChina 48.3 %Congo (Kinshasa) 9.7 %Chile 5.9 %Japan 4.8 %Russia 3.3 %United States 2.9 %India 2.1 %Germany 2.1 %Korea, Republic of 2.1 %Poland 1.9 %Kazakhstan 1.7 %Mexico 1.7 %Australia 1.6 %Indonesia 1.4 %Peru 1.2 %Canada 1.1 %Zambia 0.9 %Other / not attributed 7.3 %SwitzerlandChinaUSAOther Asia, nesBrazilIndiaMexico2 more countriesRecycling back into supply: copper 55.0 % (2022), EU only
  • Bar: a country's share of the stage's output. Height is the share. Sources:Mine 2025Refine 2025
  • Band: recorded trade, by value, 2024. In US dollars, not tonnes. Width compares flows of the same product only. A band runs from the exporter to the importer's place in the next stage; the data does not say what the importer did with the product. The data holds only the largest flows of the material: 40 of 3 225 flows, covering 59.5 % of traded value.
  • Dashed box: a country that appears in a recorded trade flow but has no row in this stage's table. It has no share.
  • Not recorded: material processed in the country that mined it. Trade data only sees border crossings. A dotted line joins a country that appears in two neighbouring tables.
  • Return arrow: recycling's share of EU demand (end-of-life recycling input rate). EU only, so it cannot be compared with the world shares above. Width: 1 px at 0 % to 10 px at 100 %.
Table of what is drawn (50 country marks, 40 trade flows)
Country shares per stage, from USGS MCS 2026.
StageCountryShareAmountSource
Mine 2025Chile23.0 %5 300 kt
Mine 2025Congo (Kinshasa)13.9 %3 200 kt
Mine 2025Peru11.7 %2 700 kt
Mine 2025China7.8 %1 800 kt
Mine 2025Russia5.6 %1 300 kt
Mine 2025United States4.3 %1 000 kt
Mine 2025Zambia4.1 %940 kt
Mine 2025Australia3.2 %730 kt
Mine 2025Indonesia3.1 %710 kt
Mine 2025Kazakhstan3.1 %710 kt
Mine 2025Mexico3.0 %690 kt
Mine 2025Canada2.2 %500 kt
Mine 2025Poland1.8 %410 kt
Mine 2025India0.1 %23 kt
Mine 2025Other / not attributed13.0 %3 000 ktthe source's own "other" row
Refine 2025China48.3 %14 000 kt
Refine 2025Congo (Kinshasa)9.7 %2 800 kt
Refine 2025Chile5.9 %1 700 kt
Refine 2025Japan4.8 %1 400 kt
Refine 2025Russia3.3 %950 kt
Refine 2025United States2.9 %850 kt
Refine 2025India2.1 %620 kt
Refine 2025Germany2.1 %610 kt
Refine 2025Korea, Republic of2.1 %610 kt
Refine 2025Poland1.9 %560 kt
Refine 2025Kazakhstan1.7 %500 kt
Refine 2025Mexico1.7 %480 kt
Refine 2025Australia1.6 %460 kt
Refine 2025Indonesia1.4 %400 kt
Refine 2025Peru1.2 %340 kt
Refine 2025Canada1.1 %320 kt
Refine 2025Zambia0.9 %270 kt
Refine 2025Other / not attributed7.3 %2 100 ktthe source's own "other" row
Recorded trade flows drawn as bands, by value, 2024. ≈ marks a customs code that mixes grades or forms.
Product of stageFrom → toMillion USDSource
MineChile → China20 934.6
MinePeru → China15 443.4
RefineDem. Rep. of the Congo → China13 683.7
RefineChile → USA5 842.1
MineChile → Japan5 425
RefineChile → China4 531.1
ProcessZambia → Switzerland3 765.7
MineMongolia → China3 325.5
MineMexico → China3 290.4
MineKazakhstan → China2 878
MineDem. Rep. of the Congo → China2 522.5
RefineKazakhstan → China2 484.8
MineIndonesia → China2 450.5
MineIndonesia → Japan2 198.9
RefineJapan → China2 147
RefineRussian Federation → China2 113.2
RefineChile → Brazil2 098.2
RefineJapan → India1 903.6
ProcessZambia → China1 898.2
MinePeru → Japan1 813.1
RefineChina → Other Asia, nes1 752.5
ProcessZambia → India1 591.3
MineAustralia → Japan1 590.5
MineUSA → Mexico1 487.6
MineRussian Federation → China1 469.3
MineChile → Rep. of Korea1 379.1
MineCanada → China1 374.5
MineChile → India1 373.2
RefineAustralia → China1 364.7
MineSerbia → China1 334.2
RefineUSA → Mexico1 315.2
RefineCanada → USA1 273.5
RefineJapan → Other Asia, nes1 239.3
ProcessBulgaria → Fed. Rep. of Germany (...1990)1 194.5
RefineKazakhstan → Türkiye1 155.7
ProcessDem. Rep. of the Congo → China1 123
MineIndonesia → India1 107.7
RefineChile → Rep. of Korea1 074.9
MineUSA → China1 067.3
MineIndonesia → Rep. of Korea1 064.6

Countries drawn as dashed boxes (in trade flows only)

  • Mine: Mongolia; Serbia
  • Process: China; Japan; Zambia; India; Rep. of Korea; Mexico; 2 more countries (Bulgaria, Dem. Rep. of the Congo)
  • Refine: Switzerland
  • After refining: China; USA; Other Asia, nes; Brazil; India; Mexico; 2 more countries (Türkiye, Rep. of Korea)

Recycling loop

  • Copper: 55.0 % (2022, European Union)

Largest trade flows · 2024

Reconciled customs data (CEPII BACI), by value. Trade data lags: this is the latest complete year. 40 of 3 225 flows shown, covering 59.5 % of traded value.

Largest trade flows 2024
From → toProduct of stageMillion USDSource
Chile → ChinaMine20 934.6
Peru → ChinaMine15 443.4
Dem. Rep. of the Congo → ChinaRefine13 683.7
Chile → USARefine5 842.1
Chile → JapanMine5 425
Chile → ChinaRefine4 531.1
Zambia → SwitzerlandProcess3 765.7
Mongolia → ChinaMine3 325.5
Mexico → ChinaMine3 290.4
Kazakhstan → ChinaMine2 878

≈ marks a customs code that mixes grades or forms of the material, so stages cannot be told apart. Expert mode shows the codes.

Sites on record · 628 and 120 deposits and projects

748 of 748 shown

One entry per site. Where two sources describe the same site, the atlas lists the record of the source it ranks higher.

United States view: Copper

These figures describe the United States only. They are not global figures.

Net import reliance · 2025
57 %
Import sources · 2021-24
  • Chile68 %
  • Canada16 %
  • Peru7 %
  • Mexico6 %
  • Other3 %
Scrap (circularity) · 2025 estimate
Value 7 890 million USDDomestic 21.55 %Imported 10.01 %Exported 68.44 %
Main uses
  • Wiring and cables.

Money

The open price series where one exists, and one estimate with its formula. No licensed market data is shown.

Price

monthly, indicative

14 508$/mt, Oct 2026

+35.1% against a year earlier (Oct 2025: 10 740)

▲1▲2▲3▲4▲5▲6▲7▲8▲9▲10▲11
Nov 201610-year range 5 058–14 508Oct 2026

Series as the World Bank defines it: Copper (LME), grade A, minimum 99.9935% purity, cathodes and wire bar shapes, settlement price. The World Bank compiles it from: Bloomberg Finance L.P.; Engineering and Mining Journal; Platts Metals Week; Thomson Reuters Datastream; World Bank. Monthly averages in nominal US dollars, for orientation only. Not a quote.

Export controls on the time axis

  1. ▲12017 · Tanzania · Ban (Export ban)
  2. ▲22023 · Indonesia · Ban (Export ban)
  3. ▲32024 · Laos · Ban (Export ban)
  4. ▲42024 · Venezuela · Ban (Export ban)
  5. ▲52025 · Morocco · Licence (Export licensing requirement)

USGS gives the year of each control only, so a mark sits at the start of that year. A mark shows when a control took effect; it does not say the control moved the price.

Public support instruments on the time axis (those whose source names the material)

  1. ▲62023-01-11 · Saudi Arabia · Equity
  2. ▲72024-05-23 · European Union · Joint purchasing
  3. ▲82024-10-02 · Brazil · Fund
  4. ▲92025-03-20 · United States · Loan programme
  5. ▲102025-06-04 · European Union · Other support
  6. ▲112025-08-13 · United States · Fund

A mark sits at the month of the instrument's date. It shows when the instrument was announced, signed or took effect; it does not say the instrument moved the price.

Estimated production value

estimated

$229bnestimated value of world copper mine production, 2025

How it is computed

Estimated value = world mine production of the year × the average of that year's monthly prices. Both inputs are reported figures; the product is an estimate made by the atlas.

World mine production, 2025 (estimated)
23 000 thousand metric tons
USGS MCS 2026, Mine production. The series is in thousand metric tons; the price is in US dollars per metric ton. One unit is 1 000 metric tons, so the total is 23 Mt.
Average price, 2025
9 947 $/mt
Mean of the 12 monthly averages of 2025.

23 Mt × 9 947 $/mt ≈ $229bn

Mined metal is not all sold at this price: concentrates sell at a discount and contracts differ. Read it as an order of magnitude.

Investment pipeline

announced figures

Planned and under-construction copper projects with a publicly announced capital cost, public financial backing, or both. Each line is one statement by the named publisher on the given date; the atlas adds nothing to it.

  • Los AzulesPlannedMine and processing

    Andes Corporación Minera SA (ACM SA) · Calingasta department, San Juan province · Argentina · Copper

    “completar el desarrollo (factibilidad, permisos) y la construcción de mina, planta e infraestructura asociada” · status as printed on 2025-10-14

    Announced capital cost

    USD 2.67 bn2025-10-14

    total investment declared by the applicant in its RIGI investment plan (of which USD 2.353.624.141,07 in computable assets) · Boletín Oficial de la República Argentina (Ministerio de Economía)

    The publisher's words: “inversión total de dos mil seiscientos setenta y dos millones ciento setenta y un mil doscientos siete dólares estadounidenses (USD 2.672.171.207)”
    Public backing
    • no amount statedOther support · “Apruébase la solicitud de adhesión; adhesion date 25 September 2025” · 2025-10-14

      Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)

      The publisher's words: “ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)”
  • PSJ Cobre MendocinoPlannedMine and processing

    Minera San Jorge SA · Uspallata, Las Heras department, Mendoza province · Argentina · Copper

    “estimando el inicio de la etapa de construcción para el mes de junio del año 2027” · status as printed on 2026-05-28

    Announced capital cost

    USD 613.43 M2026-05-28

    total investment in computable assets declared by the applicant in its RIGI investment plan · Boletín Oficial de la República Argentina (Ministerio de Economía)

    The publisher's words: “inversión total en activos computables de seiscientos trece millones cuatrocientos treinta mil doscientos treinta y cuatro dólares estadounidenses (USD 613.430.234)”
    Public backing
    • no amount statedOther support · “Apruébase la solicitud de adhesión; adhesion date 13 May 2026” · 2026-05-28

      Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)

      The publisher's words: “ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)”
  • Vicuña (Josemaría and Filo del Sol)PlannedMine and processing

    Vicuña Argentina SA · San Juan province · Argentina · Copper

    “inversión total … a ejecutarse en dos (2) etapas; Etapa 1 until 31 December 2026, Etapa 2 from 1 January 2027 to 31 December 2031” · status as printed on 2026-07-30

    Announced capital cost

    USD 9.74 bn2026-07-30

    total investment declared by the applicant in its RIGI investment plan (of which USD 9.024.732.281 in computable assets), in two stages · Boletín Oficial de la República Argentina (Ministerio de Economía)

    The publisher's words: “inversión total de nueve mil setecientos treinta y siete millones catorce mil dólares estadounidenses (USD 9.737.014.000)”
    Public backing
    • no amount statedOther support · “Apruébase la solicitud de adhesión … como Proyecto de Exportación Estratégica de Largo Plazo; adhesion date 3 June 2026” · 2026-07-30

      Ministerio de Economía de la República Argentina (Régimen de Incentivo para Grandes Inversiones, RIGI)

      The publisher's words: “ARTÍCULO 1°.- Apruébase la solicitud de adhesión al Régimen de Incentivo para Grandes Inversiones (RIGI)”
  • Highland Valley Copper Mine Life ExtensionUnder constructionMine

    Teck Resources Limited · British Columbia · Canada · Copper

    “board approval for construction; construction is set to commence in full in August 2025” · status as printed on 2025-07-23

    Announced capital cost

    CAD 2.4 bn2025-07-23

    project capital estimate at sanction, printed as a range of $2.1 to $2.4 billion (the amount here is the upper end), to be invested from H2 2025 through 2028 · Teck Resources Limited

    The publisher's words: “the project capital estimate has been refined and is now expected to be between $2.1 to $2.4 billion”
    Public backing

    No public backing was read.

  • Marathon ProjectPlannedMine

    Generation Mining Limited · Marathon, Northwestern Ontario · Canada · Copper, Palladium

    “progresses the Project toward a final investment decision and construction” · status as printed on 2026-09-14

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • CAD 140 MEquity · “commitment to invest (common shares and a convertible note)” · 2026-09-14

      Canada Growth Fund

      The publisher's words: “announced today its commitment to invest ~ $140 million in Generation Mining Limited”
  • Yellowhead Copper ProjectPlannedMine

    Trekor Metals Limited (formerly Taseko Mines) · Thompson-Nicola region, British Columbia · Canada · Copper

    “a proposed open-pit copper mine; Detailed Project Description submitted to the BC Environmental Assessment Office” · status as printed on 2026-07-07

    Announced capital cost

    CAD 2 bn2026-10

    initial capital cost on a presentation slide that cites the Technical Report Update dated July 10th, 2025 (effective date June 15, 2025) · Trekor Metals Limited

    The publisher's words: “Initial capital cost C$2.0 billion”
    Public backing

    No public backing was read.

  • Centinela Second Concentrator ProjectUnder constructionProcessing

    Antofagasta plc · Centinela District, Chile · Chile · Copper

    “pre-commissioning activities continued during H1 2026 alongside key construction milestones; table: Underway, 2027: Complete construction and commissioning” · status as printed on 2026-08-13

    Announced capital cost

    USD 4.4 bn2026-08-13

    capital cost estimate as announced in December 2023; the source says it was subsequently reduced by $380 million after the outsourcing of Centinela's water infrastructure, and prints $3.3bn of capex to date at 30 June 2026 · Antofagasta plc

    The publisher's words: “Figure quoted here ($4.4 billion) is the figure provided on announcement in December 2023, which was subsequently reduced by $380 million”
    Public backing

    No public backing was read.

  • Continuidad Operacional Minera El AbraPlannedMine and processing

    SCM El Abra (Freeport) · Chile (the source does not print the region) · Chile · Copper

    “ingresó su EIA en marzo de 2026 (environmental impact study filed, under assessment)” · status as printed on 2026-08

    Announced capital cost

    USD 7.5 bn2026-08

    investment declared by the holder on filing the environmental impact study (EIA) with Chile's environmental assessment system · Comisión Chilena del Cobre (Cochilco)

    The publisher's words: “El Abra: ingresó su EIA en marzo de 2026 por US$7.500 MM declarados”
    Public backing

    No public backing was read.

  • Nueva Planta Concentradora (Escondida)PlannedProcessing

    Minera Escondida (BHP) · Chile (the source does not print the region) · Chile · Copper

    “BHP proyecta su decisión de inversión hacia 2027-2028” · status as printed on 2026-08

    Announced capital cost

    USD 5.15 bn2026-08

    investment declared on filing the environmental declaration (DIA) for the new concentrator and electrical works · Comisión Chilena del Cobre (Cochilco)

    The publisher's words: “Escondida: ingresó a evaluación la DIA de su nueva concentradora y obras eléctricas por US$5.150 MM”
    Public backing

    No public backing was read.

  • TovakuPlannedMine and processing

    Pucobre (60%) and Codelco (40%) · northern Chile (the source's map shows Tocopilla) · Chile · Copper

    “Pucobre is requesting the early incorporation of the project company to enable the execution of US$20 million in early works” · status as printed on 2026-09

    Announced capital cost

    USD 870 M2026-09

    CAPEX of the Tovaku project as printed on Codelco's partnership slide · Codelco

    The publisher's words: “CAPEX US$ 870m PUCOBRE 60% CODELCO 40% TOVAKU”
    Public backing

    No public backing was read.

  • Polymetallic primary sulphide project (PMR, Las Cruces)PlannedMine and processing

    Cobre Las Cruces S.A.U. · Las Cruces, Andalusia · Spain · Copper, Zinc

    “está desarrollando actualmente los trabajos previos para la implementación del nuevo proyecto” · status as printed on 2026-11-16

    Announced capital cost

    EUR 800 M2026-11-16

    estimated investment of the project, printed as 'more than'; an additional investment in renewable self-supply of energy is not included · Cobre Las Cruces

    The publisher's words: “con una inversión estimada superior a los 800 millones de euros, a la que se sumará una inversión adicional para la implementación de instalaciones de autoabastecimiento energético mediante energías renovables”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 32)” · 2025-03-25

      European Commission

      The publisher's words: “Polymetallic primary sulphide project is an ongoing integrated extraction and processing project in Spain. The project promoted by Cobre las Cruces S.A.U.”
  • SakattiPlannedMine and processing

    Anglo American · Finland · Copper, Nickel, Cobalt, Platinum, Palladium

    “Once it enters production in the early 2030s” · status as printed on 2026-11-16

    Announced capital cost

    No announced capital cost was read.

    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2025) 1904, annex item 42)” · 2025-03-25

      European Commission

      The publisher's words: “Sakatti is an ongoing integrated extraction and processing project in Finland. The project promoted by Anglo American Services (UK) Ltd.”
  • NussirUnder constructionMine and processing

    Blue Moon Metals Inc. (Nussir ASA) · northern Norway · Norway · Copper

    “board of directors has approved a final investment decision on the construction” · status as printed on 2026-04-27

    Announced capital cost

    USD 184 M2026-04-16

    initial capital expenditures of the April 2026 feasibility study; the study table prints the row 'Initial Capital Costs' in US$m · Blue Moon Metals Inc.

    The publisher's words: “Initial capital expenditures of $184 million.”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project in a third country (Commission Decision C(2025) 3491, annex item 8)” · 2025-06-04

      European Commission

      The publisher's words: “Nussir is an ongoing extraction project in Norway. The project promoted by Nussir ASA aims to contribute to the supply of copper.”
  • Integración CoroccohuaycoPlannedMine

    Compañía Minera Antapaccay S.A. · Cusco · Peru · Copper

    “FACTIBILIDAD; execution listed for 2027 / 2028” · status as printed on 2026-05

    Announced capital cost

    USD 1.8 bn2026-05

    Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate) · Ministerio de Energía y Minas del Perú

    The publisher's words: “destacan Integración Coroccohuayco (US$ 1,800 millones), en Cusco”
    Public backing

    No public backing was read.

  • MichiquillayPlannedMine

    Southern Perú Copper Corporation · Cajamarca · Peru · Copper

    “etapa Conceptual” · status as printed on 2026-05

    Announced capital cost

    USD 2.5 bn2026-05

    Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate) · Ministerio de Energía y Minas del Perú

    The publisher's words: “Chancas (US$ 2,600 millones), Michiquillay (US$ 2,500 millones)”
    Public backing

    No public backing was read.

  • Tía MaríaUnder constructionMine and processing

    Southern Perú Copper Corporation · Islay province, Arequipa · Peru · Copper

    “comenzó la etapa de ejecución del proyecto Tía María” · status as printed on 2026-05

    Announced capital cost

    USD 1.8 bn2026-05

    Inversión CAPEX of the project as listed in the ministry's 2026 mining investment portfolio (estimate) · Ministerio de Energía y Minas del Perú

    The publisher's words: “Tía María (US$ 1,805 millones) y Pampa de Pongo (US$ 1,781 millones)”
    Public backing

    No public backing was read.

  • Development and extraction of the Retków-Grodziszcze depositUnder constructionMine

    KGHM Polska Miedź S.A. · Retków–Grodziszcze deposit · Poland · Copper

    “one of three mine shafts whose construction began in 2025” · status as printed on 2026-10-09

    Announced capital cost

    PLN 9.5 bn2026-10-09

    TWO projects together, printed as 'over PLN 9.5 billion': this deposit and the transformation of the Legnica Copper Smelter and Refinery into a recycling plant; no figure for the deposit alone is printed · KGHM Polska Miedź S.A.

    The publisher's words: “These two projects, totalling over PLN 9.5 billion, will strengthen Europe’s copper mining and recycling capacity”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2026) 8051, annex item 12)” · 2026-10-09

      European Commission

      The publisher's words: “is an ongoing extraction project in Poland. The project promoted by KGHM Polska Miedź S.A. aims to contribute to the supply of copper.”
  • Viscaria Copper ProjectUnder constructionMine and processing

    Gruvaktiebolaget Viscaria · Kiruna · Sweden · Copper

    “groundworks that commenced during the summer and the construction activities that began in the autumn” · status as printed on 2026-05-07

    Announced capital cost

    SEK 10 bn2026-05-07

    total project scope as estimated at the Capital Markets Day of 7 May 2026 (up from about SEK 9 billion); the report does not break the figure down · Gruvaktiebolaget Viscaria

    The publisher's words: “the total project scope is now estimated at approximately SEK 10 billion, up from the previous estimate of approximately SEK 9 billion”
    Public backing
    • no amount statedStrategic project status · “recognised as Strategic Project (Commission Decision C(2026) 8051, annex item 45)” · 2026-10-09

      European Commission

      The publisher's words: “The project promoted by Gruvaktiebolaget Viscaria aims to contribute to the supply of copper.”
  • Kabanga Nickel ProjectPlannedMine

    Lifezone Metals Limited · northwestern Tanzania · Tanzania · Nickel, Copper, Cobalt

    “on track for a Final Investment Decision (FID) in 2026” · status as printed on 2025-12-11

    Announced capital cost

    USD 942 M2025-07-18

    Pre-production capital costs, including 9.7% contingency (Feasibility Study, initial development phase) · Lifezone Metals Limited

    The publisher's words: “Pre-production capital costs of $942 million, including 9.7% contingency.”
    Public backing
    • no amount statedLetter of interest · “Letter of Interest” · 2024-09-23

      U.S. International Development Finance Corporation (DFC)

      The publisher's words: “has received a Letter of Interest from the U.S. International Development Finance Corporation (DFC) that expressed DFC’s interest in considering the Project for loans”
  • Arctic ProjectPlannedMine

    Ambler Metals LLC · northwestern Alaska · United States · Copper

    “targeting a Record of Decision in September 2028” · status as printed on 2026-10-02

    Announced capital cost

    USD 1.18 bn2023-02-14

    Initial capital expenditure (2023 Arctic feasibility study); sustaining capital and closure are separate figures · Trilogy Metals Inc.

    The publisher's words: “Initial capital expenditure is $1,176.8 million and sustaining capital is $114.4 million”
    Public backing
    • USD 35.6 MEquity · “Closing” · 2026-10-02

      U.S. Department of War

      The publisher's words: “Closing of the DOW $35.6 million strategic equity investment subsequent to quarter end on September 11, 2026.”
  • Santa Cruz Copper ProjectPlannedMine and processing

    Ivanhoe Electric Inc. · Casa Grande, Arizona · United States · Copper

    “Box cut development expected to commence in October 2026” · status as printed on 2026-09-23

    Announced capital cost

    USD 1.43 bn2026-09-23

    initial project capital in the 2026 Preliminary Feasibility Study (the source says it is higher than in the 2025 study because of cost escalation and design changes) · Ivanhoe Electric Inc.

    The publisher's words: “Initial project capital of $1.43 billion results in capital intensity of $19,100/tonne of copper produced”
    Public backing
    • USD 1.1 bnLetter of interest · “Preliminary Project Letter; does not constitute a financing commitment” · 2026-08-24

      Export-Import Bank of the United States (EXIM)

      The publisher's words: “Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project”
    • no amount statedLetter of interest · “any financing remains subject to completion of EXIM Bank’s review and approval process” · 2026-08-24

      Export-Import Bank of the United States (EXIM)

      The publisher's words: “The PPL does not constitute a financing commitment, and any financing remains subject to completion of EXIM Bank’s review and approval process.”
  • U.S. SmelterPlannedProcessing

    Korea Zinc · Clarksville, Tennessee · United States · Copper, Antimony, Gallium, Germanium

    “Full-scale construction will start in 2027” · status as printed on 2025-12-15

    Announced capital cost

    USD 6.6 bn2025-12-15

    capital expenditures; total planned investment of $7.4 billion including working capital and financing costs · Korea Zinc

    The publisher's words: “is expected to have $6.6 billion in capital expenditures, with a total planned investment of $7.4 billion including working capital and financing costs”
    Public backing
    • USD 1.4 bnOther support · “conditional investment” · 2025-12-15

      U.S. Department of War

      The publisher's words: “The Department of War’s conditional investment of $1.4 billion to build the first U.S.-based zinc smelter and critical minerals processing facility”
    • USD 2.15 bnOther support · “arranged by the U.S. Department of War together with investors” · 2025-12-15

      U.S. Department of War together with investors

      The publisher's words: “Approximately $2.15 billion, arranged by the U.S. Department of War together with investors, will be invested in the smelter construction.”
    • USD 210 MGrant · “will provide $210 million in award funding” · 2025-12-15

      U.S. Department of Commerce (CHIPS Act)

      The publisher's words: “The U.S. Department of Commerce will provide $210 million in award funding under the CHIPS Act for U.S. equipment procurement and other purposes.”
  • Lumwana Super Pit Expansion ProjectUnder constructionMine and processing

    Barrick Mining Corporation · Lumwana mine, Zambia · Zambia · Copper

    “The mill expansion is progressing well; on budget and on schedule for first copper at the end of Q1 2028” · status as printed on 2026-11-09

    Announced capital cost

    USD 2 bn2025-07-10

    the Super Pit Expansion Project as a whole, as the company describes it ("$2 billion Super Pit Expansion Project"); no breakdown on the page · Barrick Mining Corporation

    The publisher's words: “Construction of the $2 billion Super Pit Expansion Project at Barrick Mining Corporation’s (NYSE:B)(TSX:ABX) Lumwana mine is well underway”
    Public backing

    No public backing was read.

  • Mingomba copper mineUnder constructionMine

    KoBold Metals (with ZCCM-IH) · Chililabombwe, Zambia · Zambia · Copper

    “officially broke ground on the planned shaft construction; the formal start of construction” · status as printed on 2026-05-21

    Announced capital cost

    USD 2 bn2026-05-21

    the investment as a whole, printed as an estimate of 'more than $2 billion' (a lower bound, not a study figure) · KoBold Metals

    The publisher's words: “The investment is estimated at more than $2 billion, with targeted production of around 300,000 metric tonnes of copper annually and first output expected in the early 2030s.”
    Public backing

    No public backing was read.

A short, hand-read list, not a census: 77 projects in all. Announced amounts are not spending, a letter of interest or a conditional commitment is not a loan, and amounts stay in the currency of the announcement.

Public support instruments

Stockpiles, price floors, offtake and purchasing programmes and public funds whose source names copper, and general critical-minerals instruments (marked). Each is one statement by its publisher.

  1. 2023-01-11announced · Saudi ArabiaEquityannounced

    The Public Investment Fund and the state-controlled miner Ma'aden agreed to set up a joint company, later named Manara Minerals, to take minority stakes in mining assets abroad and secure physical offtake for Saudi industry.

    USD 50 M · “The company’s capital will amount to USD 50 million”

    Covers: “invest in mining assets globally; initially iron ore, copper, nickel, and lithium, as a non-operating partner taking minority equity positions” · Materials: Iron ore, Copper, Nickel, Lithium

    The publisher's words: “The company’s capital will amount to USD 50 million.”
    3 further statements from the source

    ownership

    The publisher's words: “Ma’aden will own 51% and PIF will own 49% of the company”

    minerals and manner of investing

    The publisher's words: “The company aims to initially invest in iron ore, copper, nickel, and lithium as a non-operating partner taking minority equity positions.”

    purpose

    The publisher's words: “This will provide physical offtake of critical minerals to ensure supply security for domestic mineral downstream sectors”
  2. 2024-05-23in force from · European UnionJoint purchasingin force

    The Critical Raw Materials Act obliges the Commission to run a demand-aggregation and joint-purchasing system for strategic raw materials and to set a benchmark for strategic stocks.

    Covers: “strategic raw materials” · Materials: Cobalt, Copper, Gallium, Germanium, Lithium, Graphite, Nickel, Rare earths, Tungsten

    The publisher's words: “The Commission shall set up and operate a system to aggregate the demand of interested undertakings consuming strategic raw materials established in the Union”
    2 further statements from the source

    joint negotiation of purchases allowed (Article 25(5))

    The publisher's words: “may, on a transparent basis, jointly negotiate the purchase, including the prices or other terms and conditions of the purchasing agreement”

    coordination of strategic stocks (Article 23)

    The publisher's words: “shall adopt a benchmark indicating a safe level of Union strategic stocks of strategic raw materials”
  3. 2024-10-02announced · BrazilFundannounced

    BNDES and Brazil's Ministry of Mines and Energy set up an equity investment fund for strategic minerals, for junior and mid-sized companies in exploration and new mines; managers were named in October 2024; it was still raising capital in 2026.

    BRL 250 M

    Covers: “Fundo de Investimento em Participações (FIP) em Minerais Estratégicos no Brasil; also names Metais do Grupo da Platina and Potássio” · Materials: Cobalt, Copper, Tin, Graphite, Lithium, Manganese, Molybdenum, Niobium, Nickel, Silicon, Tantalum, Rare earths, Titanium, Tungsten, Uranium, Vanadium, Zinc, Phosphate rock

    The publisher's words: “O BNDES vai aportar até R$ 250 milhões no FIP, com participação até 25% do total”
    2 further statements from the source

    target size of the fund

    The publisher's words: “O FIP é uma parceria lançada entre o BNDES e o MME para mobilizar mais de R$ 1 bilhão”

    standing in 2026

    The publisher's words: “O fundo está em fase de captação com aportes previstos ao longo do primeiro semestre de 2026 para início dos investimentos”
  4. 2024-11-25announced · AustraliaOther supportannounced

    The Treasurer announced the bill for a Critical Minerals Production Tax Incentive, a tax offset on the costs of processing and refining critical minerals in Australia for a limited number of years per project.

    Covers: “relevant processing and refining costs for Australia’s 31 critical minerals”

    critical minerals in general; the source does not name copper

    The publisher's words: “It establishes a Critical Minerals Production Tax Incentive worth ten per cent of relevant processing and refining costs for Australia’s 31 critical minerals”
    2 further statements from the source

    a bill on that date, not yet law

    The publisher's words: “Today the Government will introduce the Future Made in Australia (Production Tax Credit and Other Measures) Bill 2024 to Parliament”

    period and length

    The publisher's words: “for critical minerals processed and refined between 2027–28 and 2039–40, for up to ten years per project”
  5. 2024-12-06published · AustraliaLoan programmein force

    Export Finance Australia manages the Australian Government's Critical Minerals Facility, which lends to and invests in critical minerals projects on the National Interest Account; the facility was later expanded.

    AUD 4 bn

    Covers: “Critical Minerals Facility (projects aligned with Australia's Critical Minerals Strategy)”

    critical minerals in general; the source does not name copper

    The publisher's words: “The support will be provided by Export Finance Australia (EFA) through the Government’s $4 billion Critical Minerals Facility (CMF).”
    2 further statements from the source

    expanded to $5 billion; loans and equity support (release of 12 January 2026)

    The publisher's words: “to be drawn from the expanded $5 billion Critical Minerals Facility, which provides government-backed loans and equity support for projects”

    who can access the facility (undated page of Export Finance Australia)

    The publisher's words: “Projects that are aligned with the Critical Minerals Strategy and are otherwise in Australia’s national interest, may be able to access finance through this facility, subject to our due diligence.”
  6. 2024-12-27in force from · United StatesOther supportin force

    Final Treasury regulations for the Section 45X advanced manufacturing production credit, a tax credit for producers of applicable critical minerals in the United States that is set as a share of their production costs.

    Covers: “applicable critical minerals (advanced manufacturing production credit, section 45X)”

    critical minerals in general; the source does not name copper

    The publisher's words: “For any applicable critical mineral, the credit amount is equal to 10 percent of the costs incurred by the taxpayer with respect to production of such mineral.”
    1 further statements from the source

    what the credit is for

    The publisher's words: “the advanced manufacturing production credit established by the Inflation Reduction Act of 2022 to incentivize the production of eligible components within the United States”
  7. 2025-01-29announced · IndiaFundin force

    India's Union Cabinet approved the launch of the National Critical Mineral Mission, which funds the critical minerals value chain, backs the purchase of mineral assets abroad and proposes a national stockpile of critical minerals.

    INR 163 bn

    Covers: “National Critical Mineral Mission (critical mineral resources vital to Green Technologies)”

    critical minerals in general; the source does not name copper

    The publisher's words: “has approved the launch of the National Critical Mineral Mission (NCMM) with an expenditure of Rs.16,300 crore and expected investment of Rs.18,000 crore by PSUs, etc.”
    1 further statements from the source

    assets abroad and a stockpile

    The publisher's words: “It also proposes development of stockpile of critical minerals within the country.”
  8. 2025-03-20signed · United StatesLoan programmein force

    Executive Order 14241 delegates Defense Production Act loan authority for domestic mineral production to the development finance corporation and orders a plan for a dedicated mineral production fund.

    Covers: “a critical mineral, as defined by 30 U.S.C. 1606(a)(3), as well as uranium, copper, potash, gold” · Materials: Copper

    The publisher's words: “establish a dedicated mineral and mineral production fund for domestic investments executed by the DFC”
    3 further statements from the source

    limit of the delegated loan authority

    The publisher's words: “The loan authority delegated by this order is limited to loans that create, maintain, protect, expand, or restore domestic mineral production”

    Export-Import Bank guidance on offtake financing

    The publisher's words: “to secure United States offtake of global raw mineral feedstock for domestic minerals processing”

    minerals covered (definition)

    The publisher's words: “means a critical mineral, as defined by 30 U.S.C. 1606(a)(3), as well as uranium, copper, potash, gold”
  9. 2025-04-18announced · United StatesOther supportin force

    The Federal Permitting Improvement Steering Council began listing critical mineral production projects as FAST-41 transparency projects, which publishes their federal review and permitting schedules; this is a permitting status and carries no money.

    Covers: “critical mineral production projects (transparency projects on the Federal Permitting Dashboard)”

    critical minerals in general; the source does not name copper

    The publisher's words: “Inclusion on the Permitting Dashboard as a transparency project makes the environmental review and authorizations schedule for these vital mineral production projects publicly available”
    2 further statements from the source

    basis in the executive order on mineral production

    The publisher's words: “in response to President Trump’s Executive Order, Immediate Measures to Increase American Mineral Production”

    number of projects by November 20, 2025

    The publisher's words: “50 critical mineral and mining projects are now receiving the benefits of FAST-41 traditional and transparency coverage”
  10. 2025-06-04announced · European UnionOther supportin force

    The Commission adopted the first list of Strategic Projects in third countries under the Critical Raw Materials Act; the status brings coordinated support on access to finance and contacts with offtakers.

    Covers: “13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories” · Materials: Lithium, Nickel, Cobalt, Manganese, Graphite, Rare earths, Copper, Tungsten

    The publisher's words: “The Commission adopted the first list of 13 Strategic Projects on strategic raw materials located outside of the EU, including in overseas countries or territories.”
    3 further statements from the source

    capital investment the 13 projects need (the projects' own cost, not public money)

    The publisher's words: “It is estimated that the 13 Strategic Projects outside of the EU need an overall capital investment of €5.5 billion to start operations.”

    what the status brings

    The publisher's words: “coordinated support by the Commission, Member States and financial institutions in the form of facilitating access to finance and contacts with relevant off-takers”

    where the projects are

    The publisher's words: “seven are located in Canada, Greenland, Kazakhstan, Norway, Serbia, Ukraine, Zambia, with whom the EU has a strategic partnership on raw materials value chains”
  11. 2025-06-17announced · G7Other supportannounced

    G7 leaders launched a Critical Minerals Action Plan with a roadmap for standards-based markets and a call for more public and private capital for critical minerals projects.

    Covers: “critical minerals”

    critical minerals in general; the source does not name copper

    The publisher's words: “We will develop a roadmap to promote standards-based markets for critical minerals”
    3 further statements from the source

    launch of the plan

    The publisher's words: “We are launching a G7 Critical Minerals Action Plan”

    roadmap content

    The publisher's words: “The roadmap will establish a set of criteria that constitute a minimum threshold for standards-based markets”

    capital mobilisation

    The publisher's words: “We encourage our export credit agencies and development finance institutions (DFIs) to identify more opportunities for collaboration”
  12. 2025-08-13announced · United StatesFundannounced

    The Department of Energy announced its intent to issue several funding notices for critical minerals and materials, covering rare-earth supply chains, battery-material processing and recycling, by-product recovery at industrial facilities, and gallium and germanium refining.

    USD 1 bn · “notices of funding opportunities totaling nearly $1 billion”

    Covers: “mining, processing, and manufacturing technologies across key stages of the critical minerals and materials supply chains” · Materials: Rare earths, Gallium, Germanium, Lithium, Graphite, Nickel, Copper, Aluminium

    The publisher's words: “today announced its intent to issue notices of funding opportunities totaling nearly $1 billion to advance and scale mining, processing, and manufacturing technologies”
    3 further statements from the source

    largest notice: processing, battery manufacturing and recycling

    The publisher's words: “MESC is announcing its intent to issue a NOFO of up to $500 million to expand U.S. critical mineral and materials processing and derivative battery manufacturing and recycling”

    rare earth notice

    The publisher's words: “its intent to issue a NOFO of up to $135 million to enhance domestic supply chains for rare earth elements (REEs)”

    a later notice issued under this announcement (by-product recovery, announced November 14, 2025)

    The publisher's words: “DOE expects to award up to $275 million in federal funding with a minimum of 20% cost-sharing from the awardees.”
  13. 2025-10-23announced · United States (with ADQ of Abu Dhabi as a matching investor)Fundannounced

    The U.S. development finance agency DFC committed an investment to the Orion Critical Mineral Consortium, an investment vehicle led by Orion Resource Partners and matched by Orion funds and the Abu Dhabi sovereign investor ADQ.

    USD 1.8 bn · “brings the current size of the consortium to $1.8 billion”

    Covers: “strategic critical minerals projects in DFC-eligible markets”

    critical minerals in general; the source does not name copper

    The publisher's words: “brings the current size of the consortium to $1.8 billion”
    3 further statements from the source

    purpose of the consortium

    The publisher's words: “has created Orion Critical Mineral Consortium (Orion CMC) to invest in strategic critical minerals projects in DFC-eligible markets”

    who matched the commitment

    The publisher's words: “This commitment, which has been matched by both funds managed by Orion Resource Partners and ADQ, an active sovereign investor”

    DFC's own share, from its undated Public Information Summary for the board: a further $900 million on top of $600 million

    The publisher's words: “$900 million in addition to the $600 million already approved”
  14. 2025-11-04published · CanadaFundannounced

    Budget 2025 proposes a Critical Minerals Sovereign Fund at Natural Resources Canada for equity investments, loan guarantees and offtake agreements, and a First and Last Mile Fund.

    CAD 2 bn · “$2 billion over five years, on a cash basis, starting in 2026-27”

    Covers: “critical minerals projects and companies”

    critical minerals in general; the source does not name copper

    The publisher's words: “provide $2 billion over five years, on a cash basis, starting in 2026-27, to Natural Resources Canada to create the Critical Minerals Sovereign Fund”
    3 further statements from the source

    tools of the fund

    The publisher's words: “including equity investments, loan guarantees, and offtake agreements”

    First and Last Mile Fund

    The publisher's words: “provide $371.8 million over four years, starting in 2026-27, to Natural Resources Canada to create the First and Last Mile Fund”

    absorbs the Critical Minerals Infrastructure Fund

    The publisher's words: “would absorb the Critical Minerals Infrastructure Fund and leverage its existing funding envelope to provide up to $1.5 billion in support through 2029-30”
  15. 2025-11-18announced · European UnionJoint purchasingin force

    The Commission opened registrations for the Raw Materials Mechanism, which links buyers and sellers of strategic raw materials and enables demand aggregation, joint purchasing and investment consortia.

    Covers: “buyers and sellers of strategic raw materials (Raw Materials Mechanism under the EU Energy and Raw Materials Platform)”

    critical minerals in general; the source does not name copper

    The publisher's words: “the European Commission opened registrations for the new Raw Materials Mechanism under the EU Energy and Raw Materials Platform”
    3 further statements from the source

    what the mechanism enables

    The publisher's words: “enable cooperation between companies, such as demand aggregation, joint purchasing, and investment consortia”

    first matchmaking round

    The publisher's words: “The first matchmaking round will launch in Q1 2026.”

    later result (press release of 9 October 2026)

    The publisher's words: “the Raw Materials Mechanism, established to aggregate demand and supply and identify potential offtakers, has generated more than 30 matches for 10 materials”
  16. 2025-11-22published · United KingdomFundannounced

    The UK critical minerals strategy Vision 2035 announces public funding for critical mineral projects and says stockpiling through procurement will be considered for the defence sector.

    GBP 50 M · “up to £50 million”

    Covers: “critical mineral projects in the UK”

    critical minerals in general; the source does not name copper

    The publisher's words: “funding of up to £50 million will be made available by DBT to support critical mineral projects”
    2 further statements from the source

    stockpiling under consideration

    The publisher's words: “Measures could include stockpiling, including through procurement mechanisms”

    later programme page (published 22 June 2026): grant share

    The publisher's words: “with £45 million of this available as grant funding”
  17. 2025-11-24published · United KingdomLoan programmein force

    UK Export Finance opened the Critical Goods Export Development Guarantee, a partial state guarantee on commercial loans to UK-based suppliers of critical mineral products, alongside its existing Critical Minerals Supply Finance.

    Covers: “UK-based businesses that supply critical mineral products to UK exporters (minerals of the UK Criticality Assessment 2024 and growth minerals)”

    critical minerals in general; the source does not name copper

    The publisher's words: “The Critical Goods Export Development Guarantee (Critical Goods EDG) is now available for UK-based businesses that supply critical mineral products to UK exporters.”
    3 further statements from the source

    share guaranteed (the page's worked example)

    The publisher's words: “UKEF provides an 80% guarantee, reducing the lender’s risk and enabling them to provide the loan to the UK manufacturer”

    existing product for overseas suppliers

    The publisher's words: “UKEF’s existing Critical Minerals Supply Finance, which provides finance for overseas companies that have agreements in place to supply critical minerals products to UK exporters”

    minerals covered

    The publisher's words: “minerals listed in the UK Criticality Assessment 2024 as well as growth minerals such as beryllium, chromium, copper and uranium”
  18. 2026-01-14signed · United StatesPrice floorannounced

    Presidential proclamation under section 232 directing negotiations on imports of processed critical minerals, in which price floors for trade in critical minerals are to be considered.

    Covers: “processed critical minerals and their derivative products (PCMDPs)”

    critical minerals in general; the source does not name copper

    The publisher's words: “the Secretary and the Trade Representative should consider price floors for trade in critical minerals and other trade-restricting measures”
  19. 2026-02-02announced · United StatesStockpileannounced

    The Export-Import Bank approved a direct loan for Project Vault, a public-private partnership that is to establish a U.S. Strategic Critical Minerals Reserve storing raw materials for manufacturers.

    USD 10 bn · “a Direct Loan of up to $10 billion”

    Covers: “essential raw materials”

    critical minerals in general; the source does not name copper

    The publisher's words: “the EXIM Board of Directors approved a Direct Loan of up to $10 billion to Project Vault”
    4 further statements from the source

    what it establishes

    The publisher's words: “a supply chain security initiative establishing the U.S. Strategic Critical Minerals Reserve”

    storage

    The publisher's words: “that will store essential raw materials in facilities across the United States”

    borrower structure

    The publisher's words: “providing long-term financing to a partnership between original equipment manufacturers and private sector capital providers”

    later EXIM release of May 4, 2026 restating the loan

    The publisher's words: “The transaction includes a direct loan of up to $10 billion”
  20. 2026-06-11published · ArgentinaOther supportin force

    Argentina's large-investment incentive regime (RIGI), created by law 27.742, grants approved single-project vehicles tax, customs and foreign-exchange incentives; the Economy Ministry published an official register of approved and pending projects, mining among the sectors.

    Covers: “Régimen de Incentivo para Grandes Inversiones (RIGI); sectores estratégicos como energía, petróleo y gas, minería, infraestructura y energías renovables”

    critical minerals in general; the source does not name copper

    The publisher's words: “El Ministerio de Economía puso a disposición del público una nueva página web con la información oficial y actualizada sobre el Régimen de Incentivo para Grandes Inversiones (RIGI)”
    4 further statements from the source

    projects approved by resolution on that date (all sectors)

    The publisher's words: “16 proyectos US$ 29.892 millones de inversión”

    legal basis, as recited in a mining approval (Resolución 801/2026)

    The publisher's words: “Que por la ley 27.742 se creó el Régimen de Incentivo para Grandes Inversiones (RIGI)”

    tax and customs incentives applied to an approved mining project (Resolución 801/2026)

    The publisher's words: “aplicación de los incentivos tributarios y aduaneros establecidos por el capítulo IV del título VII de la ley 27.742”

    foreign-exchange incentives applied to an approved mining project (Resolución 801/2026)

    The publisher's words: “los incentivos cambiarios previstos en el capítulo V del título VII de la ley 27.742”
  21. 2026-07-15announced · GermanyFundannounced

    Germany's raw materials fund, through which KfW takes equity stakes in mining, processing and recycling companies on behalf of the federal government, is to be enlarged; the increase is subject to the budget procedure in parliament.

    EUR 1.5 bn · “auf insgesamt 1,5 Milliarden Euro”

    Covers: “Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen”

    critical minerals in general; the source does not name copper

    The publisher's words: “Es ist beabsichtigt, die Mittel für Rohstoffprojekte zur Gewinnung, Verarbeitung und zum Recycling von kritischen Rohstoffen auf insgesamt 1,5 Milliarden Euro aufzustocken.”
    4 further statements from the source

    the increase is not yet legislated

    The publisher's words: “Die Aufstockung des Rohstofffonds ist Gegenstand des anstehenden parlamentarischen Haushaltsverfahrens.”

    the two investments made so far

    The publisher's words: “150 Millionen Euro Eigenkapital für die klimaneutrale Lithiumförderung von Vulcan Energy Resources sowie 50 Millionen Euro für ein Projekt zur Förderung von Seltenen Erden des Unternehmens Arafura Rare Earths”

    original mandate of the fund (undated KfW factsheet)

    The publisher's words: “beauftragt, bis zu 1 Mrd. EUR in das Eigenkapital von Bergbau-, Verarbeitungs- und Recyclingunternehmen zu investieren”

    who decides (KfW notice of 1 April 2026 on the second investment)

    The publisher's words: “Die Entscheidung, ob in ein Projekt investiert wird, trifft indes der Bund.”
  22. 2026-07-22announced · ItalyFundin force

    Italy's National Made in Italy Fund became operational with the appointment of its two managers; its companies arm takes equity stakes with particular attention to the whole value chain of critical raw materials.

    EUR 900 M · “dotazione complessiva di 900 milioni di euro”

    Covers: “filiere strategiche nazionali e sicurezza degli approvvigionamenti di materie prime critiche (dall’estrazione fino al riciclo e al riuso)”

    critical minerals in general; the source does not name copper

    The publisher's words: “il Fondo dispone di una dotazione complessiva di 900 milioni di euro per rafforzare le filiere strategiche nazionali e garantire la sicurezza degli approvvigionamenti di materie prime critiche”
    3 further statements from the source

    the fund enters its operational phase

    The publisher's words: “il Fondo Nazionale del Made in Italy (FNMI) entra nella fase operativa”

    companies arm (equity)

    The publisher's words: “Il Fondo Imprese, con una dotazione di 600 milioni di euro, realizzerà invece investimenti diretti e indiretti, a condizioni di mercato, nel capitale delle imprese operanti nelle filiere strategiche.”

    critical raw materials value chain

    The publisher's words: “Particolare attenzione sarà riservata all’intera catena del valore delle materie prime critiche: dall’estrazione alla lavorazione e alla trasformazione, dall’approvvigionamento alla distribuzione, fino al riciclo e al riuso.”
  23. 2026-09-15published · European UnionStockpileannounced

    The Commission called for expressions of interest to select the entity that will design, set up and run a pilot stockpiling mechanism for critical raw materials.

    Covers: “pilot stockpiling mechanism for critical raw materials”

    critical minerals in general; the source does not name copper

    The publisher's words: “The purpose of this call is to determine the entity that will be designated to carry out the stockpiling pilot project.”
    2 further statements from the source

    what the entity is to do

    The publisher's words: “supporting the design, set-up, procurement, storage, management, release and operational testing of a pilot stockpiling mechanism for critical raw materials”

    deadline

    The publisher's words: “Deadline for submitting applications 09/10/2026”

The instruments whose source names copper are also marked on the price chart above, at the month of their date. A mark does not say the instrument moved the price.

These figures are informational, not financial advice.

Sustainability

Four indicators, the same on every profile. Each is a figure with its unit, year and source, or a plain statement that there is none.

  • Carbon

    Grid-carbon proxy: the grid intensity of the refining countries, weighted by their share of refining.

    444gCO2e/kWh

    2025Estimated

    None of the other 11 materials with a computed proxy has a lower figure.

    • Covers the countries behind 93% of refinery output (Refinery production, 2025).
    • Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.
  • Water

    Share of the material's mine sites on record that lie in high or extremely high baseline water stress.

    23%of mine sites on record

    2023Estimated

    Higher than 80% of the other 25 materials with rated mine sites.

    • 127 of 554 sites with a class (554 mine and brine sites on record).
    • Counted by site, not by tonnage: it is not a share of production.
    • "Arid and Low Water Use" is a class of its own in the source and is not counted as high.
  • Land

    Land visibly used by mining.

    Not available per material: the area is mapped per country for all commodities together.

    • Mapped from satellite images for all mining in a country. It cannot be attributed to one material or one site.
  • Circularity

    Recycling's share of EU demand (end-of-life recycling input rate).

    55%of EU demand

    2022Reported

    Higher than all 18 other elements in the atlas with a published EU rate.

    • Published for the EU as a whole. It cannot be compared with world shares.
    • End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed.
    • 6 EU targets apply to this material; they are listed below.

There is no overall score: the four figures measure different things and are not added up. How to read these figures

The figures behind the indicators

Grid-carbon proxy for refining

estimated · proxy

444gCO2e per kWh

Covers the countries behind 92.7% of refinery output (Refinery production, 2025)

CountryShare of refiningGrid intensity
China48.3%5282025
Congo (Kinshasa)9.7%282024
Chile5.9%2912025
Japan4.8%4742025
Russia3.3%4472025
United States2.9%3842025
India2.1%6712025
Germany2.1%3342025
Korea, Republic of2.1%4182025
Poland1.9%5912025
Kazakhstan1.7%8132025
Mexico1.7%4812025
Australia1.6%5182025
Indonesia1.4%7052025
Peru1.2%2382025
Canada1.1%1922025
Zambia0.9%1262024

Average grid emissions intensity of the countries that refine the material, weighted by each country's share of refinery output in the source table. Countries without a grid figure are left out and the covered share is stated. A proxy for the electricity behind refining, not a product footprint: plants may run on their own power.

Water stress where the mines are

estimated · by site

22.9%of mine sites on record lie in high or extremely high water stress (127 of 554)

  • Low (<10%)229 sites
  • Low - Medium (10-20%)36 sites
  • Medium - High (20-40%)31 sites
  • High (40-80%)20 sites
  • Extremely High (>80%)107 sites
  • Arid and Low Water Use131 sites

Of the mines and brine operations the atlas has on record for the material, the share that lies in a sub-basin with high or extremely high baseline water stress (WRI Aqueduct 4.0). Counted by site, not by tonnage: the atlas has no output figure for most sites, so this is not a share of production. "Arid and Low Water Use" is the source's own class for dry sub-basins with little demand; it is shown apart (hatched) because it is not a stress level.

Circularity

Recycling's share of EU demand (end-of-life recycling input rate)

Material2013201620192022
Copper20%55%16.9%55%

End-of-life recycling input rate: the share of EU demand met by recycling old scrap. EU only. Values differ between assessment years partly because the method changed. The latest published figure is for 2022.

EU targets that apply

Read in the original Official Journal version; later amendments are not reflected.

Risks & policy

Export controls in force

Compiled by USGS, effective January 2026. Not a live feed.

  • ▲ BanIndonesia2023

    Export ban: Bauxite (2023), copper concentrates (2023), and nickel ore (2020).

    Source ↗
  • ▲ BanLaos2024

    Export ban: Raw minerals, including copper, gold, iron, nickel, potassium, silver, and zinc (2024).

    Source ↗
  • ▲ BanTanzania2017

    Export ban: Ore concentrates of copper, gold, nickel, and silver (2017).

    Source ↗
  • ▲ BanVenezuela2024

    Export ban: Bauxite, cassiterite, columbite-tantalite, copper, gold, rhodium, silver, and thorium (2024).

    Source ↗
  • ▲ LicenceMorocco2025

    Export licensing requirement: Copper (refined and alloys) and aluminum ingots (2025).

    Source ↗

Chokepoints at sea

The atlas has no record of which minerals pass through which sea passage, so no chokepoint figure is attached to this profile. Current ship counts for the main passages are on the Live page. Open the Live page

What if?

Three calculators run on the figures of this profile. Each shows its formula and what it leaves out; none is a forecast.

What the atlas does not know about copper

How much of the chain is on record, which producer countries have no site in the atlas, how mining and refining compare, and whether a price is open.

Data coverage

Mines on record: 87% (14/14)

Plants on record: 22.4% (11/17)

Owner or operator known: 82% (11/14)

Assurance known: no public assurance list is ingested yet

  • Mines:87% of world output lies in countries with a record (14 of 14 countries)(Mine production, 2025)

    Every country in the table has a record.

  • Processing plants:22% of world output lies in countries with a record (11 of 17 countries)(Refinery production, 2025)

    Producer countries without a record: China 48%, Congo (Kinshasa) 9.7%, Japan 4.8%, Russia 3.3%, Germany 2.1%, Korea, Republic of 2.1%

  • Owners and operators:82% of world output lies in countries with a record (11 of 14 countries)(Mine production, 2025)

    Producer countries without a record: Kazakhstan 3.1%, Poland 1.8%, India 0.1%

  • Assurance: No public assurance list is ingested yet

A country in these lists marks missing data, not missing industry.

Mining and refining: who leads

  • USGS MCS 2026, 2025 (estimated)

    • Mining:Chile 23% (about 1 in 4), 2025
    • Refining:China 48% (about half), 2025
  • IEA GCMO 2026, 2025

    • Mining:Chile 24% (about 1 in 4), 2025
    • Refining:China 47% (about half), 2025

Price transparency

An open price series exists: Copper, monthly average. It is on the Money tab.

Add dataAll gaps, across materials

Sources

Every source this profile uses, with its licence, the years its figures describe and how sure the figures are. Each chip on the profile opens the single record.

Source registry for this material

History & talk

Revision history and discussion are coming soon.

Every change to a figure will be listed here with its source, its credit and its review, and each profile will have a place to discuss it. Until then the data changes only when a source is updated, and every figure links to that source.

What can be contributed today

Talk

Questions, doubts and pointers about this page. Anyone can write; a reviewer reads each comment before it appears. Comments are public: no personal data, please.

Nobody has written here yet.

Report an error or suggest something

How to cite OpenOre

Lorenzo Sivillica (2026). OpenOre: open data on raw-material supply chains, data release v1.1. OpenOre, https://openore.org. DOI pending (Zenodo).

The dataset's DOI is pending: the first release is being deposited on Zenodo. Data and downloads · Licence: ODbL 1.0

Type the name of a material, a country, a site or a company.